EOWR CV-5X Combine 08may2008

Download as pdf or txt
Download as pdf or txt
You are on page 1of 85

Chevron Vietnam Block B Ltd,

2008 Exploration Campaign

Ca Voi-5X Exploration Well

Drilling End of Well Report

Prepared by: Verified by: Approved by:

Thang Quach Charles D. Hodkins James P. Carroll


Drilling Engineer Drilling Superintendent Drilling Manager
Date: Date: Date:
Distribution List

Recipient No. of copies


PVN 2
PVEP 1
MOECO 1
PTTEP 1
Chevron Vietnam 1

Table of Contents

General Well Data Summary 2


Final Rig Positioning Report 4
Daily Drilling Report 7
Bit Record 29
Casing & Cementing Summary 31
Directional Drilling Recap 52
Drilling Fluids Recap and Solid Control report 66
Abandonment Schematic 78
Time vs Depth, and Cost Summaries 80
Non Productive Time Summaries 82

Page 1
General Well Data

Well: 52-Ca Voi-5X


Well Description: Exploration Well
Well Status: Plugged and Abandoned

Days on Location: 17.83 days Cost: US$ 6,553,952


Date on Location: 15-Feb-2008 Date off Location: 4-Mar-2008
MD: 3,749 m TVD: 3,508.6 m

Final Location:
Latitude Longitude Northing Easting
8° 26’ 31.537”N 102° 39’ 03.306”E 933877.77 m 241384.88 m

Datum: Indian 1975 Projection: UTM


Ellipsoid: Everest 1830 UTM Zone: 48

Rig: Vicksburg
Drilling Contractor: Atwood
Rig Type: Jack Up
RT-MSL: 34.3 m
Water Depth: 78 m

Hole size Hole MD Hole TVD Casing size Casing MD Casing TVD
12” 310 m 310 m 9-5/8” 310 m 310 m
8-1/2” 1422 m 1402 m 7” 1419 m
6-1/8” 3749 m 3508.6 m

Evaluation Data Obtained Top Bottom

Mud log: Geoservices


Sample collected 10 m interval 310 m 1500 m
Sample collected 5 m interval 1500 m 3749 m

Electric logs: Halliburton


Run # 1: Quad Combo 1270 m 3759 m
Run # 2: HSFT 1445 m 3606 m
Run # 3: RDT 1569.8 m 1786.9 m
Run # 4: Check Shot Survey (30m interval) 240 m 3390 m
Run # 5: Side Wall Core 1465.5 m 3394.9 m
(42 shots: 28 good, 3 misfired, 11 empty & 0 lih)

MWD Surveys: Sperry Sun (HAL) 9-5/8” shoe TD

Page 2
AFE depths vs Actual depths Measured Depth True Vertical Depth
12” AFE 305 m 305 m
12” Actual 310 m 310 m
Reason for difference Drill to casing tally

8-1/2” AFE 1425 m 1405 m


8-1/2” Actual 1422 m 1402 m
Reason for difference

6-1/8” AFE 3577 m 3356 m


6-1/8” Actual 3749 m 3507 m
Reason for difference MOC was raised to deepen the well to evaluate the
full K sequence and the upper most basement.

Notes
1 Ca Voi-5X is the third exploration well in 2008 campaign.

The well design is a slim hole type, with the first section riser-less drilling 9-
5/8” casing.

2 Drilling rig Vicksburg (Atwood) was towed from NKL-3X to CV-5X on 15-
Feb-2008. Towing distance to CV-5X location is 19.8 NM (36.7 km).

3 MOC dated 25-Feb-2008 to deepen well TD to 3582 mTVDRT to evaluate the


full K sequence and the upper most basement.

4 CV-5X location is a potential punch through location, a conservative preload


plan was requested (single leg preload at minimum air gap).

Page 3
Final Positioning Report

Page 4
Daily Drilling Reports

Page 7
Drilling Morning Report

Well Name : CV-5X


Date: 2/15/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/15/2008 07:00 2/16/2008 00:00
Daily Cost Total Cum Cost To Date
217,353.04 217,353.04
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
0.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
07:00 18:30 Rig under tow from NKL-3X to CV-5X. Commence lowering legs.
18:30 19:30 Final approach to location. Soft pin on location at 19:15 p.m. Distance travelled = 20.2 NM.
19:30 00:00 Jack hull to 0 ft air gap. Initial penetrations on Bow leg = 23 ft, Stb leg = 24 ft, Port leg = 24 ft. Preliminary position report:
Latitude - 8 deg 26' 31.523"N, Longitude - 102 deg 39' 03.298"E. Rig Heading of 25.4 deg True. Distance from intended
location is 6.8m. Disconnect Premaraj Tide from secondary tow bridle. Jack up to 3 ft air gap. Monitor rig for settlement.
Remove sea caps, whilst installing Bow and Port preload pumps. Seas are too rough to take on preload.

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/16/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/16/2008 00:00 2/17/2008 00:00
Daily Cost Total Cum Cost To Date
306,851.34 524,204.38
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
1.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 00:00 Wait on weather. Unable to preload at 0-1ft draft due to seastate.
00:00 hrs: Seas 1-1.5m, 17 knot winds.
06:00 hrs: Seas 1-1.5m, 10 knot winds.
12:00 hrs: Seas 1-1.6m, 17 knot winds.
18:00 hrs: Seas 1.5-2m, 18 knot winds.
Whilst waiting on weather, Service TDS-4, changeout saver sub, check fluid ends on mud pumps. Continue with preventative
maintenance.

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/17/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/17/2008 00:00 2/18/2008 00:00
Daily Cost Total Cum Cost To Date
306,851.34 831,055.72
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
2.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 00:00 Wait on weather. Unable to preload at 0-1ft draft due to seastate.
06:00 hrs: Seas 0.8 - 1.0m, 16 knot winds
12:00 hrs: Seas 1.0 - 1.0m, 15 knot winds
18:00 hrs: Seas 1.0 - 1.2m, 15 knot winds
22:00 hrs: Seas 1.0 - 1.2m, 19 knot winds
00:00 hrs: Seas 1.0 - 1.3m, 15 knot winds
Continue with preventative maintenance.

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/18/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/18/2008 00:00 2/19/2008 00:00
Daily Cost Total Cum Cost To Date
306,851.34 1,137,907.07
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
3.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 22:00 Wait on weather. Unable to preload at 0-1ft draft due to seastate.
06:00 hrs: Seas 1.3 - 1.5m, 15 knot winds
12:00 hrs: Seas 1.0 - 1.3m, 13 knot winds
18:00 hrs: Seas 0.8 - 1.2m, 11 knot winds
22:00 hrs: Seas 0.7 - 1.0m, 09 knot winds
Continue with preventative maintenance.

22:00 00:00 Jack down to zero airgap.


Start single leg preload on bow leg.
50% preload onboard at 00:00hrs.

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/19/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/19/2008 00:00 2/20/2008 00:00
Daily Cost Total Cum Cost To Date
306,851.34 1,444,758.41
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
4.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 03:30 Commence single leg preloading on bow leg. 100% preload onboard. Using deepwell pumps for filling tanks. Holding 100%
preload on bow leg. Rig settling. Dump preload. Jack up to 0' airgap.
03:30 06:00 Commence cycle #2 with single leg preloading on bow leg. 100% preload onboard. Using preload pumps for filling tanks.
Held 100% preload on bow leg for 1hr. No settling. Dump preload. Bow leg penetration 26.5'.
06:00 09:30 Commence with single leg preloading on port leg. 100% preload onboard. Using deepwell pumps for filling tanks. Holding
100% preload on bow leg. Rig settling, hull at 2' draft. Dump preload. Jack up to 0' airgap.
09:30 12:30 Commence #2 cycle with single leg preloading on port leg. 100% preload onboard. Using preload pumps for filling tanks.
Holding 100% preload on port leg. Rig settling. Dump preload. Jack up to 0' airgap.
12:30 15:30 Commence cycle #3 with single leg preloading on port leg. 100% preload onboard. Using preload pumps for filling tanks.
Held 100% preload on port leg for 1hr. No settling. Dump preload. Port leg penetration 33'.
15:30 19:00 Commence single leg preloading on starboard leg. 100% preload onboard. Using deepwell pumps for filling tanks. Holding
100% preload on starboard leg. Rig settling. Dump preload. Unable to dump tank #33, dump valve sheared.
19:00 22:00 Rig up bilge pumps and pump out tank #33. Pump tank to 5ft volume.
22:00 00:00 Jack up rig to 0' airgap. Start filling preload tanks whilst continuing to empty tank #33 and work on dump valve.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/20/2008
Rig : Vicksburg

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/20/2008 00:00 2/21/2008 00:00
Daily Cost Total Cum Cost To Date
306,851.34 1,751,609.75
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
5.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 02:00 Fill preload tank #33 and hold 100% preload on starboard leg for 1hr. No settling.
Leg penetrations: Bow - 26.5', Port - 33' , Starboard - 26'
02:00 08:00 Commence simultaneous preloading. Using preload pumps for filling port and bow legs. 87% preload achieved. Rig settling.
Dump preload. Jack up to 1' air gap.
08:00 18:30 Commence simultaneous preloading #2 cycle. Using preload pumps for filling tanks. Rig settling. Dump preload. jack up to 1'
air gap.
18:30 23:30 Commence simultaneous preloading #3 cycle. Using preload pumps for filling tanks. 100% preload onboard.
Leg penetrations: Bow - 31', Port - 35.5' , Starboard - 31'
23:30 00:00 Holding 100% preload.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/21/2008
Rig : Vicksburg
Depth End (mKB): 310.25 TVD End (mKB): 309.89

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/21/2008 00:00 2/22/2008 00:00
Daily Cost Total Cum Cost To Date
380,961.15 2,132,570.89
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
0.35 6.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 07:30 Hold 100% preload for 8 hours.
07:30 09:00 Dump all preload tanks. Install leg ropes
09:00 10:00 Lower hull to 0'airgap. Callibrate depth and jack hull to 47' gap. Final penetrations Bow leg: 31', Stb. leg: 33', Port leg: 35'.
Note final rig position, Lat 08 Deg 26' 31.537"N, Long 102 Deg 39' 03.306"E, Bow heading 24.7 Deg true.(25 Deg grid). 7.1
metre from the intended location.

