Preface
PLN Statistics 2019 contains information on performances of PT PLN (Persero) and its
Subsidiary Companies for Calender Year 2019 as well as the preceding years.
Data are presented in the form of tables with a breakdown for each Province within PLN’s
Regional and Distribution Offices. Graphics are included to highlight important information.
Constructive comments and feedback are expected for the improvement of the presentation,
and will be incorporated in the next publication.
PT PLN (Persero)
1. Generation
Installed Capacity
At the end of Desember 2019 PT PLN (Persero) and Subsidiary Companies owned and operated about 5,987 generating
units with total installed capacity of 43,856.58 MW, of which 30,368.23 MW (69.24%) was installed in Java.
The total installed capacity increased 5.18% compared to the end of December 2018.
The total generating plant capacity broken down by type of power plant as follow : Steam Turbine 20,750.50 MW (47.31%),
Combine Cycle 10,708.76 MW (24.42%), Diesel 3,692.38 MW (8.42%), Gas Engine 1,336.93 MW (3.05%), Hydro 3,583.98
MW (8.17%), Gas Turbine 3,188.90 MW (7.27%), Geothermal 579.50 MW (1.32%), Solar Cell and Wind 15.62 MW (0.04%).
Total installed capacity included rental and IPP were 62,832.70 MW.
Peak Load*)
The system peak load for the calendar year 2019 was 41,670.85 MW, increased 7.48% over the previous year. The peak
load for the Java Bali system was 26,658 MW. This is down 1.52% over the previous year.
The total production (including purchase from utilities outside PLN) during the CY 2019 was 270,975.97 GWh, an increased of
3,890.59 GWh or 1,46% over the previous year. Of this energy production, the energy purchased from other utilities outside
PLN amounted 84,518.74 GWh (30.30%). This was increased 6,131.82 GWh or 7,82% over the previous year.
At the end of CY 2019, the total transmission lines was 59,959.05 kmc of which about 5,249.52 kmc was 500 kV, 3,647.65
kmc was 275 kV, 44,563.86 kmc was 150 kV, 5,397.06 kmc was 70 kV and 100.95 kmc was 25 and 30 kV transmission levels.
The total length of distribution lines amounted of 979,855.37 kmc of which about 401,421.90 kmc was medium voltage lines
(20 kV, 12 kV, 6-7 kV distribution networks) and 578,433.47 kmc was low voltage lines (220/380 V).
The total capacity of substation transformers operated was 144,408 MVA, increased by 10.10% over the previous year. The
total substation transformers was 2,123 unit. This consisted of 75 substation transformers with 500 kV system, 37 substation
transformers with 275 kV system, 1,748 substation transformers with 150 kV system, 261 substation transformers with 70
kV system and 2 substation transformers with < 30 kV system.
Total capacity of distribution substation transformers increased by 5.20% to be 59.049 MVA and the total substation transformers
increased by 5.29% to be 508,039 units.
3. Energy Sales
PLN’s total energy during the year 2019 was 245,518.17 GWh, up 4.65% from the previous year. Among group of customers,
energy sold to Residential was the major share, consuming 103,733.43 GWh (42.25%) followed by Industry 77,878.65 GWh
(31,72%), Commercial 46,901.25 GWh (19.10%), and Others (social, government office building, and public street lighting)
17,004.83 GWh (6.92%).
Electricity sold to Residential, Industry, Commercial, and Others group of customers increased by 6.03%, 1.21%, 6.53%,
and 7.55%.
Total number of customers was 75,705,614 at the end of 2019. This was up 5.27% from the end of 2018.
PLN’s average power rate per kWh throughout the CY 2019 was 1,130 Rp/kWh, was increased compared previous year of
1,123.00 Rp/kWh.
4. Energy Losses
During the CY 2019, energy losses were 9.32%, consisting of 2.26% transmission losses and 7.24% distribution losses. This
was better than the previous year 9.51
5. Electrification Ratio
With the growth of total number of residential customers from 66,071,133**) at the end of CY 2018 to 69,619,877 at the end
of 2019, the electrification ratio reached around 95,75%.
6. Financial
In CY 2019, total operation revenues reached Rp. 285,640,589 million out of which electric revenues came to Rp.
276,061,925 (96.65%), connection fees Rp. 6,934,597 million (2.43%) and other operation revenues Rp. 2,644,067
million (0.93%).
Total operation cost amounted Rp. 315,440,938 million. Government subsidy Rp. 51,711,774 million, and compensation
income of Rp. 22,253,517 million, operating profit after subsidies was Rp.44,164,942 million, an increase compared to
the achievement of operating profit in 2018 which amounted to Rp. 35,984,071 million.
The total asset amounted to approximately Rp. 1,585,055,013 million, increased 6.35% from the previous year.
7. Human Resources
By the end of December 2019, the total number of PLN employees was 54,129 employee. Employees productivity was 4,536
MWh/employee and 1,399 customer/employee.
kWh gross production is the energy (kWh) generated by the generator before deducting the energy
used for own purpose (for auxiliary equipment, station lighting, etc,) or the production of electric
energy measured at the generator terminal.
Installed capacity is the capacity of one generating unit as written on the generator name plate
or on the prime mover, which of both is the smaller. Particularly for Gas Turbine Power Plants, the
installed capacity is as written on the name plate based on the base-load and not on the peak-load.
kWh total production is the total kWh produced by the generator of the PLN unit in question plus
the kWh received from the other PLN units plus the kWh purchased from outside PLN (if any).
Peak Load is the highest load over reached by each system in the calendar year in question.
Σ kW peak load
x 100%
Σ kVA connected x cos ϕ
cos ϕ = 0,8
kWh netto production is the energy (kWh) generated by the generator, plus the energy (kWh)
received from the other PLN Unit, plus the energy (kWh) purchased from outside PLN and rented
(if any), minus the energy (kWh) used for central own purpose.
kWh transmission losses is kWh netto production, minus the energy (kWh) used for substation
transformer own purpose, minus the energy (kWh) sent to other PLN Unit and outside PLN, minus
the energy (kWh) sent to Distribution.
kWh distribution losses is the energy (kWh) sent to Distribution, minus the energy (kWh) used for
distribution substation transformer own purpose, minus the energy (kWh) sold.
Σ (Duration of customers who are blackout x Number of customers who are blackout)
Number of customers
Number of customers
**) Blackout at distribution lines which are experienced by customers, due to interruption or
maintenance at generation as well as transmission lines (Circular of the PLN BOD.
(SE Direksi PLN No. SE.031.E/471/PST/1993).
1.7. SOD (System Outage Duration) : Interruption duration which cause blackout
SOD (System Outage Duration) is a performance indicator of outage duration which cause blackout
at services point of transmission lines, measured with hours per 100 kmc.
SOF (System Outage Frequency) is a performance indicator of outage number which cause blackout
at services point of transmission lines, measured with times per 100 kmc.
2. Data grouping
In the data on Hydro (Hydro Power Plant/HPP) have been included the data on Mini/micro Hydro
Power Plant (MHPP), i.e. hydro power plants with a generating capacity of 1,000 kW and less
(Circular letter No. 006/PST/88).
Residential group : i.e. the total of tariff categories S-1, R-1, R-2, and R-3
Business group : i.e. the total of tariff categories B-1, B-2, B-3, T, C and M.
Industrial group : i.e. the total of tariff categories I-1, I-2, I-3, and I-4.
Government office building group : i.e. the total of tariff categories P-1 and P-2.
Low Voltage is total of tariff categories S-1, S-2, R-1, R-2, R-3, B-1, B-2, I-1, I-2, P-1 and P-3.
Medium Voltage is total of tariff categories S-3, B-3, I-3, P-2, Traction (T) and C (Bulk).
Multipurpose is multipurpose tariff just for special electric power consumer with special
demand of quality which could not be included to S, R, B, I, P, T (Traction) and C (Bulk)
Category.
3. Energy Sold
The energy sold to customer is the energy (kWh) sold to HV (high voltage), MV (medium voltage) and LV
(low voltage) customers according to the total kWh, for which the bill is made (TUL III-09).
4. Data status
The year 2019 means one calendar year as from 1 January 2019 to 31 December 2019.
5. Abbreviations
Standard Cubic Foot (SCF) is the amount of gas needed to fill a space of 1 cubic Foot with an absolute
pressure of 14.7 pound per square inch at temperature of 60 degree Fahrenheit in a dry condition.
1000 BTU Gas is Gas having a Gross Heating Value of 1,000 BTU per SCF.
Gross Heating Value is the amount of heat expressed in BTU units resulting from the combustion of
1 standard cubic foot of gas, at temperature of 60 degrees Fahrenheit and absolute pressure of 14.7
pounds per square inch, with air at the same temperature and pressure as the gas and after cooling of
the combustion result at the initial temperature of the gas and air, the vapour formed in the combustion
process is condensed in liquid form.
