भारत सरकार
Government of India
वविदुत मदंतााल
Ministry of Power
के न्द्ल मवविदुत मप्ाविकरणo
Central Electricity Authority
वविदतु मप्णoााद् मलजन ा मवविं मदलू लांक -I मप्भाग
Power System Planning & Appraisal-I Division
सेवा मे / मTo,
Shri Chatar Dev Singh,
Sitac Kabini Renewables Private Limited
507-508, Ashoka Estate,
24 Barakhambha Road, New Delhi – 110001.
वविषल म: मववदतु अविवनिम, 2003 मकी िारा 68(1) मके तहत M/s Sitac Kabini Renewables Private Limited
(SKRPL) को पारे षण िोजना “Connectivity to M/s Sitac Kabini Renewables Private
Limited for its proposed 300 MW wind farms in Bhuj, Gujarat ” के वलिे भारत सरकार का पवू र
अनमु ोदन – सम्वं ित
Sub: Prior approval of the Government of India under section 68(1) of the Electricity Act,
2003 to M/s Sitac Kabini Renewables Private Limited (SKRPL) for the transmission
scheme “Connectivity to M/s Sitac Kabini Renewables Private Limited for its proposed
300 MW wind farms in Bhuj, Gujarat” - reg.
सदं भर म म/Reference:
(i) SKRPL letter no. SKRPL/CEA/Sec68/2019-20/01 dated 05.08.2019
(ii) SKRPL letter no. SKRPL/CEA/Sec68/2019-20/02 dated 03.09.2019
Sir,
M/s Sitac Kabini Renewables Private Limited (SKRPL) vide its letters under reference has
sought prior approval of the Government of India under section 68 (1) of the Electricity Act,
2003 for the transmission scheme “Connectivity to M/s Sitac Kabini Renewables Private
Limited for its proposed 300 MW wind farms in Bhuj, Gujarat ” with the following scope of
work:
i. Sitac Kabini Renewables Private Limited – Bhuj-II PS 220 kV S/c line along with
associated bays at generator end
(Bays at ISTS sub-station end shall be under the scope of Transmission licensee
owning the ISTS sub-station subject to compliance of relevant provisions of tariff
policy)
सेवा भवन, आर. के . परु म-I, नई वदिल्ल-110066 टेल्लफैकस: 011-26102045 ईमेल: cea-pspa1@gov.in वे्साइट: www.cea.nic.in
Sewa Bhawan, R.K Puram-I, New Delhi-110066 Telefax: 011-26102045 email: cea-pspa1@gov.in Website: www.cea.nic.in
File No.CEA-PS-11-23(20)/1/2018-PSPA-I Division 529
I/6911/2019
2. The above transmission scheme with its specified scope of work has been discussed
and agreed in 32nd meeting of WR Constituents regarding Connectivity and LTA
applications held on 26.11.2018.
3. CEA conveys the prior approval of Government under Section 68(1) of Electricity
Act, 2003 to M/s Sitac Kabini Renewables Private Limited for the following overhead
line under the transmission scheme “Connectivity to M/s Sitac Kabini Renewables
Private Limited for its proposed 300 MW wind farms in Bhuj, Gujarat”:
i. Sitac Kabini Renewables Private Limited – Bhuj-II PS 220 kV S/c line (with
AL59 Moose conductor)
Line length is approx. 55 km, which would be implemented in two sections from
SKRPL switchyard to Bhuj-II PS:
(a) Section 1: 53 km 220 kV S/c line on D/c towers from SKRPL switchyard
to M/c tower starting point
(b) Section 2: 2 km 220 kV S/c line on M/c towers (comprising of 4 ckts)
from M/c tower starting point to Bhuj-II PS
सेवा भवन, आर. के . परु म-I, नई वदिल्ल-110066 टेल्लफैकस: 011-26102045 ईमेल: cea-pspa1@gov.in वे्साइट: www.cea.nic.in
Sewa Bhawan, R.K Puram-I, New Delhi-110066 Telefax: 011-26102045 email: cea-pspa1@gov.in Website: www.cea.nic.in