10:00 13:00 Lower conductor deck while Skidding out. Skid in enough to install icon tensioner, install ladder & handrails. Skid out to
drilling position.
Install mud dryer and overboard line. Lower wing valves for wellhead & prepare rig floor for drilling with casing.

13:00 13:30 P/U and M/U 9-5/8" wellhead and rack in derrick.
13:30 14:00 Perform abandon ship drill and help riserless drilling meeting.
14:00 15:30 JSA, R/U BJ equipment. P/U and RIH 12" BBL drill shoe, 9-5/8" float collar & 7 joints 40-ppf 9-5/8" csg to 110m MD. M/U
Baker casing spear to TDS.
15:30 18:00 Tag mudline at 112m. Drill in casing from 112m MD(mudline) to 292m MD. M/U 9 LST wellhead, and drill down the casing
with 9.2 ppg Barazan mud to 310m MD / 310m TVD.
18:00 19:00 Circ. 1050 stks. R/U BJ lines and test to 2000 psi. Pump 78 bbls of 15.5 ppg cement slurry with BJ. Disp. cement with 68.2
bbls of seawater. CIP - 18:50 hrs. Check back flow (OK). L/D landing joints and wellhead running tool.
19:00 21:00 Install test plug. Install side outlet valves and wellhead adaptor spool. Nipple up Bop's. Install bell nipple. Install witches hats.
21:00 21:30 Pressure test connection 250/5000 psi. 3/3 mins
21:30 22:30 M/U test assy. Install landing joint and test annular 300/3500psi. Remove test plug and install wear bushing. Laydown test
assy.
22:30 00:00 JSA. P/U & M/U 19 stands (57 joints) of 4" Drillpipe and rack back in the derrick.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Water (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
51 14.0 13.000
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
112.40 112.40 310.25 309.89 2.50 79.1
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/21/2008 0.00 0.00 0.00 0.00 -6.46 1.47 7.08 0.00
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/22/2008
Rig : Vicksburg
Depth End (mKB): 1,422.00 TVD End (mKB): 1,402.17

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/22/2008 00:00 2/23/2008 00:00
Daily Cost Total Cum Cost To Date
357,872.57 2,490,443.46
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
1.35 7.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 02:30 P/U & M/U 24 stands (72 joints) of 4" Drillpipe and rack back in the derrick. Total 41stands racked back.
Test casing and wing valves offline to 800psi.
02:30 04:30 JSA. P/U & M/U 8 1/2" BHA. Install MWD probe in string. RIH w/ same. Single in hole 8 stands (24 joints) of 4" HWDP to
246m MD.
04:30 05:30 Wash down and tag cement @ 280m MD. Drilled out cement, FC @ 296m and shoe @ 310m. Drilled 1.5m of new formation
from 310m to 311.5 MD. Circulated bottom's up with 8.6 ppg seawater. Sample was 20% clay, 60% cmt, 20% sand.
Performed LOT at 310m TVD to 220 psi surface casing pressure (12.7 ppg EMW).

05:30 16:30 Directionally drilled 8-1/2" hole from 311.5m MD to intermediate section TD at 1422m MD / 1402m TVD. Top of MMU at
1110m MD / 1108m TVD.
16:30 18:00 Pumped 50bbl 12ppg weighted sweep. Circulated and displaced well to 9.2 ppg gel polymer mud. Circulated bottoms up 3
times. Calculated average hole size: 12.2".
18:00 21:00 Flow checked. Pumped slug. Pulled out of the hole with BHA. Laid down bit and MWD probe.
21:00 00:00 Pulled wear bushing. Held pre-job safety meeting. Rigged up and ran in the hole with 7" 23ppf casing to 725m MD.
00:00 00:00
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
Water (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
52 14.0 16.000
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
310.25 309.89 1,422.00 1,402.17 11.50 96.7
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/22/2008 317.00 6.20 218.50 316.60 -2.04 -7.20 0.18 0.91
2/22/2008 375.00 7.90 224.70 374.20 0.83 -12.34 -4.17 1.84
2/22/2008 403.00 5.60 228.70 402.01 2.54 -14.61 -6.55 2.51
2/22/2008 432.00 1.70 212.30 430.95 3.46 -15.91 -7.84 4.14
2/22/2008 461.00 0.70 185.90 459.94 3.56 -16.45 -8.09 1.16
2/22/2008 490.00 1.00 61.10 488.94 3.35 -16.50 -7.89 1.57
2/22/2008 519.00 2.50 35.80 517.92 2.94 -15.87 -7.29 1.71
2/22/2008 548.00 2.60 34.00 546.89 2.50 -14.81 -6.56 0.13
2/22/2008 577.00 2.50 40.00 575.87 2.02 -13.78 -5.78 0.29
2/22/2008 606.00 2.50 39.10 604.84 1.49 -12.80 -4.98 0.04
2/22/2008 635.00 2.30 37.00 633.81 1.02 -11.85 -4.23 0.23
2/22/2008 693.00 2.20 36.10 691.77 0.18 -10.02 -2.87 0.05
2/22/2008 722.00 2.20 35.40 720.75 -0.21 -9.12 -2.22 0.03
2/22/2008 752.00 2.00 30.70 750.73 -0.56 -8.20 -1.62 0.26
2/22/2008 780.00 2.30 26.10 778.71 -0.80 -7.27 -1.12 0.37
2/22/2008 809.00 2.40 25.70 807.68 -1.02 -6.20 -0.60 0.10
2/22/2008 838.00 2.20 22.70 836.66 -1.21 -5.14 -0.13 0.24
2/22/2008 867.00 2.70 37.50 865.63 -1.55 -4.09 0.51 0.83
2/22/2008 896.00 2.60 37.70 894.60 -2.06 -3.02 1.32 0.10
2/22/2008 925.00 2.80 41.80 923.57 -2.63 -1.98 2.20 0.29
2/22/2008 954.00 2.70 42.10 952.54 -3.26 -0.94 3.13 0.10
2/22/2008 983.00 2.60 41.40 981.51 -3.87 0.06 4.02 0.11

Page 1/2 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/22/2008
Rig : Vicksburg

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/22/2008 1,012.00 2.20 45.30 1,010.48 -4.44 0.94 4.85 0.45
2/22/2008 1,041.00 1.70 47.20 1,039.46 -4.95 1.63 5.56 0.52
2/22/2008 1,070.00 1.30 0.40 1,068.45 -5.10 2.25 5.88 1.29
2/22/2008 1,099.00 2.20 314.40 1,097.44 -4.53 2.97 5.48 1.65
2/22/2008 1,128.00 2.60 316.30 1,126.42 -3.48 3.83 4.63 0.42
2/22/2008 1,157.00 5.20 297.80 1,155.35 -1.64 4.92 3.02 2.95
2/22/2008 1,186.00 7.70 287.20 1,184.16 1.58 6.11 0.00 2.85
2/22/2008 1,215.00 11.10 291.10 1,212.77 6.30 7.69 -4.47 3.58
2/22/2008 1,244.00 15.20 287.20 1,241.00 12.88 9.82 -10.70 4.34
2/22/2008 1,273.00 19.50 282.50 1,268.68 21.52 11.99 -19.07 4.68
2/22/2008 1,301.00 23.70 282.80 1,294.71 31.82 14.25 -29.12 4.50
2/22/2008 1,330.00 28.00 284.80 1,320.80 44.45 17.28 -41.39 4.54
2/22/2008 1,359.00 27.80 284.40 1,346.43 58.02 20.70 -54.52 0.28
2/22/2008 1,388.00 27.80 283.70 1,372.08 71.55 23.99 -67.64 0.34
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 2/2 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/23/2008
Rig : Vicksburg
Depth End (mKB): 1,780.00 TVD End (mKB): 1,721.28

