Final Structural DWG of Public Toilet
Final Structural DWG of Public Toilet
Final Structural DWG of Public Toilet
CORNER
2545 2545
BARS
GENERAL NOTES:
350
B
700
1. USE M20 GRADE CONCRETE FOR BEAM AND SLAB .
ALL OTHER RCC AND PCC WORKS SHALL BE AS PER SPECIFIED IN THE DRAWINGS.
2. USE Fe500 GRADE STEEL
350
3. CLEAR COVER TO BARS FOOTING LINE FOOTING LINE
350
a. FOR BEAMS (FROM FACE TO LATERAL STIRRUPS) = 25mm
b. FOR OUTER BARS IN SLAB = 15mm
3470
350mm BRICK
c. FOR BANDS = 25mm WALL IN 1:4
4. BRICK SHALL HAVE ATLEAST 8MPA COMPRESSIVE STRENGTH C/S RATIO
700 700
5. MORTAR SHALL BE OF 1:4 RATIO (CEMENT/SAND RATION) AND THICKNESS SHALL NOT EXCEED 12mm DETAIL 2 DETAIL AT 1
AND VERTICAL JOINT SHALL BE PROPERLY CHECKED DURING THE MASONRY WORK
6. BACKFILL SHALL BE IN LAYERS OF 150mm THK. WITH PROPER MECHANICAL
COMPACTION AND WATERING AFTER EACH LAYER
350
700
700
A
7. SOLING SHAL BE OF GRADE B BRICK AND VOIDS ARE TO BE FILLED WITH EITHER
GRANULAR MATERIAL OR SAND FILL
8. AFTER CONCRETING RCC OR PCC, IT SHALL BE PROTECTED FROM RAIN FOR AT LEAST VERTICAL BAND FOOTING LAYOUT PLAN
10 HRS [ 1: 50 ] A
9. CURING SHALL BE DONE FOR AT LEAST 10DAYS FOR RCC AND PCC PART WHILE 7 DAYS FOR MASONRY TYP.
AND PLASTER WORK
12.AGGREGATE SIZE SHALL BE 12mm (DOWN) WELL GRADED CRUSHED FOR 50 TO 100 mm THK. 2 NOS. 10Ø
THAT CONTINUES TO THE TOP
CONCRETE WORK AND 20mm DOWN (WELL GRADED CRUSHED)FOR 100mm TO 300mm THK. CONCRETE WORK
16Ø
25 230
13.REBAR SHALL BE RUST FREE; IF RUST IS OBSERVED DURING CASTING SHALL BE REMOVED WITH CHEMICALS VERTICAL BARS
10Ø
75
14.CURING IS RECOMMENDED FOR 4 TIMES A DAY WITH PROPER MEANS.
M20 MICRO-CONCRETE
15.TOOTHING SHALL BE IN STEPS 8Ø@200 mm
10Ø
C.C LINKS VERTICAL BAR DETAILS
350
DETAIL AT 2 DETAIL 1
CLIENT: SILT CONSULTANTS (P) LTD. TEAM LEADER : ER. BUDDHI SAGAR THAPA SCALE : AS SHOWN STAGE: JOB TITLE: SHEET TITLE: SHEET NO.