Preface ii
Summary iii
Explanation v
Contents x
Operation Result
Table 4 : Number of Customers by Type of Customers 5
Table 5 : Connected Capacity by Type of Customers (MVA) 6
Table 6 : Energy Sold by Type of Customers (GWh) 7
Table 7 : Revenue by Type of Customers (million Rp) 8
Table 8 : Average Energy Sold by Customers (kWh) 9
Table 9 : Average Tariff Selling of Electricity by Type of Customers (Rp/kWh) 10
Table 10 : Number of Customers by Type of Voltage 11
Table 11 : Connected Capacity by Type of Voltage (MVA) 12
Table 12 : Energy Sold by Type of Voltage (GWh) 13
Table 13 : Revenue by Type of Voltage (million Rp) 14
Table 14 : Number of Customers, Connected Capacity and Energy Consumption
by Tariff Category 15
Table 15 : Waiting List 16
Table 16 : SAIDI and SAIFI 17
Table 17 : SOD and SOF 18
Table 18 : Number of Distribution Interruption per 100 kmc 19
Table 19 : Electrification Ratio and Energy Consumption per Capita 20
Generation
Table 20 : Number of Generating Units 21
Table 21 : National Installed Capacity (MW) 22
Table 22 : Rated Capacity (MW) 23
Table 23 : Energy Production by Type of Power Plant (GWh) 24
Table 24 : Consumption of Fuel 26
Table 25 : Unit Price of Fuel 27
Table 26 : Energy Production by Type of Fuel (GWh) 28
Table 27 : Captive Power 29
I. OPERATION
Table 43 : Load Factor, Capacity Factor and Demand Factor (%) 49
Table 44 : Number of Customer by Type of Customers 49
Table 45 : Connected Capacity by Type of Customers (MVA) 50
Table 46 : Energy Sold by Type of Customers (GWh) 50
Table 47 : Average Energy Sold by Type of Customers (kWh) 51
Table 48 : Revenue by Type of Customers (million Rp) 51
Table 49 : Average Tariff Selling of Electricity by Type of Customers (Rp/kWh) 52
Table 50 : Number of Customers by Type of Voltage 52
Table 51 : Energy Sold by Type of Voltage (GWh) 53
Table 52 : Revenue by Type of Voltage (million Rp) 53
Table 53 : Own Use and Energy Losses 54
Table 54 : Number of Generating Units 54
Table 55 : Installed Capacity (MW) 55
Table 56 : Rated Capacity (MW) 55
II. FINANCIAL
Table 62 : Balance Sheet (million Rp) 59
Table 63 : Profit and Loss (million Rp) 60
Table 64 : Fixed Asset and Depreciation (million Rp) 60
Table 65 : Accounts Receivable (million Rp) 61
Table 66 : Sales, Accounts Receivable and Average Collection Rate 61
Table 67 : Generation Cost (million Rp) 62
Table 68 : Average Generation Cost (Rp/kWh) 62
Table 69 : Financial Ratios 63
Graph 5 : Revenues (billion Rp) 64
Graph 6 : Energy Losses (%) 65
Graph 7 : Installed Capacity (MW) 65
Graph 8 : Energy Production (GWh) 66
Outside Java 32,586.10 525.22 88,249.12 36,564.16 7,026.06 2,678.91 6.15 73,497.42 44.87 0.06
UID East Java 15.00 - 39,296.96 86.36 8.51 0.03 0.03 39,406.79 - -
UID Central Java and Yogyakarta 74.58 - 29,442.29 - - - - 29,516.87 - -
UID West Java 232.03 - 54,465.80 - - - - 54,697.83 - -
UID Jakarta Raya - - 37,641.67 - - - - 37,641.67 - -
UID Banten 37.68 - 26,283.81 0.92 - - - 26,322.41 - -
PJB Sulawesi - - - 12.38 - 0.29 2.32 12.10 - -
PT Indonesia Power - - -9.11 39,061.34 51.52 1,577.41 4.03 37,526.34 - -
PT PJB - - -2.37 23,300.60 - 908.60 3.90 22,389.64 - -
UIP2B 51,573.36 346.06 142,640.57 - - - - 194,213.93 94.37 0.05
UIK Tanjung Jati B - - 11.63 21,716.38 - 1,337.98 6.16 20,390.03 - -
UIK Western Part of Java - - 75.96 26,089.74 - 1,219.12 4.67 24,946.58 - -
UIK Central Part of Java - - 80.26 24,794.22 - 1,381.54 5.57 23,492.94 - -
UIK Eastern Part of Java, Bali and Nusra - - 57.19 14,831.12 - 807.05 5.44 14,081.26 - -
Java 51,932.65 346.06 329,984.67 149,893.06 60.03 7,232.02 4.82 194,653.72 94.37 0.05
Indonesia 84,518.75 871.28 - 186,457.22 7,086.09 9,910.95 5.12 269,022.39 139.24 0.05
*) Production in Project using kWh Netto
**) Include Other Unit PLN
***) In Statistic Book of 2019 without kWh E-Min = 2.577,51 GWh and In Statistic Book of 2018 without kWH E-Min = 2.532,65 GWh
- - 107.87 3,053.31 33.05 - 267.70 8.77 267.70 8.47 300.75 9.51 2,752.56 87.07
- - 475.97 12,011.57 93.02 - 1,144.17 9.53 1,144.17 9.16 1,237.19 9.91 10,774.38 86.28
- - 44.64 3,665.28 1.96 - 247.77 6.76 247.77 6.68 249.73 6.73 3,415.55 92.07
5.49 0.09 44.87 6,052.13 16.99 - 559.47 9.24 564.96 9.26 581.95 9.54 5,475.67 89.72
- - 649.01 9,020.49 9.10 - 976.11 10.82 976.11 10.09 985.21 10.19 8,035.28 83.10
10.01 0.82 - 1,207.77 - - 50.93 4.22 60.94 5.00 60.94 5.00 1,156.85 94.91
- - 53.08 5,337.54 80.42 - 607.19 11.38 607.19 11.26 687.61 12.76 4,649.93 86.26
- - 7.28 2,880.68 19.93 - 319.59 11.09 319.59 11.07 339.52 11.76 2,541.16 87.99
245.49 2.42 9,881.05 - - - - - 245.49 2.42 245.49 2.42 - -
- - 1.25 4,539.78 0.11 - 405.19 8.93 405.19 8.92 405.31 8.93 4,134.47 91.05
- - 284.85 4,216.76 0.96 - 307.06 7.28 307.06 6.82 308.02 6.84 3,908.74 86.83
- - - 3,888.70 2.33 - 456.00 11.73 456.00 11.73 458.33 11.79 3,430.37 88.21
- - 26.26 7,864.36 3.48 - 658.63 8.37 658.63 8.35 662.10 8.39 7,202.26 91.28
186.05 1.70 10,685.17 38.93 0.00 - 38.93 100.00 224.97 2.06 224.97 2.06 - -
5.62 0.48 - 1,172.56 11.26 - 120.00 10.23 125.61 10.64 136.88 11.59 1,041.30 88.20
13.29 0.74 - 1,777.27 58.99 - 172.96 9.73 186.25 10.40 245.24 13.69 1,545.32 86.28
- - - 5,968.64 7.74 - 322.33 5.40 322.33 5.40 330.07 5.53 5,638.57 94.47
22.60 1.08 - 2,060.37 0.21 - 134.59 6.53 157.19 7.54 157.40 7.55 1,925.58 92.39
12.99 1.19 - 1,076.28 0.11 - 86.39 8.03 99.38 9.12 99.49 9.13 989.78 90.80
5.57 0.18 436.53 2,570.23 1.96 - 108.22 4.21 113.78 3.78 115.74 3.84 2,460.05 81.63
- - 12,349.97 0.13 - - 0.13 100.00 0.13 - 0.13 - - -
- - 10,625.23 - - - - - - - - - - -
1,004.46 2.67 36,639.48 - - - - - 1,004.46 2.67 1,004.46 2.67 - -
1,511.57 2.04 82,312.51 78,402.77 341.62 6,983.33 8.91 8,494.90 11.47 8,836.52 11.94 71,077.82 96.01
- - - 39,406.79 38.70 - 2,542.96 6.45 2,542.96 6.45 2,581.66 6.55 36,825.13 93.45
- - 0.32 29,516.55 20.46 - 1,992.06 6.75 1,992.06 6.75 2,012.52 6.82 27,504.03 93.18
- - 421.83 54,275.99 124.72 - 3,683.87 6.79 3,683.87 6.73 3,808.59 6.96 50,467.40 92.27
- - 1,377.84 36,263.83 127.98 - 2,446.75 6.75 2,446.75 6.50 2,574.73 6.84 33,689.10 89.50
- - 1,498.18 24,824.24 89.50 - 1,357.57 5.47 1,357.57 5.16 1,447.07 5.50 23,377.17 88.81
- - 12.10 - - - - - - - - - - -
- - 37,526.34 - - - - - - - - - - -
- - 22,389.64 - - - - - - - - - - -
4,561.77 2.34 189,903.86 - - - - - 4,561.77 2.34 4,561.77 2.34 - -
- - 20,390.03 - - - - - - - - - - -
- - 24,946.58 - - - - - - - - - - -
- - 23,492.94 - - - - - - - - - - -
- - 14,081.26 - - - - - - - - - - -
4,561.77 2.34 336,040.92 184,287.40 401.37 - 12,023.20 6.52 16,584.97 8.51 16,986.34 8.71 171,862.83 88.14
6,073.34 2.26 119.63 262,690.17 742.99 - 19,006.53 7.24 25,079.87 9.32 25,822.86 9.60 242,940.66 90.30
UIW Aceh 1,303,772 3,236 126,752 46,098 11,424 2,086 1,493,368 1.97
