Lecture No : 25

‫عباس راضي عباس‬

Chief engineer
Abbas Radhi Abbas 1
MOC 28 -2-2024
Agenda

1- introduction to analysis well problems

2- Objective of water solutions

3. Reasons for water

4. How Diagnostics water problem

5.Water shut-off (WSO) techniques

6. Case study

2
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
If you need analysis well problem must study all below details

Drilling history
Mechanical History Initial Completion history

Production History Workover History

Study: Well History

Study : Open and Cased hole logging & Core Data Study : Geological Data, Maps and Cross Sections

Study : Offset Well Performance Study : Well Completion Characteristics

PLT ?? Well Tests ??

Need special Surveys ??


Well problem can solve by Rigless Or Rig ?
( saturation Log ? MIT ?)

3
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Analysis Well problems

This analysis by :
• Reservoir Engineer
1.Possible Reasons • Petrophysics Engineer
• Production Engineer ( sub surface )

This decided by :
2.tools determined the
• Reservoir Engineer
problem • Petrophysics Engineer
Analysis
Well Production
problems The solution suggestion by:
• Reservoir Engineer
3.Remedial plan • Petrophysics Engineer
Executed the suggestion by:
workover ( rig or rig-less)

4
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Analysis Well problems

Well Problem Reservoir data


data identification

Identification of Alterative
remedial measures

Technical Economic
Evaluation Evaluation

Planning and
implementation of workover

Workover monitoring and


evaluation
5
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Workover operations

( Workover Operations )

1.Rig Operation 2.Rigless Operation


(Well intervention)
1. Workover Rig
1. Coiled tubing
2. Drilling Rig
2. Wireline logging
3. Slick Line Unit
4. Snubbing Unit

6
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda

1- introduction to analysis well problems

2- Objective of water solutions

3. Reasons for water

4. How Diagnostics water problem

5.Water shut-off (WSO) techniques

6. Case study

7
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Water Impact - Emerging Field Data

1500

Economic Limit for Water Production


R a t e, B P D

Unplanned water
Dev. Plan Assumption (oil)
Dev. Plan Assumption (water)
500 Emerging Data (oil))
Emerging Data (water)

Time
8
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1-Objective of Water Solutions

Increase oil
productivity

Reduce water Environment


handling cost Impact

9
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1-Objective of Water Solutions

10
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1-Objective of Water Solutions

Increase Recoverable Reserves

Economic WOR limit


log WOR

Incremental Oil
Due to Treatment

Cumulative oil bbl

11
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda

1- introduction to analysis well problems

2- Objective of water solutions

3. Reasons for water

4. How Diagnostics water problem

5.Water shut-off (WSO) techniques

6. Case study

12
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
2-Reasons for water

Simple Complex
1 2 3 4 5 6 7 8 9 10

Casing , tubing Moving OWC Water injection through Water coning to Water coning to the
or packer leak Natural fracture Bottom perforation Whole perforation zone

Channeling flow Water-out layer Heterogeneity of water Water-out layer with


Water zone through
Behind casing Without crossflow displacement crossflow
Natural fracture
13
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda

1- introduction to analysis well problems

2- Objective of water solutions

3. Reasons for water

4. How Diagnostics water problem

5.Water shut-off (WSO) techniques

6. Case study

14
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Three ways to diagnostics water Problem

1 2 3
Production
Cased hole Logging Tracer
data analysis

15
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1 Production data analysis
10000

1000

Qw
Qo
Barrels per day

100

10

0.1
1 10 100 1,000 10,000
Days

16
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
2 Cased hole logging

1-PLT 2-Saturation logs


1. Conventional PLT ( or ILT ) 1. Pulse neutron –neutron (PNN)
2. MAPS (Multiple Array Production Suite ) 2. Reservoir Performance Monitor (RPM)
 Spinner Array Tool (SAT) 3. Reservoir Monitor Tool (RMT)
 Resistivity Array Tool ( RAT ) 4. Pulse Neutron (PNX )
 Capacitance Array Tool ( CAT) 5. Reservoir saturation tool ( RST )

3-Cement logs 4-Casing inspection logs

1. MIT : Multi – Finger Imaging tool


2. MFC : Multi Finger Caliper
3. USI :Ultrasonic Image
4. ETT : Electromagnetic Thickness Tool
5. MTD : Magnetic Thickness Detector