JV DATE : MARCH ,2023 FINAL DRAWINGS PUBLIC TOILET DRAWINGS. TRENCH LAYOUT
ARCHITECT : AR. RAJESH KUMAR DAS
MEDICAL COLLEGE INFRASTRUCTURE CONSTRUCTION DEVELOPMENT COMMITTEE (MCICDC), GETA, MOONLIGHT CIVIL SOLUTION (P) LTD. ST
KAILALI, NEPAL EVERSAFE ENGINEERING CONSULTANCY (P) LTD. ENGINEER : ER. GOVIND RAJ BHATTA APPROVED BY :
1
KATHMANDU, NEPAL CAD BY : ER. SALIN SHRESTHA CHECKED BY :
BAND 3
PLINTH BEAM
8Ø@150 mm C.C BOTHWAYS 8Ø@150 mm C.C BOTHWAYS
[THESE BARS SHALL BE CUT OFF AT THE [THESE BARS SHALL BE CUT OFF AT THE
175 POINT OF SANITARY FIXTURES] PLINTH BEAM 175 POINT OF SANITARY FIXTURES]
BAND 2
SEE ARCHITECTURAL
150
SEE ARCHITECTURAL
150
DRAWING
DRAWING
ORIGINAL GROUND LEVEL
ORIGINAL GROUND LEVEL
BAND 1
350
350
125 125
900
125 125
900
250
50 50
50
250
750
50 8Ø@150 mm C.C
50 100
50 100
75
75
700
700
RAMMED EARTH ONE LAYER FLAT BRICK SOLING
RAMMED EARTH ONE LAYER FLAT BRICK SOLING
100
SCALE: 1:20 DETAIL A [TYP.]
SCALE: 1:20
TYPICAL FOOTING DETAIL FOR HALF BRICK WALL
SCALE: 1:20
CLIENT: SILT CONSULTANTS (P) LTD. TEAM LEADER : ER. BUDDHI SAGAR THAPA SCALE : AS SHOWN STAGE: JOB TITLE: SHEET TITLE: SHEET NO.
JV DATE : MARCH ,2023 FINAL DRAWINGS PUBLIC TOILET DRAWINGS. FOOTING DETAILS
ARCHITECT : AR. RAJESH KUMAR DAS
MEDICAL COLLEGE INFRASTRUCTURE CONSTRUCTION DEVELOPMENT COMMITTEE (MCICDC), GETA, MOONLIGHT CIVIL SOLUTION (P) LTD. ST
KAILALI, NEPAL EVERSAFE ENGINEERING CONSULTANCY (P) LTD. ENGINEER : ER. GOVIND RAJ BHATTA APPROVED BY :
2
KATHMANDU, NEPAL CAD BY : ER. SALIN SHRESTHA CHECKED BY :
1 2 3
2545 2545
1 2 3
THIS CORNER BAR
TERMINATES AT SLAB LEVEL 2545 2545
B
B 3 NOS. 12Ø
8Ø@200mm
C.C LINKS
300
3470
PB 230X300
PB 230X300
3470
PB 230X300
THIS CORNER BAR BRICK MASONRY
TERMINATES AT SLAB LEVEL IN 1:4 C/S
3 NOS. 12Ø
BRICK MASONRY PLINTH BEAM DETAILS
IN 1:4 C/S
SCALE: 1:10
SEE DETAIL 1
PB 230X300 PB 230X300
A
A
1 2 3
2545 2545
B
8Ø@150C.C
MB 230X300 MB 230X300
125 mm
3470
MB 230X300
MB 230X300
8Ø@150C.C
MB 230X300
3470
125 mm
MB 230X300 MB 230X300 A
CLIENT: SILT CONSULTANTS (P) LTD. TEAM LEADER : ER. BUDDHI SAGAR THAPA SCALE : AS SHOWN STAGE: JOB TITLE: SHEET TITLE: SHEET NO.
JV DATE : MARCH ,2023 FINAL DRAWINGS PUBLIC TOILET DRAWINGS. WALL DETAIL
ARCHITECT : AR. RAJESH KUMAR DAS
MEDICAL COLLEGE INFRASTRUCTURE CONSTRUCTION DEVELOPMENT COMMITTEE (MCICDC), GETA, MOONLIGHT CIVIL SOLUTION (P) LTD. ST
KAILALI, NEPAL EVERSAFE ENGINEERING CONSULTANCY (P) LTD. ENGINEER : ER. GOVIND RAJ BHATTA APPROVED BY :
3
KATHMANDU, NEPAL CAD BY : ER. SALIN SHRESTHA CHECKED BY :
1 2 3
2545 2545
3-12Ø TH. 3-12Ø TH.