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/23/2008 00:00 2/24/2008 00:00
Daily Cost Total Cum Cost To Date
632,527.52 3,122,970.98
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
2.35 8.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 02:00 Continue to RIH with 7" casing from 750m MD to 1402m MD. Made up 7" casing hanger. Landed hanger with casing shoe
at 1419m MD / 1400m TVD. Tested seals to 5,000 psi. Laid down landing joint and running tool.
02:00 03:00 R/U BJ cement head and surface lines. Rig pump at 60 spm, 480 psi to circulate casing volume 182 bbls
03:00 04:00 JSA. BJ pump 20 bbls spacer. BJ pressure test line to 3500 psi - 3 min is OK. BJ mix and pump 135 bbl 15.9 ppg Tail Slurry
BJ displace with 181.9 bbls seawater at 03:57 hrs.
04:00 05:30 R/D BJ Cement head and Surface Equipment. Break out and L/D Landing String. R/D BJ Tubular equipment. RIH and set
wear bushing.
05:30 06:00 Retrieve 8-1/2" BHA from Derrick, break out and lay down same.
06:00 09:00 JSA. P/U and M/U 36 stds 4" drill pipe and rack in derrick. Total 77 stds in derrick.
09:00 10:30 JSA. Made up BHA #3 with 6-1/8" bit. Ran in the hole with 4" HWDP and shallow tested both MWD and AGS. AGS pressure
recorded at 290 GPM: 1400 psi under; 1800 psi full.
10:30 15:00 JSA. P/U and M/U 4" drill pipe from Catwalk and RIH to 1345 m.
Toatl 38 stands RIH.
15:00 15:30 Services TDS and Rig floor Equipment
15:30 16:00 Wash in hole from 1345m and tag top of cement. Tagged cement at 1375m MD. Perform casing test to 5000 psi with BJ.
OK.
16:00 17:30 Drilled out cement, FC @ 1407m and shoe @ 1419m while displacing to NAF. Cleaned out rat hole. Drilled 3 m of new
formation to 1425m MD. Circulated bottom's up with 9.2 ppg SBM. Performed FITat 1400m TVD with 9.2 NAF to 1863 psi
surface casing pressure ( 17ppg EMW).

17:30 00:00 Drilled 6-1/8" hole from 1425m MD to 1780m MD / 1721m TVD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 9.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
52 15.0 14.000 3.0
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
1,422.00 1,402.17 1,780.00 1,721.28 6.50 55.1
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/23/2008 1,447.00 27.90 283.50 1,424.25 99.10 30.47 -94.43 0.07
2/23/2008 1,476.00 27.80 283.40 1,449.89 112.64 33.62 -107.61 0.11
2/23/2008 1,505.00 27.80 283.20 1,475.54 126.16 36.73 -120.77 0.10
2/23/2008 1,534.00 27.50 283.20 1,501.23 139.61 39.80 -133.87 0.31
2/23/2008 1,558.00 27.30 283.00 1,522.54 150.65 42.31 -144.63 0.28
2/23/2008 1,592.00 27.00 282.80 1,552.79 166.16 45.77 -159.75 0.28
2/23/2008 1,621.00 26.90 282.80 1,578.64 179.29 48.68 -172.57 0.10
2/23/2008 1,650.00 26.60 282.60 1,604.54 192.33 51.55 -185.30 0.32
2/23/2008 1,679.00 26.10 282.50 1,630.52 205.19 54.35 -197.87 0.52
2/23/2008 1,708.00 25.60 282.30 1,656.62 217.82 57.07 -210.22 0.53
2/23/2008 1,737.00 26.00 282.50 1,682.73 230.43 59.78 -222.54 0.42
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/24/2008
Rig : Vicksburg
Depth End (mKB): 2,879.00 TVD End (mKB): 2,709.94

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/24/2008 00:00 2/25/2008 00:00
Daily Cost Total Cum Cost To Date
346,636.42 3,469,607.40
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
3.35 9.71
Ops Supervisors
Wellsite Personnel
Darren Geitz
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 00:00 Drilled 6-1/8" hole from 1780m MD to 2879m MD / 2710m TVD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 10.10
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
58 16.0 16.000 2.6
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
1,780.00 1,721.28 2,879.00 2,709.94 24.00 45.8
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/24/2008 1,766.00 26.30 282.60 1,708.76 243.20 62.55 -235.02 0.31
2/24/2008 1,795.00 25.60 282.50 1,734.84 255.88 65.31 -247.41 0.73
2/24/2008 1,824.00 26.20 282.60 1,760.93 268.54 68.06 -259.77 0.62
2/24/2008 1,853.00 26.30 282.80 1,786.94 281.35 70.88 -272.28 0.14
2/24/2008 1,882.00 26.50 283.00 1,812.91 294.24 73.76 -284.85 0.23
2/24/2008 1,911.00 26.30 283.20 1,838.89 307.13 76.68 -297.41 0.23
2/24/2008 1,940.00 25.80 283.20 1,864.94 319.85 79.59 -309.81 0.52
2/24/2008 1,969.00 25.50 282.80 1,891.08 332.40 82.42 -322.04 0.36
2/24/2008 1,998.00 25.80 283.00 1,917.23 344.94 85.22 -334.28 0.32
2/24/2008 2,027.00 25.80 283.20 1,943.33 357.56 88.08 -346.57 0.09
2/24/2008 2,056.00 25.20 283.20 1,969.51 370.04 90.93 -358.73 0.62
2/24/2008 2,085.00 25.40 283.20 1,995.73 382.43 93.76 -370.79 0.21
2/24/2008 2,114.00 25.20 283.00 2,021.95 394.81 96.57 -382.86 0.22
2/24/2008 2,143.00 25.80 283.00 2,048.12 407.29 99.38 -395.03 0.62
2/24/2008 2,172.00 25.90 283.00 2,074.22 419.93 102.22 -407.35 0.10
2/24/2008 2,201.00 25.40 283.00 2,100.36 432.47 105.05 -419.58 0.52
2/24/2008 2,230.00 25.60 283.20 2,126.54 444.95 107.88 -431.74 0.23
2/24/2008 2,259.00 26.20 283.20 2,152.62 457.61 110.77 -444.07 0.62
2/24/2008 2,288.00 26.10 283.20 2,178.66 470.38 113.69 -456.52 0.10
2/24/2008 2,317.00 26.20 282.60 2,204.69 483.16 116.54 -468.97 0.29
2/24/2008 2,346.00 25.90 282.50 2,230.74 495.88 119.31 -481.41 0.31
2/24/2008 2,375.00 25.80 282.10 2,256.84 508.51 122.00 -493.76 0.21
2/24/2008 2,404.00 26.60 282.30 2,282.86 521.30 124.71 -506.27 0.83
2/24/2008 2,433.00 27.00 282.50 2,308.74 534.36 127.52 -519.04 0.42
2/24/2008 2,462.00 26.70 282.50 2,334.62 547.45 130.35 -531.83 0.31
2/24/2008 2,491.00 26.50 282.10 2,360.55 560.42 133.12 -544.52 0.28
2/24/2008 2,520.00 25.90 281.90 2,386.57 573.20 135.78 -557.04 0.63
2/24/2008 2,549.00 25.50 282.10 2,412.70 585.76 138.39 -569.34 0.42
2/24/2008 2,578.00 25.40 281.80 2,438.89 598.21 140.97 -581.54 0.17
2/24/2008 2,607.00 25.20 281.60 2,465.10 610.58 143.49 -593.67 0.22
2/24/2008 2,636.00 25.70 281.80 2,491.29 623.02 146.01 -605.87 0.52
2/24/2008 2,665.00 26.20 281.40 2,517.37 635.69 148.57 -618.31 0.55
2/24/2008 2,694.00 25.60 281.40 2,543.45 648.33 151.07 -630.72 0.62
2/24/2008 2,723.00 25.60 281.20 2,569.61 660.84 153.52 -643.01 0.09
2/24/2008 2,752.00 25.60 281.40 2,595.76 673.34 155.98 -655.30 0.09

Page 1/2 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/24/2008
Rig : Vicksburg

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/24/2008 2,781.00 25.30 281.20 2,621.95 685.78 158.42 -667.52 0.32
2/24/2008 2,809.00 26.10 281.40 2,647.18 697.89 160.80 -679.42 0.86
2/24/2008 2,837.00 26.50 281.10 2,672.28 710.27 163.22 -691.59 0.45
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 2/2 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/25/2008
Rig : Vicksburg
Depth End (mKB): 3,197.00 TVD End (mKB): 2,998.02

