Method Statement For Installation of Condensate Ceiling Clean-Out
Method Statement For Installation of Condensate Ceiling Clean-Out
Method Statement For Installation of Condensate Ceiling Clean-Out
TABLE OF CONTENTS
1 Purpose ......................................................................................................................
2 References ................................................................................................................
6 Safety .........................................................................................................................
1 of 4
HVAC Air Leak Test
ABDEL th
710 Suite, 7 Floor Trinity Plaza Tower
CONSTRUCTION Gorordo Avenue, Cebu City, Philippines
CORPORATION Tel : (032) 233-5515/ 233-5577
1 PURPOSE
2 REFERENCES
Contract Specification
Approve materials specification
Approved As-Built Plan
1. Halogen Lamp/ Fog Light 500 6. Sanitary UPVC Fittings (Wye &
Watts Clean-Out)
2. Scaffolding/Ladder 7. Aero Tape
3. Sealant/PVC Cement 8. Polyethylene Tape
4. Rubber Insulations 9. Rubber Cement
5. Sanitary UPVC Pipe S600 10. Pipe Cutter
2 of 4
HVAC Air Leak Test
ABDEL th
710 Suite, 7 Floor Trinity Plaza Tower
CONSTRUCTION Gorordo Avenue, Cebu City, Philippines
CORPORATION Tel : (032) 233-5515/ 233-5577
5 Sequence of Work
Ensure that all fan coil units (FCU) that connected to the condensate
drain line are not functioning or not in operation. This will prevent the
flooding during the installation of the ceiling clean-out.
6. Safety
2. The safety officer in charge to ensure that all workers are equipped with
their P.P.E throughout the construction work.
3 of 4
HVAC Air Leak Test
ABDEL th
710 Suite, 7 Floor Trinity Plaza Tower
CONSTRUCTION Gorordo Avenue, Cebu City, Philippines
CORPORATION Tel : (032) 233-5515/ 233-5577
Prepared by:
***************************************************************************************
4 of 4
HVAC Air Leak Test