UIW North Sumatera 3,560,516 4,401 142,679 70,347 10,460 16,710 3,805,113 5.03
UIW West Sumatera 1,239,902 516 131,781 35,352 6,337 3,563 1,417,451 1.87
UIW Riau and Riau Archipelago 1,794,343 443 160,707 37,535 8,234 4,489 2,005,751 2.65
- Riau 1,558,844 343 133,831 32,641 6,075 3,491 1,735,225 2.29
- Riau Archipelago 235,499 100 26,876 4,894 2,159 998 270,526 0.36
UIW South Sumatera, Jambi and 3,353,150 1,386 127,072 66,915 14,280 9,908 3,572,711 4.72
Bengkulu
- South Sumatera 1,952,700 740 60,558 36,122 6,762 5,739 2,062,621 2.72
- Jambi 878,535 502 48,359 19,747 4,459 3,174 954,776 1.26
- Bengkulu 521,915 144 18,155 11,046 3,059 995 555,314 0.73
UIW Bangka Belitung 431,692 524 27,531 7,732 2,918 1,789 472,186 0.62
UID Lampung 2,101,933 923 55,548 52,771 4,406 2,120 2,217,701 2.93
UIW West Kalimantan 1,085,364 554 71,843 24,244 5,007 3,306 1,190,318 1.57
UIW S and C Kalimantan 1,706,897 868 118,867 51,943 10,615 4,682 1,893,872 2.50
- South Kalimantan 1,142,557 651 57,443 35,520 5,696 3,310 1,245,177 1.64
- Central Kalimantan 564,340 217 61,424 16,423 4,919 1,372 648,695 0.86
UIW East and North Kalimantan 1,089,710 484 65,362 21,397 6,053 2,807 1,185,813 1.57
UIW N, C Sulawesi and Gorontalo 1,551,341 835 57,736 51,075 10,771 2,523 1,674,281 2.21
- North Sulawesi 646,300 439 26,424 15,156 4,184 1,036 693,539 0.92
- Gorontalo 263,606 138 8,557 6,824 2,113 464 281,702 0.37
- Central Sulawesi 641,435 258 22,755 29,095 4,474 1,023 699,040 0.92
UIW S, SE and W Sulawesi 2,941,794 2,790 133,875 57,004 16,587 4,914 3,156,964 4.17
- South Sulawesi 2,126,861 2,245 96,567 38,346 9,592 3,811 2,277,422 3.01
- Southeast Sulawesi 556,736 400 26,234 12,215 5,179 895 601,659 0.79
- West Sulawesi 258,197 145 11,074 6,443 1,816 208 277,883 0.37
UIW Maluku and North Maluku 576,204 113 28,581 14,455 5,401 831 625,585 0.83
- Maluku 245,857 68 15,740 5,680 2,177 303 269,825 0.36
- North Maluku 330,347 45 12,841 8,775 3,224 528 355,760 0.47
UIW Papua and West Papua 591,737 116 52,301 15,805 6,853 1,539 668,351 0.88
- Papua 389,405 83 36,445 10,264 3,882 801 440,880 0.58
- West Papua 202,332 33 15,856 5,541 2,971 738 227,471 0.30
UID Bali 1,212,223 1,231 204,569 38,543 4,298 5,886 1,466,750 1.94
UIK West Nusa Tenggara 1,427,162 428 38,733 26,692 4,436 2,713 1,500,164 1.98
UIK East Nusa Tenggara 758,498 216 32,421 17,915 6,713 680 816,443 1.08
PT PLN Batam 279,676 357 43,412 3,534 414 1,121 328,514 0.43
Outside Java 27,005,914 19,421 1,619,770 639,357 135,207 71,667 29,491,336 38.96
UID East Java 10,918,842 45,766 648,376 324,921 21,969 53,508 12,013,382 15.87
UID Central Java and Yogyakarta 10,768,909 11,674 494,479 296,551 26,948 53,560 11,652,121 15.39
- Central Java 9,616,510 10,936 432,979 265,949 23,575 43,789 10,393,738 13.73
- D.I. Yogyakarta 1,152,399 738 61,500 30,602 3,373 9,771 1,258,383 1.66
UID West Java 13,628,105 15,439 589,240 297,856 17,708 80,966 14,629,314 19.32
UID Banten 3,077,930 6,698 179,135 60,712 3,865 7,415 3,335,755 4.41
UID Jakarta Raya 4,220,177 5,924 298,553 43,529 6,250 9,273 4,583,706 6.05
UIW Aceh 1,028.28 101.51 327.08 124.08 79.53 31.12 1,691.60 1.23
UIW North Sumatera 3,295.59 1,232.67 1,053.80 272.88 96.34 97.40 6,048.69 4.38
UIW West Sumatera 1,131.47 263.17 366.73 106.70 57.60 19.23 1,944.90 1.41
UIW Riau and Riau Archipelago 2,069.47 212.24 803.16 166.01 107.68 53.40 3,411.97 2.47
- Riau 1,755.78 189.59 639.78 139.52 78.54 46.89 2,850.10 2.06
- Riau Archipelago 313.69 22.66 163.38 26.50 29.13 6.51 561.87 0.41
UIW South Sumatera, Jambi and 3,339.21 545.86 854.97 212.59 133.21 52.56 5,138.41 3.72
Bengkulu
- South Sumatera 1,900.32 409.67 541.81 131.27 76.50 32.09 3,091.66 2.24
- Jambi 969.17 89.89 234.33 52.75 34.96 14.36 1,395.46 1.01
- Bengkulu 469.72 46.30 78.83 28.58 21.74 6.12 651.29 0.47
UIW Bangka Belitung 488.54 105.53 155.38 43.45 27.53 6.03 826.46 0.60
UID Lampung 1,929.82 493.15 368.56 122.66 47.74 21.14 2,983.07 2.16
UIW West Kalimantan 1,030.14 113.10 354.34 84.91 57.66 19.31 1,659.46 1.20
UIW S and C Kalimantan 1,508.29 198.75 494.93 136.04 99.15 29.81 2,466.98 1.79
- South Kalimantan 973.96 145.91 322.81 92.28 55.42 21.66 1,612.04 1.17
- Central Kalimantan 534.33 52.85 172.12 43.77 43.73 8.15 854.94 0.62
UIW East and North Kalimantan 1,316.95 117.77 560.51 124.39 121.60 19.68 2,260.90 1.64
UIW N, C Sulawesi and Gorontalo 1,338.62 169.37 440.93 125.94 97.93 28.27 2,201.06 1.59
- North Sulawesi 587.01 120.39 269.17 57.18 34.46 10.03 1,078.24 0.78
- Gorontalo 208.39 17.59 53.41 17.40 25.37 4.11 326.27 0.24
- Central Sulawesi 543.23 31.38 118.35 51.36 38.10 14.13 796.55 0.58
UIW S, SE and W Sulawesi 2,875.96 602.71 881.32 251.94 148.85 55.14 4,815.92 3.49
- South Sulawesi 2,056.91 539.74 709.59 199.38 100.60 44.95 3,651.18 2.64
- Southeast Sulawesi 569.91 46.82 133.82 35.61 31.74 7.64 825.53 0.60
- West Sulawesi 249.14 16.14 37.91 16.95 16.50 2.55 339.20 0.25
UIW Maluku and North Maluku 533.20 9.32 149.04 44.82 48.89 5.58 790.86 0.57
- Maluku 238.20 4.83 90.63 25.90 26.86 2.24 388.66 0.28
- North Maluku 295.00 4.49 58.41 18.92 22.03 3.35 402.20 0.29
UIW Papua and West Papua 720.49 12.54 280.10 70.05 94.56 7.88 1,185.62 0.86
- Papua 479.22 4.89 187.52 43.39 58.76 5.57 779.35 0.56
- West Papua 241.27 7.65 92.58 26.66 35.80 2.31 406.27 0.29
UID Bali 1,770.78 103.93 1,608.67 147.77 77.87 32.70 3,741.72 2.71
UIW West Nusa Tenggara 1,168.02 78.89 254.59 63.96 35.17 14.94 1,615.56 1.17
UIW East Nusa Tenggara 730.13 29.02 173.17 61.66 43.59 5.09 1,042.66 0.76
PT PLN Batam 563.84 345.92 494.90 45.13 23.79 9.95 1,483.54 1.07
Outside Java 26,838.81 4,735.45 9,622.18 2,204.98 1,398.69 509.24 45,309.36 32.81
UID East Java 9,249.88 6,424.56 3,485.72 949.82 311.54 228.16 20,649.67 14.96
UID Central Java and Yogyakarta 8,529.41 3,204.73 2,611.81 919.43 264.55 188.42 15,718.34 11.38
- Central Java 7,415.36 3,083.99 2,146.83 745.18 209.75 164.58 13,765.70 9.97
- D.I. Yogyakarta 1,114.05 120.74 464.99 174.25 54.80 23.84 1,952.65 1.41
UID West Java 12,261.52 8,517.04 4,087.66 828.03 339.65 128.00 26,161.90 18.95
UID Banten 3,125.24 5,627.77 1,928.03 219.00 118.75 43.32 11,062.12 8.01
UID Jakarta Raya 7,872.65 1,924.37 7,445.05 872.19 927.33 133.55 19,175.15 13.89
UIW Aceh 1,733.04 159.59 466.06 199.25 104.06 119.50 2,781.50 1.13
UIW North Sumatera 5,362.88 2,910.53 1,695.35 422.76 141.08 411.26 10,943.86 4.46
UIW West Sumatera 1,650.11 925.12 535.31 165.07 76.81 92.66 3,445.09 1.40
UIW Riau and Riau Archipelago 3,091.53 486.04 1,395.39 248.15 142.13 169.81 5,533.04 2.25
- Riau 2,635.80 447.31 1,098.76 213.52 103.04 148.36 4,646.79 1.89
- Riau Archipelago 455.73 38.73 296.62 34.63 39.09 21.45 886.25 0.36
UIW South Sumatera, Jambi and 4,829.39 1,195.37 1,445.64 309.42 183.18 178.54 8,141.54 3.32