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/25/2008 00:00 2/26/2008 00:00
Daily Cost Total Cum Cost To Date
349,814.42 3,819,421.82
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
4.35 10.71
Ops Supervisors
Wellsite Personnel
Leo Mclean
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 12:00 Drilled 6-1/8" hole from 2879m MD / 2710m TVD to 3197m MD / 2998m TVD. ROP slowed to 8m /hr, attempted various
parameters. Unable to improve ROP. No change in formation.
12:00 13:30 Circulate 10 mins, perform mini swab and circulate bottoms up.
Mini swab @ 3179m MD / 2998m TVD. Gas 8 / 7 units.
13:30 19:00 Flow check, slug pipe and pull out of hole to surface.
19:00 20:30 Break bit and changeout MWD probe. M/U BHA #4 with 6-1/8" bit. Shallow tested both MWD and AGS on first stand of
HWDP. AGS pressure recorded at 290 GPM: 1600 psi under; 2050 psi full. Ran in the hole with 4" HWDP to 246m.
20:30 21:30 RIH w/ 6 1/8" AGS assy picking up singles from deck to 536m. Total 30 joints ( 10 stands) picked up
21:30 22:30 Continue to RIH from 536m to 1400m from mast.
22:30 23:00 Service TDS assy.
23:00 00:00 Continue to RIH from 1400m to 2200m MD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 10.10
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
56 18.0 14.000 2.8
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,197.00 2,998.02 3,197.00 2,998.02
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/25/2008 2,867.00 26.20 280.70 2,699.16 723.55 165.74 -704.67 0.35
2/25/2008 2,896.00 25.60 280.50 2,725.25 736.18 168.07 -717.12 0.63
2/25/2008 2,925.00 25.30 280.40 2,751.43 748.61 170.33 -729.37 0.31
2/25/2008 2,983.00 25.60 280.50 2,803.80 773.45 174.85 -753.88 0.16
2/25/2008 3,012.00 26.00 280.50 2,829.91 786.03 177.15 -766.29 0.41
2/25/2008 3,041.00 25.60 280.40 2,856.02 798.62 179.44 -778.71 0.42
2/25/2008 3,070.00 25.60 280.20 2,882.18 811.10 181.68 -791.04 0.09
2/25/2008 3,099.00 25.00 279.60 2,908.39 823.45 183.81 -803.24 0.67
2/25/2008 3,103.00 25.00 279.50 2,912.02 825.13 184.09 -804.91 0.32
2/25/2008 3,128.00 24.70 279.10 2,934.70 835.59 185.79 -815.28 0.41
2/25/2008 3,157.00 23.40 278.20 2,961.19 847.33 187.57 -826.96 1.40
2/25/2008 3,186.00 22.60 277.20 2,987.88 858.57 189.09 -838.19 0.92
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/26/2008
Rig : Vicksburg
Depth End (mKB): 3,748.00 TVD End (mKB): 3,507.66

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/26/2008 00:00 2/27/2008 00:00
Daily Cost Total Cum Cost To Date
369,434.42 4,188,856.24
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
5.35 11.71
Ops Supervisors
Wellsite Personnel
Leo Mclean
Shayne Atkins
Time Log
Start Time End Time Comment
00:00 01:30 Continue to RIH from 2200m MD to 3179m MD. Precautionary wash and ream to bottom last two stands.
01:30 00:00 Drilled 6-1/8" hole from 3197m MD / 2998m TVD to 3748m MD / 3508m TVD.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 10.20
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
52 17.0 16.000 2.2
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,197.00 2,998.02 3,748.00 3,507.66 22.50 24.5
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)
2/26/2008 3,215.00 23.10 276.80 3,014.61 869.72 190.46 -849.37 0.54
2/26/2008 3,244.00 22.60 276.70 3,041.33 880.87 191.79 -860.55 0.52
2/26/2008 3,302.00 21.90 276.50 3,095.01 902.59 194.31 -882.37 0.36
2/26/2008 3,331.00 21.90 275.90 3,121.92 913.28 195.48 -893.12 0.23
2/26/2008 3,389.00 23.70 275.20 3,175.38 935.45 197.65 -915.49 0.94
2/26/2008 3,418.00 24.90 275.60 3,201.81 947.22 198.77 -927.37 1.25
2/26/2008 3,446.00 24.80 275.10 3,227.22 958.82 199.87 -939.09 0.25
2/26/2008 3,475.00 24.30 274.50 3,253.60 970.68 200.88 -951.09 0.58
2/26/2008 3,504.00 23.50 273.80 3,280.11 982.21 201.73 -962.81 0.88
2/26/2008 3,548.00 22.50 273.60 3,320.61 999.07 202.84 -979.97 0.68
2/26/2008 3,562.00 22.10 273.50 3,333.57 1,004.28 203.17 -985.27 0.86
2/26/2008 3,591.00 21.40 272.60 3,360.50 1,014.79 203.74 -996.00 0.80
2/26/2008 3,620.00 21.10 272.10 3,387.53 1,025.05 204.17 -1,006.50 0.36
2/26/2008 3,678.00 20.20 270.80 3,441.80 1,044.93 204.70 -1,026.95 0.52
2/26/2008 3,707.00 19.70 270.10 3,469.06 1,054.51 204.77 -1,036.84 0.57
2/26/2008 3,736.00 19.70 270.50 3,496.37 1,063.97 204.82 -1,046.62 0.14
2/26/2008 3,749.00 19.70 270.50 3,508.61 1,068.21 204.86 -1,051.00 0.00
Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/27/2008
Rig : Vicksburg
Depth End (mKB): 3,749.00 TVD End (mKB): 3,508.61

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/27/2008 00:00 2/28/2008 00:00
Daily Cost Total Cum Cost To Date
315,509.42 4,504,365.66
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
6.35 12.71
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 00:30 Drilled 6-1/8" hole from 3747m MD to TD at 3749m MD / 3509m TVD.
00:30 02:30 Performed static gas and swab test at 3749m MD (TD); circulated bottoms up. Static gas test: 20/33 units. Swab gas test:
20/33 units.
02:30 08:00 Pulled ten stands. Verified hole was taking proper fill. POOH to 3255m MD. Pipe coming wet. Pumped slug and pulled out of
hole to bha.
08:00 08:30 Remove float , MWD probe, Bit, stand bha in mast.
08:30 18:00 Held jsa rigged up halliburton eline,RIH with Quad-combo. Logged down from 300m to 1400m wlm at 2195m/hr, logged
From 1400m to 3740m at 1524m/hrs. Logged up from 3759m to 1270m wlm at 549 m/hr.Pull out of hole with wireline and
l/down quad combo. Density temperature at 351 degrees. All depths are loggers depths.
Average hole size: 6.2"
Bottom hole temp: 372deg

18:00 00:00 Picked up HSFT. Function tested tool and ran in the hole with same. Took total of 22 pressure points from 1445m to 1977m
MD (20 valid, 1 tight, 0 lost/no seal, 1 supercharged, 0 aborted). @ 2400 hrs. (50 Total pressure points planned).

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 10.20 196,000
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
55 19.0 14.000 2.2
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)
3,748.00 3,507.66 3,749.00 3,508.61 0.50 2.0
Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/28/2008
Rig : Vicksburg
Depth End (mKB): 3,749.00 TVD End (mKB): 3,508.61

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/28/2008 00:00 2/29/2008 00:00
Daily Cost Total Cum Cost To Date
327,097.42 4,831,463.08
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
7.35 13.71
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 08:00 Picked up HSFT. Function tested tool and ran in the hole with same. Took total of 63 pressure points from 1445m to 3606m
MD (44 valid, 3 tight, 3 lost/no seal, 2 supercharged, 11 aborted). Hole conditions were good. Tools reached permitted
temperature. Pulled out of hole and rigged down Halliburton wireline.

08:00 00:00 Picked up RDT tool assy. RIH with same and take samples 10 samples from 1569.8m to 1786.9m, 8 valid, 1 tight, 0 lost or no
seal, 1 aborted, 0 supercharged, including 7 pumpouts and 6 samples.

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 10.20 196,000
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
56 19.0 15.000 2.2
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 2/29/2008
Rig : Vicksburg
Depth End (mKB): 3,749.00 TVD End (mKB): 3,508.61

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
2/29/2008 00:00 3/1/2008 00:00
Daily Cost Total Cum Cost To Date
320,396.42 5,151,859.50
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
8.35 14.71
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 01:30 POOH with RDT assy and laydown same.
01:30 10:30 Rigged up check shot logging tools, Checked tool string and ran in hole to 600m. Took first check shot. Ran in hole to
1200m. Ran in hole to 1800m , Ran in hole to 2400m,Ran in hole to 3400m Unable to pass at 3400m. Started uphole check
shot survey.First uphole check short survey at 3390m. After that take check shots every 30m from 3390m to 240m.
Finish checkshot survey . POOH and laydown tools.

10:30 20:00 M/U SWC guns. Rig on radio silence until core guns below 500'. Correlate and take core samples as per program. Get cores
from 3394.9m MD to 1465.5 MD. POOH & lay down CST gun. R/D Halliburton. {42 shots, 28 good, 3 misfire, 11 empty & 0
lost in the hole}.