5-Noise log 6-CHFR


17
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1 Cased hole logging

Evaluate completion performance


 New wells
1  Injection wells
 Re-completions

Monitor reservoir performance & variations


 Flow profile
2  Well test
 Completion Efficiency

Diagnose well problems


 Water entry
3 

Gas entry
Leaks and mechanical problem
 Flow behind casing

Other
 Guidance for workover
4  Information for enhanced oil Recovery projects
 Identify boundaries for field development

18
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
PLT Application ( packer leak , casing leak , tubing leak)

Tubing

casing

Water 2.Tubing leaks

3.Casing leaks
packer 1.Packer leaks

Oil

19
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
PLT Application ( Cross flow )

(Lower
Oil Pressure)

6.Thief zone

High
Oil Pressure)

20
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
PLT Application ( Channel behind casing by poor cement)

water

4.Channel
caused by
poor cement

Oil

21
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Pre-PLT- operation

1. Well Select: Y-Tool

 Well productivity ( low , medium , high ) ?


 Well trajectory ( vertical , deviated , horizontal ) ? ESP
 Well type ( injector , producer ) ?
 Check the well sketch ( single completion , commingle )?
 This well produce natural flow or Artificial lift ?
 If this well produce ( ESP ) , have Y- tools or not ?
 Well situation ( sand , asphalt ) ?

22
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Pre-PLT- operation

2.In well site before run PLT :

 Take fluid sample from well head and send to lab to check the water )
 Put the well to test separator to check the production at the same day will run PLT
 Keep the well head pressure and chock size constant before and after PLT operation ,
to compare the results .

23
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs

Application Of Saturation logs

1. Formation evaluation behind casing.


2. Water saturation in old wells.
3. Water saturation in new wells where
modern open hole logs have not been

24
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs

Application Of Saturation logs


1. Formation evaluation behind casing.
2. Water saturation in old wells.
3. Water saturation in new wells where
modern open hole logs have not been

After many years change the saturation

25
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs

Overview of Residual-Oil-Saturation

26
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs

Some types of saturation logs :

 Thermal Decay Time (TDT)


 Pulse Neutron Neutron ( PNN)
 Reservoir Performance Monitor (RPM)
 Reservoir Monitor Tool (RMT)
 Pulsed Neutron ( PNX)
 Reservoir Saturation Tool ( RST)

Note : Limitation in salinity and porosity

27
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs

Saturation log Modes


Measurement Matrix Modes type
Company Tool I.D Sigma C/O Water Inelastic gamma
Logging Logging Flow (gas)

Baker RPM √ √ √ √

Halliburton RMT √ √ √ √

Halliburton TMD √ √ √

Hotwell PNN √

Schlumberger RST √ √ √ √

Weatherford CRE √ √ √ √

28
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Noise Log Applications

Noise Log Applications


 Determine producing zone

 Determine production /injection profile

 Channeling behind casing

 Locating leakage point of wellbore

 Packer inspection

 Estimated production

Detection depth:2-3m

29
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Spectral Noise Physics
TBG, Channels Large Tight
Valves Perforation Fractures
CSG Faults Pores Formations

1 3 10 20 30

kHz

Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024


Type of cement logs

No Log Full name Company


1 CBL Cement Bond Log Many companies

2 SBT Segmented Bond Tool Backer Hughes

3 URS Ultra sonic redial scanner Weatherford


SBT Slim Sector Bond tool
4 RIB Radius Incremented Bond AWALCO

5 RBT Radial Bond Too Halliburton

6 CAST Circumferential Acoustic Scanning Tool Halliburton

7 USI Ultrasonic Image Schlumberger

8 SCMT Slim Cement Mapping Tool Schlumberger

Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024


Possible problems due to poor cement !!!