1 1
B 1 1
3-12Ø TH. 3-12Ø TH.
600 600 600 600
8Ø@150C.C
600
600
8Ø@150C.C
2L-8Ø@100c.c 2L-8Ø@150c.c 2L-8Ø@100c.c 2L-8Ø@100c.c 2L-8Ø@150c.c 2L-8Ø@100c.c
125 mm
3-12Ø TH.
L-SECTION
1 OF BEAM ALONG AA AND BB
500
3470
1
3-12Ø TH.
600 600
125 mm
2L-8Ø@100c.c 2L-8Ø@100c.c 2L-8Ø@100c.c
600
600
8Ø@150C.C
L-SECTION OF BEAM ALONG 11, 22 ,AND 33
A
3 NOS. 12Ø
STRUCTURAL SLAB LEVEL
230
TOP REINFORCEMENT DETAIL FOR SLAB
[ 1: 50 ]
125
300
2 NOS. 10Ø 3 NOS. 10Ø
230 305
3 NOS. 12Ø
BEAM SECTION AT 1
75
75
SCALE: 1:10
8Ø@200 mm 8Ø@200 mm
C.C LINKS C.C LINKS
VERTICAL BAND DETAIL SILL BAND DETAIL
DETAIL 3 9" WALL
115
230
M20 MICRO-CONCRETE
8Ø@200 mm
75
75
10Ø
C.C LINKS VERTICAL BAR DETAILS
350
8Ø@200 mm 8Ø@200 mm DETAIL 1
C.C LINKS C.C S LINKS DETAIL AT 2
LINTEL BAND DETAIL SILL BAND DETAIL SCALE: 1:10 SCALE: 1:10
DETAIL 3 4" WALL
SCALE: 1:10
SCALE: 1:10
CLIENT: SILT CONSULTANTS (P) LTD. TEAM LEADER : ER. BUDDHI SAGAR THAPA SCALE : AS SHOWN STAGE: JOB TITLE: SHEET TITLE: SHEET NO.
JV DATE : MARCH ,2023 FINAL DRAWINGS PUBLIC TOILET DRAWINGS. BEAM DETAIL
ARCHITECT : AR. RAJESH KUMAR DAS
MEDICAL COLLEGE INFRASTRUCTURE CONSTRUCTION DEVELOPMENT COMMITTEE (MCICDC), GETA, MOONLIGHT CIVIL SOLUTION (P) LTD. ST
KAILALI, NEPAL EVERSAFE ENGINEERING CONSULTANCY (P) LTD. ENGINEER : ER. GOVIND RAJ BHATTA APPROVED BY :
4
KATHMANDU, NEPAL CAD BY : ER. SALIN SHRESTHA CHECKED BY :
FOLLOW LINTEL BAND DETAILS
SILL BAND
SILL BAND
BAND DETAILS
CLIENT: SILT CONSULTANTS (P) LTD. TEAM LEADER : ER. BUDDHI SAGAR THAPA SCALE : AS SHOWN STAGE: JOB TITLE: SHEET TITLE: SHEET NO.
JV DATE : MARCH ,2023 FINAL DRAWINGS PUBLIC TOILET DRAWINGS. SLAB REINFORCEMENT DETAILS
ARCHITECT : AR. RAJESH KUMAR DAS
MEDICAL COLLEGE INFRASTRUCTURE CONSTRUCTION DEVELOPMENT COMMITTEE (MCICDC), GETA, MOONLIGHT CIVIL SOLUTION (P) LTD. ST
KAILALI, NEPAL EVERSAFE ENGINEERING CONSULTANCY (P) LTD. ENGINEER : ER. GOVIND RAJ BHATTA APPROVED BY :
5
KATHMANDU, NEPAL CAD BY : ER. SALIN SHRESTHA CHECKED BY :