20:00 22:30 Held jsa, Rig up and P/up and rih with 49 jts 2 7/8" tbg + mule shoe jt to 470m.
22:30 00:00 Make up xo and tih with 4" drill pipe to 1630m, Break circulation every 20 stds to break gels in mud.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
SBM (Other) 10.20 196,000
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
55 19.0 14.000 2.2
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 3/1/2008
Rig : Vicksburg
Depth End (mKB): 3,749.00 TVD End (mKB): 3,508.61

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
3/1/2008 00:00 3/2/2008 00:00
Daily Cost Total Cum Cost To Date
328,053.27 5,479,912.77
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
9.35 15.71
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 02:30 Continued to RIH with cement stinger on 4" drill pipe to 3365m, Breaking circulation every 20 stds.
02:30 04:00 Circulated and displaced NAF with 10.3 ppg water base mud.
04:00 05:00 R/up BJ, tested lines and performed open hole cement job. Place 14 ppg gas tight slurry from 3365m MD to 2985m MD
05:00 06:00 While pulling back to 2940m MD pipe became stuck at 3166m MD. Attempted to work free. Pipe came free at 430 k weight
indicator.Continued to pull out of hole to 2940m.
06:00 08:00 Dropped carbide lag, circulated bottoms up to check system volume. Carbide indicated tubing still in place.
08:00 09:30 Continued to pull out of hole to next plug setting depth at 2202m MD. Dropped additional carbide lag and checked system
volume. Results in-conclusive due to bottoms up strokes from string with tubing almost equivalent to total circulation without
tubing, making it difficult to determine from bottoms up gas or carbide return. Discuss with town and decision made to pull out
to inspect tubing status.

09:30 13:00 Pulled out of hole. Recovered and laid out 10 joints plus 1 ft of tubing of original 50 joints. Pipe parted 1' into 11th joint
leaving 40 joints in well.Top of cement at 2985m MD, top of tubing at 2790m MD. 10 joints recovered were not reusable and
junked.

13:00 13:30 Rigged down 2 7/8" tubing equipment


13:30 15:00 Slipped and cut drilling line and prepared new mule shoe
15:00 18:30 Made up new mule shoe and ran in hole with 324m of 4" drill pipe. Installed BOT back off sub, checked back off torque,
re-torqued and continued in hole with 4" drill pipe to plug setting depth at 2202m MD
18:30 21:00 Circulated B/ups. R/up BJ, tested lines and performed open hole cement job. Place 14 ppg gas tight slurry from 2208m MD to
2063m MD POOH to 2063m MD
21:00 00:00 Cirulated B/up.Cement returns to surface casing valve plugged , R/up and back flushed casing valve to clear obstruction,
Flushed BOP stack with seawater thru casing valve, R/up BJ, tested lines and performed open hole cement job. Place 14 ppg
gas tight slurry from 2063m MD to 1918m MD POOH to 1918m MD

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)
WBM (Modified Polymer) 10.30 24,000
Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)
54 14.0 18.000
Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 3/2/2008
Rig : Vicksburg
Depth End (mKB): 3,749.00 TVD End (mKB): 3,508.61

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
3/2/2008 00:00 3/3/2008 00:00
Daily Cost Total Cum Cost To Date
739,703.80 6,219,616.57
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
10.35 16.71
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 01:00 Broke circulation. R/up BJ, tested lines and performed open hole cement job. Place 14 ppg gas tight slurry from 2063m MD to
1918m MD POOH to 1918m MD.
01:00 02:00 Broke circulation. R/up BJ, tested lines and performed open hole cement job. Place 14 ppg gas tight slurry from 1918m MD to
1773m MD POOH to 1773m MD.
02:00 03:00 Broke circulation. R/up BJ, tested lines and performed open hole cement job. Place 14 ppg gas tight slurry from 1773m MD to
1628m MD POOH to 1628m MD.
03:00 04:00 Broke circulation. R/up BJ, tested lines and performed open hole cement job. Place 14 ppg gas tight slurry from 1628m MD to
1512m MD POOH to 1454m MD
04:00 04:30 Circulate B/UP.
04:30 10:00 Rigged up and pulled out of hole laying down 150 jts of 4" drill pipe.
10:00 14:00 Made up and ran in hole with EZSV and set it at 1389m MD. Unstung and tested retainer to 2500 psi with BJC. Good test.
Stung into retainer and performed injection tests.
1 bpm 890 psi, 2 bpm 930 psi, 3 bpm 970 psi, 4 bpm 1059 psi, static at 680 psi
Unstung from retainer and pumped cement to within 2 bbls of retainer. Stung back into retainer and squeezed 20 bbls of
15.9 ppg cement below retainer. Unstung and placed 10 bbls of cement on top of retainer.

14:00 15:00 Pulled out of hole 5 stands and circulated string clean.
15:00 19:00 Continued to pull out of hole laying out 43 stands of 4" drill pipe. Pressure tested 7" x 9 5/8" annulus while pulling out of hole.
Pumping away at 400 psi.
19:00 21:00 Made up 7" casing cutting assembly and ran in hole to cutting depth at 280m MD. Cut casing and confirmed cut by pumping
through casing annulus. Pulled out of hole and laid down cutting assembly
21:00 00:00 Pulled wear bushing and jetted well head clean. Picked up landing joint and pulled and laid out 12 joints of 7" casing.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 3/3/2008
Rig : Vicksburg
Depth End (mKB): 3,749.00 TVD End (mKB): 3,508.61

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
3/3/2008 00:00 3/4/2008 00:00
Daily Cost Total Cum Cost To Date
-82,937.85 6,136,678.73
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
11.35 17.71
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 02:30 Held jsa, Continue to POH and l/down 7" casing. total jts l/d =21 full jts & 5.79m cut piece.
02:30 04:30 Made up and ran in hole with EZSV and set it at 275m MD. Unstung and tested retainer to 1000 psi with BJC. Good test.
Stung into retainer and performed injection tests.
1 bpm 230 psi, 2 bpm 270 psi, 3 bpm 320 psi, 4 bpm 380 psi, static at 320 psi
squeezed 20 bbls of 15.9 ppg cement below retainer. Unstung and placed 10 bbls of cement on top of retainer.Pulled out of
hole 3 stands and circulated string clean.

04:30 05:00 POH laying down 6 stands of drill pipe and l/down stinger.
05:00 07:00 Nippled sown BOP's and removed 2" side outlet valves
07:00 08:00 Made up 9 5/8" casing cutter and ran in hole and cut casing 5m below mud line at 117m Pulled out of hole and laid down
cutter.
08:00 09:30 Picked up running tool and engaged well head and recovered to rig floor. Laid down well head and laid down 8 joints of 9 5/8"
casing and 2.59m offcut.
09:30 13:30 Laid out remaining 32 stands of 4" drill pipe, 24 joints of 4" HWDP and 6 1/8" BHA.
13:30 15:00 Prepare to move. Remove cuttings drier to deck. Move temporary accomocdation to standby site. Tie down loads.
15:00 15:30 Abandon drill, head count in 7 minutes
15:30 16:30 Standup for safety
16:30 20:30 Held jsa, Cantilever rig in and remove icon tensioner, Raise and secure tensioner deck.Pin and secure drilling package to
stow position. Continue to secure rig and decks for tow.
20:30 23:30 Held jsa, Jackdown to 20' airgap, connect M/V Premaraj tide to tow bridle @ 2120 hrs, Jackdown to 9' draft & connect M/V
Heritage service to stbd qtr @ 2215 while removing leg loop from bow and checking water tight integrity.
23:30 00:00 Begin jetting, port leg free @ 2400 hrs. Rigup to jet bow leg.
Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Drilling Morning Report

Well Name : CV-5X


Date: 3/4/2008
Rig : Vicksburg
Depth End (mKB): 3,749.00 TVD End (mKB): 3,508.61

Total AFE Amount Target Depth (mKB) Target TVD (mKB)


4,654,908.37 3,577.00 3,355.00
Daily Operations
Report Start Date Report End Date
3/4/2008 00:00 3/4/2008 03:00
Daily Cost Total Cum Cost To Date
39,419.55 6,176,098.28
Cum Time Log Days From Spud (days) Cum Time Log Days (days)
11.48 17.83
Ops Supervisors
Wellsite Personnel
Leo Mclean
Randy Ryals
Time Log
Start Time End Time Comment
00:00 02:00 Bow leg free @ 0045 hrs, Rigup on stbd leg.
Stbd leg free @ 0210 hrs.
02:00 03:00 Up with legs and Off location from CV-5X and underway to B-VD-2X @ 0245 hrs.