Bengkulu
- South Sumatera 2,923.60 969.99 925.91 195.82 106.07 132.67 5,254.05 2.14
- Jambi 1,236.10 151.43 386.29 75.82 46.76 35.60 1,932.01 0.79
- Bengkulu 669.68 73.95 133.43 37.77 30.36 10.28 955.48 0.39
UIW Bangka Belitung 689.04 185.66 204.76 43.87 34.42 9.18 1,166.93 0.48
UID Lampung 2,745.52 974.28 587.24 184.92 71.23 122.90 4,686.09 1.91
UIW West Kalimantan 1,588.66 183.33 567.38 107.99 78.52 46.81 2,572.69 1.05
UIW S and C Kalimantan 2,508.13 448.58 825.75 175.77 138.61 81.07 4,177.91 1.70
- South Kalimantan 1,659.40 358.77 543.08 120.92 77.20 59.79 2,819.15 1.15
- Central Kalimantan 848.73 89.82 282.67 54.85 61.41 21.29 1,358.76 0.55
UIW East and North Kalimantan 2,213.45 312.89 1,020.30 182.28 170.19 53.77 3,952.88 1.61
UIW N, C Sulawesi and Gorontalo 1,967.25 387.26 692.59 162.22 136.54 125.38 3,471.24 1.41
- North Sulawesi 854.68 320.89 437.20 75.78 47.65 44.97 1,781.17 0.73
- Gorontalo 347.89 30.13 91.77 27.17 36.99 9.90 543.84 0.22
- Central Sulawesi 764.68 36.25 163.62 59.26 51.90 70.52 1,146.23 0.47
UIW S, SE and W Sulawesi 3,830.19 1,327.55 1,442.76 330.46 219.82 161.97 7,312.75 2.98
- South Sulawesi 2,929.80 1,262.87 1,181.91 275.62 159.37 136.19 5,945.77 2.42
- Southeast Sulawesi 644.18 47.08 200.26 38.18 39.02 18.17 986.90 0.40
- West Sulawesi 256.21 17.59 60.59 16.66 21.43 7.60 380.08 0.15
UIW Maluku and North Maluku 667.80 15.96 226.30 49.53 80.04 17.01 1,056.64 0.43
- Maluku 302.09 9.99 132.53 24.21 42.64 7.67 519.13 0.21
- North Maluku 365.72 5.97 93.77 25.32 37.40 9.34 537.51 0.22
UIW Papua and West Papua 908.42 16.36 428.62 82.11 114.13 18.01 1,567.65 0.64
- Papua 612.36 7.64 296.33 54.80 74.92 11.60 1,057.66 0.43
- West Papua 296.06 8.72 132.29 27.31 39.21 6.42 509.99 0.21
UID Bali 2,344.57 202.88 2,800.13 164.97 123.24 70.94 5,706.72 2.32
UIW West Nusa Tenggara 1,227.49 132.18 411.93 77.96 42.22 58.35 1,950.14 0.79
UIW East Nusa Tenggara 596.52 48.35 237.44 57.59 44.95 14.64 999.50 0.41
PT PLN Batam 816.09 737.07 783.26 67.83 41.20 14.60 2,460.05 1.00
Outside Java 38,770.09 10,649.00 15,766.21 3,032.13 1,942.36 1,766.44 71,926.22 29.30
UID East Java 13,914.66 15,695.49 5,232.89 1,352.96 414.55 618.39 37,228.93 15.16
UID Central Java and Yogyakarta 13,067.48 8,532.00 3,974.04 1,312.65 350.67 549.93 27,786.77 11.32
- Central Java 11,475.07 8,269.00 3,187.26 1,046.12 282.44 490.73 24,750.62 10.08
- D.I. Yogyakarta 1,592.42 263.00 786.78 266.53 68.23 59.20 3,036.15 1.24
UID West Java 18,753.88 24,051.64 6,080.21 1,181.34 456.40 360.51 50,883.98 20.73
UID Banten 5,231.82 14,601.21 3,163.81 339.19 163.90 84.37 23,584.30 9.61
UID Jakarta Raya 13,995.50 4,349.33 12,684.09 1,403.57 1,422.42 253.07 34,107.98 13.89
UIW Aceh 1,548,586.25 182,141.36 544,372.38 149,989.47 141,908.85 175,324.62 2,742,322.92 0.99
UIW North Sumatera 5,598,466.43 3,262,571.46 2,146,847.21 344,231.79 189,077.25 602,135.63 12,143,329.77 4.38
UIW West Sumatera 1,752,523.82 952,811.67 630,656.14 132,776.65 104,332.83 135,975.46 3,709,076.57 1.34
UIW Riau and Riau Archipelago 3,935,810.85 542,050.94 1,734,371.68 211,506.28 190,866.21 249,026.79 6,863,632.75 2.47
- Riau 3,315,506.31 498,505.05 1,358,508.09 182,268.81 138,351.93 217,502.72 5,710,642.91 2.06
- Riau Archipelago 620,304.54 43,545.89 375,863.59 29,237.47 52,514.28 31,524.06 1,152,989.84 0.42
UIW South Sumatera, Jambi and 5,482,432.73 1,327,589.90 1,873,959.83 250,426.29 246,745.77 263,006.92 9,444,161.42 3.40
Bengkulu
- South Sumatera 3,254,652.96 1,070,164.20 1,210,097.89 162,003.50 141,606.33 195,527.40 6,034,052.28 2.17
- Jambi 1,521,020.41 171,798.71 494,074.60 58,888.32 63,459.72 52,397.69 2,361,639.45 0.85
- Bengkulu 706,759.36 85,626.98 169,787.34 29,534.47 41,679.71 15,081.83 1,048,469.69 0.38
UIW Bangka Belitung 873,565.23 220,025.00 264,863.88 38,526.52 47,229.06 13,490.20 1,457,699.90 0.53
UID Lampung 2,796,636.00 1,099,358.23 763,677.92 137,608.03 96,059.22 164,309.30 5,057,648.69 1.82
UIW West Kalimantan 1,696,667.38 206,761.21 710,130.63 87,119.49 106,007.45 68,692.88 2,875,379.04 1.04
UIW S and C Kalimantan 2,669,647.61 514,872.64 1,085,034.36 134,825.82 189,659.16 118,940.40 4,712,980.00 1.70
- South Kalimantan 1,706,072.28 411,348.09 754,245.32 92,430.18 106,041.95 87,709.20 3,157,847.02 1.14
- Central Kalimantan 963,575.33 103,524.55 330,789.04 42,395.64 83,617.21 31,231.21 1,555,132.98 0.56
UIW East and North Kalimantan 2,822,684.43 364,748.11 1,323,876.82 152,269.80 219,763.90 78,898.67 4,962,241.74 1.79
UIW N, C Sulawesi and Gorontalo 1,951,011.24 439,397.32 888,093.00 125,906.13 183,104.36 181,328.70 3,768,840.74 1.36
- North Sulawesi 858,813.70 362,072.40 559,975.67 60,650.13 64,131.44 65,978.29 1,971,621.64 0.71
- Gorontalo 322,135.78 34,297.32 120,455.01 20,793.73 48,916.73 14,308.93 560,907.50 0.20
- Central Sulawesi 770,061.76 43,027.60 207,662.31 44,462.27 70,056.19 101,041.48 1,236,311.60 0.45
UIW S, SE, and W Sulawesi 4,236,898.04 1,420,688.65 1,839,101.31 275,667.90 294,863.35 232,595.40 8,299,814.66 2.99
- South Sulawesi 3,220,135.18 1,347,395.35 1,504,235.43 230,811.50 213,791.52 194,778.53 6,711,147.51 2.42
- Southeast Sulawesi 728,455.49 53,504.65 258,704.40 31,567.05 52,468.37 26,673.57 1,151,373.53 0.41
- West Sulawesi 288,307.38 19,788.64 76,161.48 13,289.35 28,603.46 11,143.31 437,293.61 0.16
UIW Maluku and North Maluku 747,146.18 18,186.11 291,060.50 37,627.41 110,959.27 24,960.68 1,229,940.15 0.44
- Maluku 342,960.05 11,246.21 171,023.61 19,635.23 58,951.73 11,249.44 615,066.28 0.22
- North Maluku 404,186.13 6,939.90 120,036.89 17,992.18 52,007.54 13,711.24 614,873.88 0.22
UIW Papua and West Papua 1,191,796.51 18,668.31 543,980.71 68,947.34 150,310.17 26,431.96 2,000,135.01 0.72
- Papua 810,126.19 8,492.12 372,353.49 46,383.26 98,388.32 17,019.30 1,352,762.68 0.49
- West Papua 381,670.33 10,176.19 171,627.22 22,564.09 51,921.84 9,412.66 647,372.33 0.23
UID Bali 3,104,170.43 226,005.91 3,567,635.22 140,272.00 168,806.45 104,128.52 7,311,018.54 2.63
UIW West Nusa Tenggara 1,114,761.04 152,732.24 548,322.36 59,857.52 57,602.75 85,098.94 2,018,374.84 0.73
UIW East Nusa Tenggara 683,862.81 54,034.53 305,976.43 48,690.10 60,177.31 21,487.68 1,174,228.85 0.42
PT PLN Batam 1,170,560.63 915,372.01 1,219,255.84 73,881.08 76,870.52 31,016.87 3,486,956.94 1.26
Outside Java 43,377,227.61 11,918,015.60 20,281,216.23 2,470,129.60 2,634,343.87 2,576,849.62 83,257,782.53 30.00
UID East Java 13,751,276.70 17,093,426.98 6,673,659.70 1,076,608.82 543,538.20 907,684.18 40,046,194.58 14.43
UID Central Java and Yogyakarta 11,917,188.04 9,435,636.55 5,067,776.73 1,075,971.24 465,156.86 806,949.67 28,768,679.10 10.37
- Central Java 10,212,212.72 9,143,715.68 4,078,756.20 847,039.84 375,642.95 720,081.70 25,377,449.09 9.14
