Water Cut Problem - Abbas - 28!2!2024
Water Cut Problem - Abbas - 28!2!2024
Water Cut Problem - Abbas - 28!2!2024
Chief engineer
Abbas Radhi Abbas 1
MOC 28 -2-2024
Agenda
6. Case study
2
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
If you need analysis well problem must study all below details
Drilling history
Mechanical History Initial Completion history
Study : Open and Cased hole logging & Core Data Study : Geological Data, Maps and Cross Sections
3
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Analysis Well problems
This analysis by :
• Reservoir Engineer
1.Possible Reasons • Petrophysics Engineer
• Production Engineer ( sub surface )
This decided by :
2.tools determined the
• Reservoir Engineer
problem • Petrophysics Engineer
Analysis
Well Production
problems The solution suggestion by:
• Reservoir Engineer
3.Remedial plan • Petrophysics Engineer
Executed the suggestion by:
workover ( rig or rig-less)
4
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Analysis Well problems
Identification of Alterative
remedial measures
Technical Economic
Evaluation Evaluation
Planning and
implementation of workover
( Workover Operations )
6
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda
6. Case study
7
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Water Impact - Emerging Field Data
1500
Unplanned water
Dev. Plan Assumption (oil)
Dev. Plan Assumption (water)
500 Emerging Data (oil))
Emerging Data (water)
Time
8
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1-Objective of Water Solutions
Increase oil
productivity
9
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1-Objective of Water Solutions
10
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1-Objective of Water Solutions
Incremental Oil
Due to Treatment
11
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda
6. Case study
12
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
2-Reasons for water
Simple Complex
1 2 3 4 5 6 7 8 9 10
Casing , tubing Moving OWC Water injection through Water coning to Water coning to the
or packer leak Natural fracture Bottom perforation Whole perforation zone
6. Case study
14
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Three ways to diagnostics water Problem
1 2 3
Production
Cased hole Logging Tracer
data analysis
15
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
1 Production data analysis
10000
1000
Qw
Qo
Barrels per day
100
10
0.1
1 10 100 1,000 10,000
Days
16
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
2 Cased hole logging
Other
Guidance for workover
4 Information for enhanced oil Recovery projects
Identify boundaries for field development
18
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
PLT Application ( packer leak , casing leak , tubing leak)
Tubing
casing
3.Casing leaks
packer 1.Packer leaks
Oil
19
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
PLT Application ( Cross flow )
(Lower
Oil Pressure)
6.Thief zone
High
Oil Pressure)
20
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
PLT Application ( Channel behind casing by poor cement)
water
4.Channel
caused by
poor cement
Oil
21
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Pre-PLT- operation
22
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Pre-PLT- operation
Take fluid sample from well head and send to lab to check the water )
Put the well to test separator to check the production at the same day will run PLT
Keep the well head pressure and chock size constant before and after PLT operation ,
to compare the results .
23
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs
24
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs
25
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs
Overview of Residual-Oil-Saturation
26
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs
27
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Introduction to saturation logs
Baker RPM √ √ √ √
Halliburton RMT √ √ √ √
Halliburton TMD √ √ √
Hotwell PNN √
Schlumberger RST √ √ √ √
Weatherford CRE √ √ √ √
28
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Noise Log Applications
Packer inspection
Estimated production
Detection depth:2-3m
29
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Spectral Noise Physics
TBG, Channels Large Tight
Valves Perforation Fractures
CSG Faults Pores Formations
1 3 10 20 30
kHz
3 Casing deformation
32
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
(1) Channel flow behind casing:
33
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
(2) high pressure in annulus
Poor cement
high pressure in annulus because poor
cement
34
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
(3) Casing Deformation
35
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
(4) Water injection problem
Coolin
g
28%
38%
8%
80% 25%
20%
1%
Channeling
36
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Casing inspection log
37
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Type of casing inspection log
measurement of the
thickness of a casing string even
while the tool itself is inside tubing.
38
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
MIT= multi – Finger imaging tool
GR Casing damage
CCL
9 5/8” casing
GR
CCL
Casing deformation
3 Tracers
42
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda
6. Case study
43
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
2-Reasons for water
Simple Complex
1 2 3 4 5 6 7 8 9 10
Completion Change
Production Change
Casing , tubing Moving OWC Water injection through Water coning to Water coning to the
or packer leak Natural fracture Drilling change to horizontal
Bottom perforation Whole perforation zone
Mechanical methods
Channeling flow Water-out layer Water zone through Water-out layer with
Heterogeneity of water
Behind casing Without crossflow Natural fracture crossflow
displacement
44
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques
1-Mechanical methods
45
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques
Many method using for water shut-off can do it rig less operation or by work-over rig :
cement plug
Bridge plug
polymer squeeze
استباقية
رد فعل
47
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques
48
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques
49
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
4.Water shut-off (WSO) techniques
Bridge
53
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Agenda
6. Case study
54
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024
About Authorized
Name: Abbas Radhi Abbas عباس راضي عباس
Position: Chief Engineer / petroleum Engineer مهندس نفط
Nationality: Iraq- Missan العراق ميسان
Date of Birth: 1978
Gender: Male
Education Background:
Period Education description
1996-2001 University of Bagdad – college of Engineering – petroleum engineering department- (BSc)
Certificates of Appreciation
15 Certificates of Appreciation from difrent international companies such as (Schlumberger-Halliburton, Weatherford , CNOOC , COSL ,
BHDC )
24 online webinar for SPE , 2 papers ,
Work Experience : in Missan Oil Company ( MOC)
Period Work description
(2004-2006) reservoir engineer مهندس مكامن
(2006-2010 ) water injection engineer مهندس حقن ماء
during (2011) drilling and workover engineer مهندس حفر واستصالح
(2011 to 2024 ) petrophysics manager in Reservoir department مدير البتروفيزياء
Language:
Mother language: Arabic
Second language/level: English/Fluent oral and written in English. 56
Water cut problem ----------------- Abbas Radhi Abbas ------------------- 28-2-2024