"Final Report "

Mud Checks
Mud / Brine Type Mud Density (lb/gal) pH Water Phase Chlorides (ppm)

Funnel Viscosity (s/qt) PV Calc (cp) YP Calc (lbf/100ft²) HTHP Filtrate (mL/30min)

Drilling Parameters
Depth Start (mKB) TVD Start (mKB) Depth End (mKB) TVD End (mKB) IADC Drilling Time (hrs) Interval ROP (m/hr)

Survey Data
Date MD (mKB) Incl (°) Azm (°) TVD (mKB) VS (m) NS (m) EW (m) DLS (°/30m)

Casing
Casing Description OD (in) Set Depth (mKB) Run Date
Surface 9 5/8 310.25 2/21/2008
Intermediate 7 1,419.46 2/22/2008

Page 1/1 Report Printed : 4/10/2008


Bit Record

Page 29
BHA Summary
WellView
Well Name: CV-5X
Job Type: Drilling - Original
API/UWI Surface Legal Location Well Configuration Type Ground Elevation (mKB) KB-Casing Flange Distance (m) KB-Tubing Head Distance (m) Total Depth (mKB)
CV-5X Deviated 3,749.00

Bits
Bit BHA Drill Time BHA ROP
Run No. Drill String Name BHA Drill Bit Bit Dull Depth In (mKB) Depth Out (mKB) Drilled (m) (hrs) (m/hr)
1 1 Casing drill BBL Shoe, 9 5/8" float collar, 9 5/8" 40ppf casing, 9 5/8" float collar, 9 12in, BBL Shoe, 16687038 ------- 112.40 310.25 197.85 2.50 79.1
5/8" 40ppf casing
2 2 Motor Build Hycalog HCM 604, 7" sperry Drill Lobe 7/8 - 7.5 Stg, 6 3/4" Float sub, 8 1/2in, HCM 604, 1-1-WT-G-X-0-NO-TD 310.25 1,422.00 1,111.75 11.50 96.7
Non Mag MWD Hang off collar, 6 3/4" Non Mag Screen sun, XO Sub, 7210910
24 HWDP
3 3 Rotary AGS Hycalog DSR516M, 6 1/8" Modular NB Stabilizer, 1ft Extension sub, 6 1/8in, DSR516M, 120627 4-8-WT-GN-X-4-ER-PR 1,422.00 3,197.00 1,775.00 42.50 41.8
Adjustable Gauge stabilizer, 5" Non Mag hang off collar, 6" Integral
blade stabilizer w/ screen, Cross over sub, 24 X 4" HWDP
4 4 Rotary AGS DBS FMH3543ZR, 6 1/8" Modular NB Stabilizer, 1ft Extension sub, 6 1/8in, FMH3543ZR, 1-8-RO-T-X-1-CT-TD 3,197.00 3,749.00 552.00 23.00 24.0
Adjustable Gauge stabilizer, 5" Non Mag hang off collar, 6" Integral 11080326
blade stabilizer w/ screen, Cross over sub, 24 X 4" HWDP

www.peloton.com Page 1/1 Report Printed: 4/10/2008


Casing and Cementing Summary

Page 31
WellView Casing Summary

Well Name: CV-5X


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

<Casing Description?>, <Set Depth?>mKB


Set Depth (mKB) Set Tension (kips) String Nominal OD (in) String Minimum Drift (in) Centralizers Scratchers

P (collapse)
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Top Thread Top (mKB) Btm (mKB) Len (m) Burst Pres (psi) (psi)

Surface, 310.25mKB
Set Depth (mKB) Set Tension (kips) String Nominal OD (in) String Minimum Drift (in) Centralizers Scratchers
310.25 9 5/8
P (collapse)
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Top Thread Top (mKB) Btm (mKB) Len (m) Burst Pres (psi) (psi)
1 Top of Wellhead to 0.00 15.07 15.07
Rig Floor
1 KOP Wellhead 15.07 18.20 3.13
Assembly
22 9.625" 40# N-80 BTC 9 5/8 8.835 40.00 N-80 BTC 18.20 284.14 265.94
CSG.
1 FLOAT COLLAR 9 9 5/8 8.835 40.00 N-80 BTC 284.14 296.89 12.75
5/8" GRADE 40ppf
1 CASING SHOE 9 5/8" 9 5/8 8.835 40.00 N-80 BTC 296.89 310.25 13.36
GRADE 40ppf

Intermediate, 1,419.46mKB
Set Depth (mKB) Set Tension (kips) String Nominal OD (in) String Minimum Drift (in) Centralizers Scratchers
1,419.46 7
P (collapse)
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Top Thread Top (mKB) Btm (mKB) Len (m) Burst Pres (psi) (psi)
1 RKB to HGR 7 6.276 26.00 L-80 0.00 15.60 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 15.60 17.95 2.35
114 7" 23 ppf BTC casing 7 6.366 23.00 N-80 BTC 17.95 1,394.59 1,376.64
N-80
1 Weatherford Float 7 6.366 23.00 N-80 BTC 1,394.59 1,406.88 12.29
Assy
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 1,406.88 1,419.46 12.58

www.peloton.com Page 1/1 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
<Description?>, <Type?>, <Start Date?>
Cementing Start Date Cementing End Date Wellbore
Original Hole
Evaluation Method Cement Evaluation Results

Comment

Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 1/1 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Surface Casing Cement


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Surface Casing Cement, casing, 2/21/2008 18:22
Cementing Start Date Cementing End Date Wellbore
2/21/2008 2/21/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
9-5/8" Casing Cement Job Details¿ planned to mix 395 cuft (269 sxs) of class G (+40% S8C) cement with 6.890 gps seawater + 0.050 gps FP-9LS +
2.000 gps A-7 for 7.050 gps or 45.1 bbls of mixed fluid. Slurry weight was 15.5 ppg and the yield was 1.620 cuft/sx. Total calculated slurry volume = 77.5
bbls. Pumped 0 bbls seawater to break circulation. BJ tested lines to 2,000 psig. Mixed and pumped 78.0 bbls of slurry at 6.5 bpm and 350 psi.
Displaced with 68.2 bbls seawater (planned displacement was 68.2 bbls) at 7.0 bpm and 545 psi. Did not drop plug. No wiper plug used in 9-5/8" section.
Bled back and float held. Cement in place at 18:50 hours. Estimated top of cement at seabed. Total of 4 BBL weld on centralizers run.

1, 112.50-310.00mKB
Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
112.50 310.00 No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)
7 7 7 545.0 0.0
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No 0.00 0 No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Surface Casing Cement


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Cement
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Cement Cement from lot #39488 269 Class G + 78.0
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
112.50 310.00 100.0 1.62 6.89
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
15.50
Cement Fluid Additives
Add Type Conc
A-7 Accelerator or Retarder 2.0
FP-9LS Defoamer 0.05
Seawater
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Seawater Sea Water 68.2
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
8.60
Cement Fluid Additives
Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Intermediate Casing String


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Intermediate Casing String, casing, 2/23/2008 02:30
Cementing Start Date Cementing End Date Wellbore
2/23/2008 2/23/2008 Original Hole
Evaluation Method Cement Evaluation Results
Cement Bond Log
Comment
7" Casing Cement Job Details¿ For tail slurry, planned to mix 682 cuft (495 sxs) of class G (+40% S8C) cement with 5.800 gps seawater + 0.000 gps +
0.050 gps FP-9L + 0.200 gps BJ Ultra + 0.300 gps CD-33L for 6.350 gps or 74.9 bbls of mixed fluid. Tail slurry weight was 15.9 ppg and the yield was
1.530 cuft/sx. Total calculated slurry volume (lead + tail) = 0.0 + 135.0 = 135.0 bbls. Pumped 1 bbls seawater preflush. BJ tested lines to 3,500 psig.
Mixed and pumped 135.0 bbls of 15.9 ppg tail slurry at 6.5 bpm and 460 psi. Actual slurry volume (lead + tail) = 135.0 bbls. Dropped wiper plug.
Displaced with 181.9 bbls seawater (planned displacement was 181.9 bbls) at 7.0 bpm and a final pressure of 2,500 psi. Bumped plug with 2,500 psi.
Bled back and float held. Cement in place at 3:57 hours. Estimated top of cement at 3,281' MD. Total of 25 Spirolizer centralizers run.

1, 1,000.00-1,419.00mKB
Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
1,000.00 1,419.00 Yes 0.0 Yes No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)
6 8 7 2,500.0 0.0
Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No 0.00 0 No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Intermediate Casing String


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Sea Water
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Sea Water 1.0
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
8.60
Cement Fluid Additives
Add Type Conc

Tail
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Tail Cement from lot #VN 495 Class G + 135.0
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)
3,281.00 4,657.00 0.0 1.53 5.80
Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
15.90
Cement Fluid Additives
Add Type Conc
FP-9L Defoamer 0.05
CD-33L Extender 0.3
BJ Ultra Gas Control Additive/Bonding Agent 0.2
Seawater
Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)
Seawater 181.9
Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)
8.60
Cement Fluid Additives
Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug # 1 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Cement Plug # 1 Openhole, plug, 3/1/2008 04:00
Cementing Start Date Cementing End Date Wellbore
3/1/2008 3/1/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
Rig up lines at 04:15.
Pressure test lines to 2500 psi at 04:22. Pump 10 Bbls 10.8 ppg MCS-O SpacerMix ahead. Mix & Pump 55.0 bbls 14.0 ppg cement with 0. 80 gps BJUltra,
0.50 gps CD-33L, 0.04 gps R-21LS, 0.05 gps FP-9L, yield=2.08 ft3/sx, total mix fluid=10.51 gps. Displace cement with 3 Bbls 10.8 ppg MCS-O SpacerMix
behind followed by 92.2 bbls 10.3 ppg WBM. Pipe on vacuum. CIP= 05:10

Rig up lines at 04:15.


Pressure test lines to 2500 psi at 04:22. Pump 10 Bbls 10.8 ppg MCS-O SpacerMix ahead. Mix & Pump 55.0 bbls 14.0 ppg cement with 0. 80 gps BJUltra,
0.50 gps CD-33L, 0.04 gps R-21LS, 0.05 gps FP-9L, yield=2.08 ft3/sx, total mix fluid=10.51 gps. Displace cement with 3 Bbls 10.8 ppg MCS-O SpacerMix
behind followed by 92.2 bbls 10.3 ppg WBM. Pipe on vacuum. CIP= 05:10

While pulling back to 2940m MD pipe became stuck at 3166m MD. Attempted to work free. Pipe came free at 430 k weight indicator.Continued to pull out
of hole to 2940m.