- D.I. Yogyakarta 1,704,975.32 291,920.88 989,020.53 228,931.40 89,513.91 86,867.97 3,391,230.01 1.22
UID West Java 19,549,450.44 26,738,378.00 7,675,673.64 962,753.73 580,676.68 529,694.39 56,036,626.87 20.19
UID Banten 5,900,093.26 15,713,055.77 4,055,162.65 285,135.54 210,591.63 123,044.49 26,287,083.34 9.47
UID Jakarta Raya 19,513,914.61 4,797,601.82 15,442,756.32 1,293,528.70 1,701,606.95 371,285.59 43,120,693.99 15.54
UID East Java 1,274.37 342,950.80 8,070.76 4,163.96 18,869.67 11,556.91 3,098.95
UID Central Java and Yogyakarta 1,213.45 730,854.53 8,036.83 4,426.38 13,012.80 10,267.64 2,384.70
- Central Java 9,957.55 11,204,607.02 51,825.44 34,184.58 83,735.87 50,223.27 19,668.59
- D.I. Yogyakarta 176.58 25,395.50 1,917.84 1,061.85 3,160.45 1,404.68 311.29
UID West Java 1,376.12 1,557,849.70 10,318.73 3,966.13 25,773.49 4,452.61 3,478.22
UID Banten 1,699.79 2,179,935.07 17,661.61 5,586.83 42,405.80 11,378.31 7,070.15
UID Jakarta Raya 3,316.33 734,187.42 42,485.23 32,244.57 227,587.43 27,290.91 7,441.14
UID East Java 988.26 1,089.07 1,275.33 795.74 1,311.15 1,467.82 1,075.67
UID Central Java and Yogyakarta 911.97 1,105.91 1,275.22 819.69 1,326.48 1,467.37 1,035.34
- Central Java 889.95 1,105.78 1,279.71 809.70 1,329.99 1,467.37 1,025.33
- D.I. Yogyakarta 1,070.68 1,109.97 1,257.05 858.93 1,311.94 1,467.36 1,116.95
UID West Java 1,042.42 1,111.71 1,262.40 814.97 1,272.30 1,469.29 1,101.26
UID Banten 1,127.73 1,076.15 1,281.73 840.64 1,284.88 1,458.39 1,114.60
UID Jakarta Raya 1,394.30 1,103.07 1,217.49 921.60 1,196.28 1,467.13 1,264.24
UIW Aceh 70,652 91,963.15 68,823 86,083.18 656 3,161.70 1,173 2,718.28
UIW North Sumatera 226,905 377,586.50 178,649 259,593.40 3,414 8,610.60 44,842 109,382.50
UIW West Sumatera 91,858 131,407.05 76,609 99,127.20 1,854 4,694.20 13,395 27,585.65
UIW Riau and Riau Archipelago 380,734 704,144,234.00 234,216 453,165,122.00 139,362 230,889,412.00 7,156 20,089,700.00
- Riau 346,856 639,937,834.00 217,467 420,576,022.00 122,613 200,046,712.00 6,776 19,315,100.00
- Riau Archipelago 33,878 64,206,400.00 16,749 32,589,100.00 16,749 30,842,700.00 380 774,600.00
UIW South Sumatera, Jambi & Bengkulu 100,752 170,973.15 4,812 5,439.40 673 853.50 95,267 164,680.25
- South Sumatera 56,447 66,422.50 - - 247 317.35 56,200 66,105.15
- Jambi 29,280 87,608.35 1,924 2,197.20 385 479.25 26,971 84,931.90
- Bengkulu 15,025 16,942.30 2,888 3,242.20 41 56.90 12,096 13,643.20
UIW Bangka Belitung 16,392 22,475.85 19,009 24,790.25 4 4.40 -2,621 -2,318.80
UID Lampung 160,251 262,406.00 106,023 117,830.89 - 0.00 54,228 144,575.11
UIW West Kalimantan 69,412 206,383.12 56,276 76,737.30 2,220 3,703.60 10,916 125,942.22
UIW S and C Kalimantan 161,570 408,934.00 133,643 207,889.00 13,340 134,479.00 14,587 66,566.00
- South Kalimantan 108,403 254,772.00 86,093 142,653.00 9,803 49,752.00 12,507 62,367.00
- Central Kalimantan 53,167 154,162.00 47,550 65,236.00 3,537 84,727.00 2,080 4,199.00
UIW East and North Kalimantan 88,813 186,058,100.00 72,320 117,145,050.00 129 186,400.00 16,364 68,726,650.00
UIW N, C Sulawesi and Gorontalo 121,067 162,339.49 88,072 108,062.35 5,390 9,868.83 27,605 44,408.32
- North Sulawesi 30,309 50,470.10 22,073 31,469.65 3,985 5,362.33 4,251 13,638.11
- Gorontalo 13,507 18,040.50 12,743 16,449.80 1,189 4,309.85 -425 -2,719.15
- Central Sulawesi 77,251 93,828.90 53,256 60,142.90 216 196.65 23,779 33,489.35
UIW S, SE and W Sulawesi 235,850 1,140,705.00 181,663 241,091.00 1,735 2,392.00 52,452 897,221.68
- South Sulawesi 147,991 236,760.03 116,168 163,114.60 1,221 1,919.90 30,602 71,725.53
- South East Sulawesi 62,486 864,524.20 47,946 58,933.35 390 313.70 14,150 805,277.15
- West Sulawesi 25,373 39,420.30 17,549 19,043.30 124 158.00 7,700 20,219.00
UIW Maluku and North Maluku 49,011 72,111,750.00 43,672 56,162,050.00 8 111,650.00 5,331 15,838,050.00
- Maluku 18,193 36,282,800.00 15,863 25,108,050.00 4 3,950.00 2,326 11,170,800.00
- North Maluku 30,818 35,828,950.00 27,809 31,054,000.00 4 107,700.00 3,005 4,667,250.00
UIW Papua and West Papua 56,413 105,880.00 42,712 70,609.00 6,667 27,209.00 7,034 8,062.00
- Papua 36,498 66,535.00 26,818 41,669.00 4,318 17,645.00 5,362 7,221.00
- West Papua 19,915 39,346.00 15,894 28,940.00 2,349 9,564.00 1,672 842.00
UID Bali 185,985 208,763.00 178,246 192,118.00 3,765 6,855.00 3,974 9,790.00
UIW West Nusa Tenggara 103,786 133,848,346.00 102,747 131,602,696.00 1 2,200.00 1,038 2,243,450.00
UIW East Nusa Tenggara 86,842 250,484.20 71,817 162,974.30 1,802 4,590.60 13,223 82,919.30
PT PLN Batam - - - - - - - -
PT PLN Tarakan - - - - - - - -
Outside Java 2,206,293 1,099,702,730.04 1,659,309 759,727,263.52 181,020 231,396,084.03 365,964 108,579,382.51
UID East Java 668,245 357,568,750.30 518,258 260,869,324.37 26,559 13,316,293.55 123,428 83,383,132.38
UID Central Java and Yogyakarta 1,244,679 219,939,869.00 324,278 176,617,284.00 6,539 7,595,826.95 913,862 35,726,758.05
- Central Java 309,029 134,838,862.00 273,911 110,238,734.00 4,969 4,033,926.95 30,149 20,566,201.05
- D.I. Yogyakarta 935,650 85,101,007.00 50,367 66,378,550.00 1,570 3,561,900.00 883,713 15,160,557.00
UID West Java 711,023 2,468,051.20 577,499 821,193.80 11,173 77,137.20 122,351 1,569,720.20
UID Banten 162,274 522,828,850.00 116,699 278,459,050.00 8,142 114,755,000.00 37,433 129,614,800.00
UID Jakarta Raya 199,966 420,690.85 172,484 306,491.15 - - 27,482 114,199.70
UIW Aceh - - - - -
UIW North Sumatera - - - - -
UIW West Sumatera - - - - -
UIW Riau and Riau Archipelago 0.60 1 179.08 0.34 0.56
- Riau - - - - -
- Riau Archipelago 0.60 1 179.08 0.34 0.56
UIW South Sumatera, Jambi and Bengkulu - - - - -
- South Sumatera - - - - -
- Jambi - - - - -
- Bengkulu - - - - -
UIW Bangka Belitung 1.60 20 625.07 0.26 3.20
UID Lampung - - - - -
UIW West Kalimantan - - 1,502.83 - -
UIW S and C Kalimantan - - 3,570.17 - -
- South Kalimantan - - 1,849.92 - -
- Central Kalimantan - - 1,720.25 - -
UIW East and North Kalimantan - - 1,660.84 - -
UIW N, C Sulawesi and Gorontalo - - 2,043.32 - -
- North Sulawesi - - 1,139.66 - -
- Gorontalo - - 329.78 - -
- Central Sulawesi - - 573.88 - -
UIW S, SE and W Sulawesi - - 4,552.28 - -
- South Sulawesi - - 2,977.07 - -
- Southeast Sulawesi - - 987.17 - -
- West Sulawesi - - 588.03 - -
UIW Maluku and North Maluku - - 91.40 - -
- Maluku - - 91.40 - -
- North Maluku - - - - -
UIW Papua and West Papua 330.57 22 290.38 113.84 7.58
- Papua 330.57 22 239.64 137.94 9.18
- West Papua - - 50.74 - -
UID Bali - - - - -
UIW West Nusa Tenggara 14.09 5 1,093.09 1.29 0.46
UIW East Nusa Tenggara 3.48 12 1,164.76 0.30 1.03
PT PLN Batam - - 216.52 - -
PT PLN Tarakan - - - - -
UIK Northern Past of Sumatera - - - - -
UIK Southern Part of Sumatera - - - - -