‫؟؟؟‬ 1 Channel flow behind casing

2 high pressure in annulus

3 Casing deformation

4 Water injection problem

32
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
(1) Channel flow behind casing:

Channel flow behind casing:


Failed primary cementing can connect water- OIL
bearing zones to the pay zone (below
middle). These channels allow water to flow Poor cement
behind casing in the annulus. A secondary
cause is the creation of a ‘void’ behind the
casing as sand is produced. water

33
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
(2) high pressure in annulus

Poor cement
high pressure in annulus because poor
cement

34
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
(3) Casing Deformation

35
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
(4) Water injection problem

Coolin
g

28%

38%

8%

80% 25%
20%
1%

Channeling

36
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Casing inspection log

Casing inspection is an important survey at all operation


stages of the well. Holes in tubing or casing caused by
corrosion or other damages can seriously affect production
rates and fluid composition, resulting in economic loss.
Casing inspection is carried out:

 to monitor the casing/tubing integrity;


 to identify casing splits, defects, metal loss and corrosion
area;
 quality control of the well intervention operations
(workover).

Casing inspection log is an individual measurement, or a combination of measurements using


acoustic, electrical and mechanical techniques, to evaluate the casing integrity.

37
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Type of casing inspection log

(MIT ) (USI) (ETT)


Multi – Finger Imaging tool Ultrasonic Image Electromagnetic Thickness Tool

measurement of the
thickness of a casing string even
while the tool itself is inside tubing.
38
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
MIT= multi – Finger imaging tool

Red Color is Casing damage ,


Casing damage
perforation , CCL

MIT section profile


MIT 3D-view

Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024


Example 1 : MIT-casing corrosion

GR Casing damage

CCL

Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024


Example 2: MIT ( 40F) ( casing deformation )

9 5/8” casing

GR

CCL

Casing deformation

Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024


3-Tracer

3 Tracers

‫معتدل‬ ‫يقسم الى‬

42
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda

1- introduction to analysis well problems

2- Objective of water solutions

3. Reasons for water

4. How Diagnostics water problem

5.Water shut-off (WSO) techniques

6. Case study

43
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
2-Reasons for water

Simple Complex
1 2 3 4 5 6 7 8 9 10

Completion Change

Production Change

Casing , tubing Moving OWC Water injection through Water coning to Water coning to the
or packer leak Natural fracture Drilling change to horizontal
Bottom perforation Whole perforation zone

Fluids or chemical methods

Mechanical methods
Channeling flow Water-out layer Water zone through Water-out layer with
Heterogeneity of water
Behind casing Without crossflow Natural fracture crossflow
displacement
44
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques

1-Mechanical methods

2-Fulid and Chemical Methods

3-Production optimization methods

4-Advance methods ( ICD , AICD , ICV)

45
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques

Many method using for water shut-off can do it rig less operation or by work-over rig :

through tubing bridge plug

cement plug

Bridge plug

Blank pipe with two packers


WSO
gel squeeze

polymer squeeze

ICD , ICV , AICD


46
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques

‫استباقية‬

‫رد فعل‬

47
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques

48
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques

49
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques

Bridge

cement plug Bridge plug


50
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques

Straddle packer Blank pipe with two packers


51
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Advance Water shut-off (WSO) techniques
Advance Water control using ICD in vertical and horizontal well

( ICD)-vertical well ( ICD)-Horizontal well 52


Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Advance Water shut-off (WSO) techniques

Water control using ICD horizontal well

53
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda

1- introduction to analysis well problems

2- Objective of water solutions

3. Reasons for water

4. How Diagnostics water problem

5.Water shut-off (WSO) techniques

6. Case study

54
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
About Authorized
Name: Abbas Radhi Abbas ‫عباس راضي عباس‬
Position: Chief Engineer / petroleum Engineer ‫مهندس نفط‬
Nationality: Iraq- Missan ‫العراق ميسان‬
Date of Birth: 1978
Gender: Male
Education Background:
Period Education description
1996-2001 University of Bagdad – college of Engineering – petroleum engineering department- (BSc)
Certificates of Appreciation
15 Certificates of Appreciation from difrent international companies such as (Schlumberger-Halliburton, Weatherford , CNOOC , COSL ,
BHDC )
24 online webinar for SPE , 2 papers ,
Work Experience : in Missan Oil Company ( MOC)
Period Work description
(2004-2006) reservoir engineer ‫مهندس مكامن‬
(2006-2010 ) water injection engineer ‫مهندس حقن ماء‬
during (2011) drilling and workover engineer ‫مهندس حفر واستصالح‬
(2011 to 2024 ) petrophysics manager in Reservoir department ‫مدير البتروفيزياء‬
Language:
Mother language: Arabic
Second language/level: English/Fluent oral and written in English. 56
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024

You might also like