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug # 1 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #2 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Cement Plug #2 Openhole, plug, 3/1/2008 16:00
Cementing Start Date Cementing End Date Wellbore
3/1/2008 3/1/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
Rig up lines at 20:00.
Pressure tested lines to 2500 psi at 20:07. Pump 10 Bbls 10.8 ppg MCS-O Spacer Mix ahead. Mix & Pump 17.4 bbls 14.0 ppg cement with 0. 80 gps BJ
Ultra, 0.50 gps CD-33L, 0.04 gps R-21LS, 0.05 gps FP-9L, yield=2.08 ft3/sx, total mix fluid=10.51 gps. Displace cement with 4.8 Bbls 10.8 ppg MCS-O
Spacer Mix behind followed by 65 bbls 10.3 ppg WBM. Pipe on vacuums. CIP= 20:51

Pull 5 stands and circulate clean.

Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #2 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #3 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Cement Plug #3 Openhole, plug, 3/2/2008 00:00
Cementing Start Date Cementing End Date Wellbore
3/2/2008 3/2/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
Rig up lines at 23:38.
Pressure tested lines to 2500 psi at 23:54. Mix & Pump 17.4 bbls 14.0 ppg cement with 0. 80 gps BJ Ultra, 0.50 gps CD-33L, 0.04 gps R-21LS, 0.05 gps
FP-9L, yield=2.08 ft3/sx, total mix fluid=10.51 gps. Displace cement 65 bbls with 10.3 ppg WBM. Pipe on vacuums. CIP= 00:18

Pull 5 stands and circulate clean.

Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #3 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #4 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Cement Plug #4 Openhole, plug, 3/2/2008 01:00
Cementing Start Date Cementing End Date Wellbore
3/2/2008 3/2/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
Rig up lines at 01:10
Pressure tested lines to 2500 psi at 01:20. Mix & Pump 17.8 bbls 14.0 ppg cement with
0. 80 gps BJ Ultra, 0.50 gps CD-33L, 0.04 gps R-21LS, 0.05 gps FP-9L, yield=2.08 ft3/sx, total mix fluid=10.51 gps. Displace cement 59.9 bbls with 10.3
ppg WBM. Pipe on vacuums. CIP= 01:42

Pull 5 stands and circulate clean.

Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #4 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #5 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Cement Plug #5 Openhole, plug, 3/2/2008 02:00
Cementing Start Date Cementing End Date Wellbore
3/2/2008 3/2/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
Rig up lines at 02:10
Pressure tested lines to 2500 psi at 02:14. Mix & Pump 17 bbls 14.0 ppg cement with
0. 80 gps BJ Ultra, 0.50 gps CD-33L, 0.04 gps R-21LS, 0.05 gps FP-9L, yield=2.08 ft3/sx, total mix fluid=10.51 gps. Displace cement 55 bbls with 10.3 ppg
WBM. Pipe on vacuums. CIP= 02:37

Pull 5 stands and circulate clean.

Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #5 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #6 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Cement Plug #6 Openhole, plug, 3/2/2008 03:00
Cementing Start Date Cementing End Date Wellbore
3/2/2008 3/2/2008 Original Hole
Evaluation Method Cement Evaluation Results

Comment
Rig up lines at 03:05.
Pressure tested lines to 2500 psi at 03:14. Pump 10 Bbls 10.8 ppg MCS-O Spacer Mix ahead. Mix & Pump 14.2 bbls 14.0 ppg cement with 0. 80 gps BJ
Ultra, 0.50 gps CD-33L, 0.04 gps R-21LS, 0.05 gps FP-9L, yield=2.08 ft3/sx, total mix fluid=10.51 gps. Displace cement with 4.8 Bbls 10.8 ppg MCS-O
Spacer Mix behind followed by 46 bbls 10.3 ppg WBM. Pipe on vacuums. CIP= 03:41

Pull 6 stands and circulate clean.

Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Plug #6 Openhole


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Squeeze


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Original Hole
Wellbore Name Profile Type Kick Off Depth (mKB) Vertical Section Direction (°)
Original Hole Directional 1,066.80 285.00
Section Size (in) Act Top (mKB) Act Btm (mKB)
Surface 12 1/4 112.40 310.00
Intermediate 8 1/2 310.00 1,421.89
Production 6 1/8 1,421.89 3,749.00

Type Install Date

Description Make Model WP (psi) Service SN

<Casing Description?>, <Set Depth?>mKB


Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)

Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)

Surface, 310.25mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Surface Original Hole 2/21/2008 310.25 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 Top of Wellhead to Rig Floor 15.07 0.00 15.07
1 KOP Wellhead Assembly 3.13 15.07 18.20
22 9.625" 40# N-80 BTC CSG. 9 5/8 8.835 40.00 N-80 BTC 265.94 18.20 284.14
1 FLOAT COLLAR 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 12.75 284.14 296.89
40ppf
1 CASING SHOE 9 5/8" GRADE 9 5/8 8.835 40.00 N-80 BTC 13.36 296.89 310.25
40ppf
Intermediate, 1,419.46mKB
Casing Description Wellbore Run Date Set Depth (mKB) Stick Up (mKB) Set Tension (kips)
Intermediate Original Hole 2/22/2008 1,419.46 0.00
Centralizers Scratchers

Top Conn
Jts Item Description OD (in) ID (in) Wt (lbs/ft) Grade Sz (in) Top Thread Len (m) Top (mKB) Btm (mKB)
1 RKB to HGR 7 6.276 26.00 L-80 15.60 0.00 15.60
1 Hanger assembly 7 6.276 26.00 L-80 BTC 2.35 15.60 17.95
114 7" 23 ppf BTC casing N-80 7 6.366 23.00 N-80 BTC 1,376.64 17.95 1,394.59
1 Weatherford Float Assy 7 6.366 23.00 N-80 BTC 12.29 1,394.59 1,406.88
1 Weatherford Shoe 7 6.366 23.00 N-80 BTC 12.58 1,406.88 1,419.46
Cement Squeeze, squeeze, 3/2/2008 18:00
Cementing Start Date Cementing End Date Wellbore
3/2/2008 3/2/2008 Original Hole
Evaluation Method Cement Evaluation Results
Cement Bond Log
Comment
Set 7" EZSV Cement Retainer at 13:00.
Pressure test lines to 2500 psi at 13:24. Pump injection test at 13:27, 1 BPM=890psi, 2 BPM=930psi, 3 BPM=970 psi, 4 BPM=1059 psi, Static = 686 psi.
Sting out of retainer at 13:30, Mix and pump 30 bbls 15.9 ppg cement with 0. 2 gps BJUltra, 0.3 gps CD-33L, 0.05 gps FP-9L, yield=1.53 ft3/sx, total mix
fluid=6.35 gps. Displace cement to stinger with 19.4 bbls 10.3 ppg WBM. Sting into retainer at 13:46, squeeze 20 bbls 10.3 ppg WBM to place 20 bbls
cement below retainer. Sting out of retainer at 13:53 pump 3 bbls 10.3ppg WBM to balance 10 bbls cement on top of retainer. CIP= 13:54

Pull 5 stands and circulate clean.

<Stg No.?>, 1,389.00-1,226.00mKB


Top (mKB) Bottom (mKB) Full Return? Cmnt Rtrn (bbl) Top Plug? Bottom Plug?
1,389.00 1,226.00 No No No
Initial Pump Rate (bbl/min) Final Pump Rate (bbl/min) Average Pump Rate (bbl/min) Final Pump Pressure (psi) Plug Bump Pressure (psi)

Pipe Reciprocated? Reciprocation Stroke Length (m) Reciprocation Rate (spm) Pipe Rotated? Pipe RPM (rpm)
No No
Depth tagged (mKB) Tag Method Depth Plug Drilled Out To (mKB) Drill Out Diameter (in) Drill Out Date

www.peloton.com Page 1/2 Report Printed: 4/10/2008


WellView Cement Summary

Well Name: CV-5X Cement Squeeze


API/UWI Surface Legal Location Field Name License No./Property Code State/Province Well Configuration Type
CV-5X Ca Voi Deviated
Ground Elevation (mKB) Casing Flange Elevation (m) KB-Ground Distance (m) KB-Casing Flange Distance (m) Spud Date Rig Release Date
2/21/2008 3:30:00 PM 3/4/2008 3:00:00 AM

Fluid Type Fluid Description Amount (sacks) Class Volume Pumped (bbl)

Estimated Top (mKB) Estimated Bottom (mKB) Percent Excess Pumped (%) Yield (ft³/sack) Mix H20 Ratio (gal/sack)

Free Water (%) Density (lb/gal) Plastic Viscosity (cp) Thickening Time (hrs) 1st Compressive Strength (psi)