UIP3B Sumatera 99.42 88 18,123.86 0.55 0.49
Outside Java 794.37 357 35,113.60 2.26 1.02
UID East Java - - - - -
UID Central Java and Yogyakarta - - - - -
- Central Java - - - - -
- D.I. Yogyakarta - - - - -
UID West Java - - - - -
UID Banten - - - - -
UID Jakarta Raya - - - - -
PT Indonesia Power - - - - -
PT PJB - - - - -
UIT Western Part of Java - - 3,447.56 - -
UIT Central Part of Java - - 12,241.09 - -
UIT Eastern Part of Java and Bali - - 8,156.79 - -
Java - - 23,845.44 - -
Indonesia 3,583.98 20,750.50 3,188.90 10,708.76 579.50 3,692.38 1,336.93 14.65 0.47 0.50 43,856.58 1,840.16 17,135.96 62,832.70
*) Including Projects in Commisioning Stage
Indonesia 3,474.81 17,767.38 2,718.59 9,145.53 550.34 2,138.08 1,118.96 6.33 0.08 - 36,920.09 1,519.44 20,066.66 58,506.19
*) Including IPP in commissioning phase that has produced kWh
4,038.20 2,007.63 489.72 - 550.25 - 0.29 193,543.32 84,518.74 879.81 85,398.55 278,941.87
Outside Java 255,099.30 328.54 324,048.66 - - 1,643,775.31 268,167.29 454,956.00 114.70 2,946,489.78 14,025,696.39 142,454.73
UIW Aceh - - - - - - -
UIW North Sumatera - - - - - - -
UIW West Sumatera - - - - - - -
UIW Riau and Riau Archipelago - - - - - - -
- Riau - - - - - - -
- Riau Archipelago - - - - - - -
UIW South Sumatera, Jambi and Bengkulu - - - - - - -
- South Sumatera - - - - - - -
- Jambi - - - - - - -
- Bengkulu - - - - - - -
UIW Bangka Belitung 342 347 689 64,384.50 119,206.50 183,591.00 45,841.00
UID Lampung - - - - - - -
UIW West Kalimantan - - - - - - -
UIW S and C Kalimantan - - - - - - -
- South Kalimantan - - - - - - -
- Central Kalimantan - - - - - - -
UIW East and North Kalimantan - - - - - - -
UIW N, C Sulawesi and Gorontalo - - - - - - -
- North Sulawesi - - - - - - -
- Gorontalo - - - - - - -
- Central Sulawesi - - - - - - -
UIW S, SE and W Sulawesi - - - - - - -
- South Sulawesi - - - - - - -
- Southeast Sulawesi - - - - - - -
- West Sulawesi - - - - - - -
UIW Maluku and North Maluku - - - - - - -
- Maluku - - - - - - -
- North Maluku - - - - - - -
UIW Papua and West Papua - 193 193 - 20,797.00 20,797.00 33,693.00
- Papua - 162 162 - 20,222.00 20,222.00 23,265.00
- West Papua - 31 31 - 575.00 575.00 10,428.00
UID Bali - - - - - - -
UIW West Nusa Tenggara - - - - - - -
UIW East Nusa Tenggara - - - - - - -
PT PLN Batam 1 13 14 18,000.00 124,067.00 142,067.00 57,715.90
PT PLN Tarakan - - - - - - -
UIK Northern Part of Sumatera - - - - - - -
UIK Southern Part of Sumatera - - - - - - -
UIP3B Sumatera - - - - - - -
UIKL Sulawesi - - - - - - -
UIKL Kalimantan - - - - - - -
Outside Java 343 553 896 82,384.50 264,070.50 346,455.00 137,249.90
UID East Java 254 981 1,235 439,869.78 780,679.22 1,220,548.99 534,809.60
UID Central Java and Yogyakarta - - - - - - -
- Central Java - - - - - - -
- D.I. Yogyakarta - - - - - - -
UID West Java 30 697 727 620,538.00 561,565.00 1,182,103.00 -
UID Banten 5 175 180 297,235.00 785,531.00 1,082,766.00 1,082,770.00
UID Jakarta Raya - 1,086 1,086 - 1,991,570.00 1,991,570.00 2,053,930.00
PT Indonesia Power - - - - - - -
PT PJB - - - - - - -
UIP2B - - - - - - -
Java 289 2,939 3,228 1,357,642.78 4,119,345.22 5,476,987.99 3,671,509.60
UIW Aceh - - - - - - - - - - - -
UIW North Sumatera - - - - - - - - - - - -
UIW West Sumatera - - - - - - - - - - - -
UIW Riau and Riau Archipelago - - - - 8 290.00 - - - - 8 290.00
- Riau - - - - - - - - - - - -
- Riau Archipelago - - - - 8 290.00 - - - - 8 290.00
UIW South Sumatera, Jambi and Bengkulu - - - - - - - - - - - -
- South Sumatera - - - - - - - - - - - -
- Jambi - - - - - - - - - - - -
- Bengkulu - - - - - - - - - - - -
UIW Bangka Belitung - - - - 10 510.00 5 150.00 - - 15 660.00
UID Lampung - - - - - - - - - - - -
UIW West Kalimantan - - 2 498.00 33 1,365.00 - - - - 35 1,863.00
UIW S and C Kalimantan - - - - 56 2,052.00 14 148.00 - - 70 2,200.00
- South Kalimantan - - - - 35 1,332.00 14 148.00 - - 49 1,480.00
- Central Kalimantan - - - - 21 720.00 - - - - 21 720.00
UIW East and North Kalimantan - - - - 51 2,090.00 - - - - 51 2,090.00
UIW N, C Sulawesi and Gorontalo - - - - 39 1,560.00 29 614.00 - - 68 2,174.00
- North Sulawesi - - - - 21 780.00 23 464.00 - - 44 1,244.00
- Gorontalo - - - - 7 320.00 - - - - 7 320.00
- Central Sulawesi - - - - 11 460.00 6 150.00 - - 17 610.00
UIW S, SE and W Sulawesi - - 1 90.00 92 2,999.80 18 295.00 2 30 113 3,414.80
- South Sulawesi - - 1 90.00 77 2,503.80 13 200.00 2 30 93 2,823.80
- Southeast Sulawesi - - - - 6 240.00 5 95.00 - - 11 335.00
- West Sulawesi - - - - 9 256.00 - - - - 9 256.00
UIW Maluku and North Maluku - - - - 9 480.00 4 80.00 - - 13 560.00
- Maluku - - - - 7 360.00 4 80.00 - - 11 440.00
- North Maluku - - - - 2 120.00 - - - - 2 120.00
UIW Papua and West Papua - - - - 6 300.00 14 196.03 - - 20 496.03
- Papua - - - - 4 240.00 14 196.03 - - 18 436.03
- West Papua - - - - 2 60.00 - - - - 2 60.00
UID Bali - - - - - - - - - - - -
UIW West Nusa Tenggara - - - - 24 1,030.00 7 180.00 - - 31 1,210.00
UIW East Nusa Tenggara - - - - 5 210.00 16 355.00 - - 21 565.00
PT PLN Batam - - - - 20 810.00 - - - - 20 810.00
PT PLN Tarakan - - - - - - - - - -
UIK Northern Part of Sumatera - - - - - - - - - - - -
UIK Southern Part of Sumatera - - - - - - - - - - - -
UIP3B Sumatera - - 34 9,160.17 319 15,089.00 26 730.00 - - 379 24,979.17
Outside Java - - 37 9,748.17 672 28,785.80 133 2,748.03 2 30 844 41,312.00
UID East Java - - - - - - - - - - - -
UID Central Java and Yogyakarta - - - - - - - - - - - -
- Central Java - - - - - - - - - - - -
- D.I. Yogyakarta - - - - - - - - - - - -
UID West Java - - - - - - - - - - - -
UID Banten - - - - - - - - - - - -
UID Jakarta Raya - - - - - - - - - - - -
PT Indonesia Power - - - - - - - - - - - -
PT PJB - - - - - - - - - - - -
UIT Western Part of Java 34 15,834.21 - - 348 20,786.00 8 220.00 - - 390 36,840.21
UIT Central Part of Java 25 12,500.00 - - 429 25,672.00 66 1,603.00 - - 520 39,775.00
UIT Eastern Part of Java and Bali 16 8,014.00 - - 299 17,139.00 54 1,328.00 - - 369 26,481.00
Java 75 36,348.21 - - 1,076 63,597.00 128 3,151.00 - - 1,279 103,096.21
Total Fixed Assets (Net) 1,213,251,658 Total Equity & Deferred Revenue 929,380,413
CURRENT ASSETS
- Cash & Bank 46,598,783
- Government Subsidy -
- Temporary Investment 334,153
- Receivable 25,130,538
- Inventories 12,934,233
- Other Current Assets 66,368,966
Total Current Assets 151,366,673 Total Long Term & Current Liabilities 655,674,600
OPERATION REVENUE
- Electricity Sales 276,061,925
- Connection Fees 6,934,597
- Others 2,644,067
OPERATION COST
- Electricity Purchase and Diesel Rented 87,181,367
- Fuel and Lubricant Oil 136,084,482
- Maintenance 22,328,178
- Personnel 25,908,771
- Depreciation 35,318,071
- Others 8,620,069
Rented 3,617,375.77
Rented 2,141.37
I. Financial Indicators
- Cash % 0.29
PLN Operational Unit/Province Integration Advance Optimazion System Specific Basic Total
(0-3) (4-6) (7-10) (11-14) (15-18) (19-26)
(GWh)
Business 19.10%
Residential 42.25%
46,901.25
103,733.43
Total 100%
245,518.17 Others 6.92%
17,004.83
Industrial 31.72%
77,878.65
(Million Rp)
Business 21.33%
59,196,245.28
Residential 41.08%
114,009,150.67
Total 100%
277,517,060.40 Others 6.71%
18,615,549.75
Industrial 30.88%
85,696,114.71
65,000
62,832.70
60,000
55,000
50,000
45,000
40.000
35,000
30,000
25,000
20,750.50
20,000
17,135.96
15,000
10,708.76
10,000
5,044.93
5,000
3,583.98
3,188.90
579.50 1,840.16
0
Geothermal Gas Turbine Diesel Hydro Combined Steam Rented IPP Total
Cycle
Diesel Gas
Sun
Wind
Purchased 30.62%
(GWh) 85,398.55 GWh
Hydro 5.10%
9,877.06
Rented 3.66%
Steam 63.46%
7,086.09
122,826.04
PLTG 1.41%
2,723.05
Diesel + Diesel Gas + Geothermal 2.12%
Own Production + Rented
Sun + 4,110.30 69.38%
Wind 4.73%
Combined Cycle 19.51% 193,543.32 GWh
9,162.93
37,757.83
Year Residential Industrial Business Social Gov. Office Publ. Street Total ∆%
Building Lighting
Year Residential Industrial Business Social Gov. Office Publ. Street Total ∆%
Building Lighting
Year Residential Industrial Business Social Gov. Office Publ. Street Total ∆%
Building Lighting
Year Residential Industrial Business Social Gov. Office Publ. Street Total
Building Lighting
Year Residential Industrial Business Social Gov. Office Publ. Street Total ∆%
Building Lighting
Year Residential Industrial Business Social Gov. Office Publ. Street Total
Building Lighting
Year Hydro Steam Gas Com- Geo- Diesel Diesel Sun Wind Biomass Total ∆%
Turbine bined thermal Gas
Cycle
Year Hydro Steam Gas Combined Geo- Diesel Diesel Sun Wind Total ∆%
Turbine Cycle thermal Gas
2011 3,511.20 12,052.50 2,839.44 7,833.97 435.00 2,568.54 25.94 1.23 0.34 29,268.16 8.82
2012 3,515.51 14,445.50 2,973.18 8,814.11 548.00 2,598.64 - 6.20 0.34 32,901.48 12.41
2013 3,519.49 15,554.00 2,893.88 8,814.11 568.00 2,847.78 - 7.94 0.43 34,205.63 3.96
2014**) 3,526.90 18,421.67 3,012.10 8,886.11 573.00 2,798.55 - 8.73 0.49 37,227.55 8.83
2015**) 3,566.15 21,117.15 2,981.31 8,894.11 550.89 3,175.79 - 8.86 0.99 40,295.25 11.89
2016 3,567.83 19,856.35 3,208.15 9,204.11 580.89 3,353.80 - 12.94 0.99 39,785.06 3.97
2017***) 3,583.15 19,530.50 3,075.83 9,022.54 550.89 3,880.02 - 7.98 0.88 39,651.79 -0.33
2018 3,582.98 20,192.00 3,133.61 9,812.11 579.50 4,383.42 - 12.07 0.47 41,696.17 5.16
2019 3,583.98 20,750.50 3,188.90 10,708.76 579.50 5,029.31 - 14.65 0.47 43,856.08 5.18
Year Hydro Steam Gas Combined Geo- Diesel Diesel Sun Wind Total ∆%
Turbine Cycle thermal Gas
2011 3,430.11 10,844.21 2,357.43 6,817.82 434.00 1,555.20 10.00 1.15 - 25,449.92 8.11
2012 3,435.98 12,910.75 2,342.40 7,288.33 506.50 1,597.24 - 4.66 - 28,085.86 10.36
2013 3,220.90 13,563.65 2,543.84 7,300.91 546.50 1,827.73 - 7.24 - 29,010.77 3.29
2014**) 3,444.07 16,032.57 2,533.82 7,722.33 549.00 1,685.64 - 7.48 0.02 31,974.93 8.76
2015**) 3,473.18 17,798.74 2,486.42 7,571.23 516.43 1,902.77 - 6.54 0.02 33,755.32 6.99
2016 3,410.62 17,811.40 2,669.80 7,754.23 523.28 2,292.49 - 9.28 0.30 34,471.39 5.33
2017 3,470.89 17,150.20 2,608.89 7,698.57 508.89 2,488.73 - 5.66 - 33,931.83 -1.57
2018 3,471.05 17,138.73 2,605.46 8,937.52 541.54 2,750.86 - 7.20 0.08 35,452.44 4.48
2019 3,474.81 17,767.38 2,718.59 9,145.52 550.34 3,257.04 - 6.33 0.08 36,920.09 4.14
2011 10,315.55 62,335.23 8,246.22 40,409.68 3,487.39 4,010.94 47.67 0.72 - 13,885.67 142,739.07 40,681.87 183,420.94 8.03
2012 10,524.61 73,823.06 5,668.01 34,568.51 3,557.54 3,484.45 55.12 2.85 - 18,070.82 149,754.97 50,562.62 200,317.59 9.21
2013 13,009.55 80,926.10 5,916.51 36,423.42 4,345.09 3,212.13 381.75 5.48 - 19,745.72 163,965.75 52,222.79 216,188.54 7.92
2014 11,163.62 89,249.38 5,445.68 38,068.45 4,285.37 3,546.86 1,087.26 - 6.81 22,443.56 175,296.98 53,257.93 228,554.91 5.72
2015 10,004.48 95,815.29 3,442.93 38,705.56 4,391.55 3,032.75 - - 5.28 19,841.57 176,472.21 57,509.77 233,981.99 2.37
2016 13,885.59 97,153.33 3,871.76 41,908.11 3,958.10 3,062.34 2,612.37 5.85 - 17,351.52 183,808.97 64,801.55 248,610.52 6.25
2017 12,425.17 105,651.39 1,891.92 38,074.10 4,095.99 5,833.76 - 5.53 - 13,447.20 181,425.07 73,234.72 254,659.78 2.43
2018 10,728.68 113,902.01 3,210.32 38,762.01 4,012.81 7,573.83 - 4.21 - 10,504.60 188,698.46 78,386.92 267,085.38 4.88
2019 9,877.06 122,826.04 2,723.05 37,757.83 4,110.30 5,014.43 4,143.79 - 4.71 7,086.09 193,543.32 85,398.55 278,941.07 4.11
*) Project Included
*) Unit Price of Oil (HSD, IDO and MFO) including the transportation cost and biodiesel cost
*) Revised data
6 - 7 kV 10 - 12 kV 15 - 20 kV
FIXED ASSET
- Total Fixed Asset 1,276,632,534.16 1,162,049,951.04 1,129,128,795.00 1,086,392,644.58 1,133,420,742
CURRENT ASSETS
- Cash & Bank 46,598,783.00 33,294,560.00 42,291,959.00 41,909,223.00 23,596,339.00
- Government Subsidy - - 7,588,977.00 12,446,110.00 17,501,009.00
- Temporary Investment 334,153.00 1,216,886.00 286,697.00 374,771.00 120,059.00
- Receivable 25,130,538.00 23,802,663.00 24,139,080.00 24,122,345.00 20,315,908.00
- Inventories 12,934,233.00 15,506,567.00 12,828,118.00 11,569,596.00 11,415,863.00
- Other Current Assets 66,368,966.00 40,099,717.00 6,662,420.00 8,147,032.00 6,395,615.00
DEFERRED REVENUE - - - - -
Note :
*) Financial Report 2013, 2014 and 2015, used ISAK 8
**) Restate of financial report 2016
OPERATION REVENUE
- Electricity Sales 276,061,925 263,477,551 246,586,856 214,139,834 209,844,541
- Connection Fees 6,934,597 7,309,172 7,113,454 7,052,136 6,141,335
- Government Subsidiary 51,711,774 48,101,754 45,738,215 58,043,265 56,552,532
- Others 2,644,067 2,111,019 1,594,933 1,629,986 1,361,114
OPERATION COST
- Electricity Purchase 87,181,367 88,539,693 79,018,802 66,274,504 12,486,381
- Fuel & Lubricant Oil 136,084,482 137,375,014 116,947,824 109,492,383 138,408,315
- Maintenance 22,328,178 20,737,601 19,515,606 21,226,736 21,861,310
- Personnel 25,908,771 23,323,003 23,124,511 22,659,965 20,321,137
- Depreciation 35,318,071 30,744,712 29,160,597 27,512,150 25,406,856
- Others 8,620,069 7,950,118 7,706,754 7,284,064 7,090,077
Table 66 : Sales, Accounts Receivable and Average Collection Rate 2015 - 2019
I. Financial Indicator
- Cash Ratio % 0.29 0.21 0.30 0.34 0.20
- Rentability Ratio % 0.47 1.03 0.51 1.20 1.84
- Solvability Ratio % 41.37 37.91 34.87 30.95 30.89
- Liquidity Ratio % 95.02 72.29 67.44 81.05 67.81
*) 2015 - 2018 Financial Covenant calculation are based on the financial reports, which exclude the impact of ISFAS 8
as stated in the Indenture Global Bonds, Local Bond Trustee Agreement and its amendments, and Consent Solicita-
tion Indenture Global Bonds.
**) Adjusted EBITDA includes compensation from Government for reimbursement of Electricity Production Cost (“BPP”)
of several categories of customers whose tariffs for selling electricity are lower than 2017 BPP, which have not been
calculated in 2017 electricity subsidy in amount of IDR 7,456 trillion.
250,000
246,586.86
240,000
230,000
220,000
214,139.82
210,000
209,844.54
200,000
190,000
180,000
170,000
160,000
150,000
140,000
130,000
120,000
110,000
100,000
90,000
80,000
70,000
60,000
50,000
40,000
30,000
20,000
10,000
10.17
9.54 9.40 9.97 9.77 9.48 8.75 9.51*) 9.60
45,000 43,856
41,696
42,000
40,295 39,786 39,652
39,000 37,228
36,000
34,206
33,000
32,901
30,000 29,268
27,000
24,000
21,000
18,000
15,000
12,000
9,000
6,000
3,000
278,941.07
270,000
267,085.38
255,000
254,659.78
248,610.52
240,000
225,000
210,000
195,000
180,000
165,000
150,000
135,000
120,000
105,000
90,000
75,000
60,000
45,000
30,000
15,000
Purchased
Rented
Geothermal
Gas Turbine
Combined Cycle
Diesel + Diesel Gas + Solar + Wind
Hydro
Steam
Total
Table 71 : Average Growth Rate of Number of Customer per Year (%) 2019
Type of Customer FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI *) 2000-2019
Type of Customer End of End of End of End of End of Fifth Year of Year
FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI 2019
Type of Customer FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI *) 2000-2019
Table 75 : Average Growth Rate of Energy Sold per Year (%) 2019
Type of Customer FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI *) 2000-2019
Function First Year End of End of End of End of Fifth Year of Year
FYDP II FYDP II FYDP III FYDP IV FYDP V FYDP VI 2019
(1974/75) (1978/79) (1983/84) (1988/89) (1993/94) (1998)
Type of Generating End of End of End of End of End of Fifth Year of Year
FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI 2019
(1973/74) (1978/79) (1983/84) (1988/89) (1993/94) (1998)
- Hydro 278.77 349.67 536.44 1,969.57 2,178.75 3,006.76 3,583.98
- Steam 225.00 556.25 1,556.25 3,416.95 4,690.60 6,770.60 20,750.50
- Gas Turbine 42.00 882.07 1,027.92 1,233.68 995.92 1,347.41 3,188.90
- Combined Cycle - - - - 3,411.31 6,560.97 10,708.76
- Geothermal - - 30.00 140.00 195.00 360.00 579.50
- Diesel Gas*) - - - - - - -
- Wind**) - - - - - - 0.47
- Sun - - - - - - 14.65
Tabel 78 : Laju Pertumbuhan Rata-rata Kapasitas Terpasang per Tahun (%) 2019
Type of Generating FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI *) 2000 - 2019
Type of Generating End of End of End of End of End of Fifth Year of Year
FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI 2019
(1973/74) (1978/79) (1983/84) (1988/89) (1993/94) (1998)
Own Production :
- Wind - - - - - - -
- Sun - - - - - - 4.71
Table 80 : Average Growth Rate of Energy Production per Year (%) 2019
Production FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI *) 2000 - 2019
Own Production :
- Wind***) - - - - - - -
- Sun ***) - - - - - - -
- Rented - - - - - - 12.38
Energy Losses
Distribution
Transmission
45,000 43,856.08
42,000
39,000
36,000
33,000
30,000
27,000
24,000
21,000
20,580.76
18,000
15,000
13,600.05
12,000
9,000 8,529.22
6,000
3,934.99
3,000
2,288.38
776.08
0
End of End of End of End of End of Fifth year of Year 2019
FYDP I FYDP II FYDP III FYDP IV FYDP V FYDP VI
66,000
62,833
61,000
57,822
55,926
56,000
17,136
51,000
13,270 13,635
46,000
1,840
2,491
41,000
3,004
36,000
31,000
26,000
39,652 41,696 43,857
21,000
16,000
11,000
6,000
1,000
2017 2018 2019
PLN
Rented
Purchase
280,000
260,000
240,000
220,000
200,000
180,000
160,000
140,000
120,000
100,000
80,000
60,000
40,000
20,000
Purchased
Rented
Diesel + Diesel Gas + Sun + Wind
Geothermal
Combined Cycle
Gas Turbine
Steam
Hydro
(%)
61.69
60
59.9
58.1
55.8
55
54.5
50
45
40
35
30
26.09
25.3 26.3
25
23.3
22.3
20
15
8.2
10
7.8
6.5 7.3
7.3 6.0 5.3 6.3 6.0 5.08 5.02
5.0
5 4.3 4.3
2.11
Geothermal
Hydro
Natural Gas
Coal
Oil
Sun Wind and Others
86.20
70
50
30
10
Graph 15. Basic Cost of Electricity Production and Average Selling Price
(Rp/kWh)
1,600
1,406 1,385
1,400
1,123
1,300 1,265 1,318 1,130
1,200
1,035
1,000
991 1,105
800
600
400
UIW
ACEH
UIW UIW
UIW
UIW UIW
UIW
UIW
UIW
UID
UID
UID
BANTEN
UID
WEST JAVA UID
UID
UID
UIW
UIW UIW
UIW
UIW
PT PLN (Persero) UIW Aceh PT PLN (Persero) UIW East Nusa Tenggara
Jl. Tgk. H. M. Daud Beureu-eh No. 172, Jl. Piet A. Tallo 101,
Banda Aceh, 23243 Kupang 85228
PT PLN (Persero) UIW North Sumatra PT PLN (Persero) UIW West Papua dan Papua
Jl. K.L. Yos Soedarso No. 284, Medan 20115, Jl. Jend. A. Yani No. 18,
Kotak Pos 2000 Jayapura 99111 Kotak Pos 1045
PT PLN (Persero) UIW West Sumatra PT PLN (Persero) UID Jakarta Raya
Jl. Dr. Wahidin No. 8, Padang 25121 Jl. M.I. Ridwan Rais No. 1,
Jakarta 10110
PT PLN (Persero) UIW Riau and Riau Archipelago
Jl. Musyawarah, Nangka Ujung PT PLN (Persero) UID West Java
Kel. Labuh Baru Barat, Kec. Payung Sekaki, Jl. Asia Afrika No. 63,
Pekanbaru, Riau 28233 Bandung 40111
PT PLN (Persero) UIW South Sumatra, PT PLN (Persero) UID Central Java and
Jambi and Bengkulu D.I. Yogyakarta
Jl. Kapten A. Rivai No. 37, Jl. Teuku Umar No. 47,
Palembang 30129 Semarang 50234
PT PLN (Persero) UIW West Kalimantan PT PLN (Persero) UID East Java
Jl. Adi Sucipto Km. 7,3 Sei Raya, Jl. Embong Trengguli No. 19 – 21,
Pontianak 78391 Surabaya 60271
PT PLN (Persero) UIW Maluku and PT PLN (Persero) Research and Development Center
North Maluku Jl. Duren Tiga No.102,
Jl. Diponegoro No. 2, Jakarta 12760
Ambon 97127
PT PLN (Persero) Certification Center
PT PLN (Persero) UIW West Nusa Tenggara Jl. Laboratorium, Duren Tiga,
Jl. Langko No. 25 – 27, Jakarta 12760
Ampenan 83114, Mataram
PT PLN (Persero) Construction Management Center
Jl. Slamet No. 1, Gajah Mungkur,
Semarang 50232
PT PLN (Persero) UIKL Sulawesi PT PLN (Persero) UIP Central Part of Kalimantan
Jl. Letjen Hertasning Blok B Jl. Mistar Cokrokusumo Km.39
Panakukkang, Makassar 90222 Banjarbaru, Kalimantan Selatan 70733
PT PLN (Persero) UIP Sumatera PT PLN (Persero) UIP Northern Part of Sulawesi
Jl. R.A. Kartini No.23 Jl. Bathesda No. 32
Medan 20152 Kel. Ranotana, Kec. Sario
Kota Manado 95116
PT PLN (Persero) UIP Northern Part of Sumatera
Jl. Dr. Cipto No. 12 PT PLN (Persero) UIP Southern Part of Sulawesi
Medan 20152 Jl. Letjend Hertasning, Panakukang
Makassar 90222
PT PLN (Persero) UIP Southern Part of Sumatera
Jl. Residen Abdul Rozak No. 2180
Sekojo, Palembang 30118