Cement Fluid Additives


Add Type Conc

www.peloton.com Page 2/2 Report Printed: 4/10/2008


Directional Drilling/ Surveys

Page 52
Field: EXPLORATION WELL
Site: CV-5X
Well: CV-5X
Wellpath: CV-5X

0
0° 600

9 5/8" Csg Actual

700
400

10°° 9 5/8" Csg Actual


A (Seis Tg1) 20
True Vertical Depth [700m/in]

South(-)/North(+) [200m/in]
1400 7" Csg Actual 7" Csg Actual
200

B (Seis Tg2)

2100
0
D (Seis Tg4)

C (Seis Tg3)

Well TD @ 3720 mMD/ 2974 mTVD


2800
-200 A (Seis Tg1)
B (Seis Tg2)
C (Seis Tg3)

3500
D (Seis Tg4)
-400
Well TD @ 3720 mMD/ 2974 mTVD

-700 0 700
-1000 -800 -600 -400 -200 0 200
Vertical Section at 285.00° [700m/in] West(-)/East(+) [200m/in]

MD Inc. AZI TVD KEY

BLUE --- PLAN


7" Csg Actual Plan 4012.70 39.00 259.00 3468.00
RED --- ACTUAL WELLBORE
7" Csg Actual Survey 3976.38 37.70 259.70 3432.50 GREEN --- PROJECTED STRAIGHT LINE
Halliburton Company
Survey Report
Company: CHEVRON VIETNAM Date: 28/03/2008 Time: 13:27:06 Page: 1
Field: EXPLORATION WELL Co-ordinate(NE) Reference: Site: CV-5X, Grid North
Site: CV-5X Vertical (TVD) Reference: RKB CV-5X 34.4
Well: CV-5X Section (VS) Reference: Site (0.00N,0.00E,285.00Azi)
Wellpath: CV-5X Survey Calculation Method: Minimum Curvature Db: Sybase
Field: EXPLORATION WELL

VIETNAM
Map System: Universal Transverse Mercator Map Zone: UTM Zone 48, North 102E to 108E
Geo Datum: INDIAN75 (Everest 1830) Coordinate System: Site Centre
Sys Datum: Mean Sea Level Geomagnetic Model: bggm2007

Site: CV-5X

VIETNAM
Site Position: Northing: 933876.30 m Latitude: 8 26 31.488 N
From: Map Easting: 241377.80 m Longitude: 102 39 3.075 E
Position Uncertainty: 0.00 m North Reference: Grid
Water Depth: 76.20 m Grid Convergence: -0.35 deg

Well: CV-5X Slot Name:


moved from 933876.30mN/241377.80mE
Well Position: +N/-S 1.47 m Northing: 933877.77 m Latitude: 8 26 31.537 N
+E/-W 7.08 m Easting : 241384.88 m Longitude: 102 39 3.306 E
Position Uncertainty: 0.00 m

Wellpath: CV-5X Drilled From: Surface


Tie-on Depth: 0.00 m
Current Datum: RKB CV-5X Height 34.44 m Above System Datum: Mean Sea Level
Magnetic Data: 07/12/2007 Declination: -0.16 deg
Field Strength: 41403 nT Mag Dip Angle: 1.22 deg
Vertical Section: Depth From (TVD) +N/-S +E/-W Direction
m m m deg
0.00 0.00 0.00 285.00

Survey Program for Definitive Wellpath


Date: 21/03/2008 Validated: No Version: 2
Actual From To Survey Toolcode Tool Name
m m
112.40 1388.00 CV-5X 8-1/2" MWD (112.40-138 MWD+SCC MWD + Short Collar correction
1405.00 3749.00 CV-5X 6-1/8" MWD (1405.00-3749 MWD+SCC MWD + Short Collar correction

Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
0.00 0.00 0.00 0.00 1.47 7.08 -6.46 0.000 0.000 0.000 TIE LINE
112.40 0.00 0.00 112.40 1.47 7.08 -6.46 0.000 0.000 0.000 MWD+SCC
310.61 6.01 218.50 310.25 -6.65 0.62 -2.32 0.909 0.909 0.000 9 5/8" Csg Actual
317.00 6.20 218.50 316.60 -7.18 0.20 -2.05 0.909 0.909 0.000 MWD+SCC
346.00 6.30 218.30 345.43 -9.66 -1.77 -0.79 0.106 0.103 -0.207 MWD+SCC

375.00 7.90 224.70 374.21 -12.32 -4.15 0.82 1.844 1.655 6.621 MWD+SCC
403.00 5.60 228.70 402.01 -14.59 -6.53 2.53 2.514 -2.464 4.286 MWD+SCC
432.00 1.70 212.30 430.95 -15.89 -7.83 3.45 4.136 -4.034 -16.966 MWD+SCC
461.00 0.70 185.90 459.94 -16.43 -8.08 3.55 1.156 -1.034 -27.310 MWD+SCC
490.00 1.00 61.10 488.94 -16.49 -7.87 3.34 1.565 0.310 -129.103 MWD+SCC

519.00 2.50 35.80 517.92 -15.85 -7.28 2.93 1.709 1.552 -26.172 MWD+SCC
548.00 2.60 34.20 546.90 -14.79 -6.54 2.49 0.127 0.103 -1.655 MWD+SCC
577.00 2.50 40.20 575.87 -13.77 -5.76 2.00 0.295 -0.103 6.207 MWD+SCC
606.00 2.50 39.10 604.84 -12.79 -4.96 1.48 0.050 0.000 -1.138 MWD+SCC
635.00 2.30 37.00 633.81 -11.84 -4.21 1.00 0.226 -0.207 -2.172 MWD+SCC

693.00 2.20 36.10 691.77 -10.01 -2.85 0.16 0.055 -0.052 -0.466 MWD+SCC
722.00 2.20 35.40 720.75 -9.10 -2.20 -0.23 0.028 0.000 -0.724 MWD+SCC
751.00 2.00 30.70 749.73 -8.22 -1.62 -0.56 0.273 -0.207 -4.862 MWD+SCC
780.00 2.30 26.10 778.71 -7.26 -1.10 -0.81 0.358 0.310 -4.759 MWD+SCC
809.00 2.40 25.70 807.68 -6.19 -0.59 -1.04 0.105 0.103 -0.414 MWD+SCC

838.00 2.20 22.70 836.66 -5.13 -0.11 -1.22 0.241 -0.207 -3.103 MWD+SCC
867.00 2.70 37.50 865.63 -4.07 0.52 -1.56 0.830 0.517 15.310 MWD+SCC
896.00 2.60 37.70 894.60 -3.01 1.34 -2.07 0.104 -0.103 0.207 MWD+SCC
925.00 2.80 41.80 923.57 -1.96 2.22 -2.65 0.287 0.207 4.241 MWD+SCC
954.00 2.70 42.10 952.54 -0.93 3.15 -3.28 0.105 -0.103 0.310 MWD+SCC

983.00 2.60 41.40 981.51 0.07 4.04 -3.88 0.109 -0.103 -0.724 MWD+SCC
1012.00 2.20 45.30 1010.48 0.96 4.87 -4.46 0.447 -0.414 4.034 MWD+SCC
Halliburton Company
Survey Report
Company: CHEVRON VIETNAM Date: 28/03/2008 Time: 13:27:06 Page: 2
Field: EXPLORATION WELL Co-ordinate(NE) Reference: Site: CV-5X, Grid North
Site: CV-5X Vertical (TVD) Reference: RKB CV-5X 34.4
Well: CV-5X Section (VS) Reference: Site (0.00N,0.00E,285.00Azi)
Wellpath: CV-5X Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
1041.00 1.70 47.20 1039.46 1.64 5.58 -4.97 0.521 -0.517 1.966 MWD+SCC
1070.00 1.30 0.40 1068.45 2.26 5.90 -5.11 1.290 -0.414 -48.414 MWD+SCC
1099.00 2.20 314.40 1097.44 2.98 5.50 -4.54 1.654 0.931 -47.586 MWD+SCC

1128.00 2.60 316.30 1126.42 3.85 4.65 -3.50 0.422 0.414 1.966 MWD+SCC
1157.00 5.20 297.80 1155.35 4.94 3.03 -1.65 2.954 2.690 -19.138 MWD+SCC
1186.00 7.70 287.20 1184.16 6.12 0.01 1.57 2.854 2.586 -10.966 MWD+SCC
1215.00 11.10 291.10 1212.77 7.70 -4.45 6.29 3.576 3.517 4.034 MWD+SCC
1244.00 15.20 287.20 1241.00 9.83 -10.69 12.87 4.337 4.241 -4.034 MWD+SCC

1273.00 19.50 282.50 1268.68 12.01 -19.05 21.51 4.675 4.448 -4.862 MWD+SCC
1301.00 23.70 282.80 1294.71 14.27 -29.10 31.80 4.502 4.500 0.321 MWD+SCC
1330.00 28.00 284.80 1320.80 17.30 -41.37 44.44 4.538 4.448 2.069 MWD+SCC
1359.00 27.80 284.40 1346.43 20.72 -54.50 58.01 0.283 -0.207 -0.414 MWD+SCC
1388.00 27.80 283.70 1372.08 24.00 -67.62 71.53 0.338 0.000 -0.724 MWD+SCC

1405.00 26.60 283.00 1387.20 25.80 -75.18 79.30 2.192 -2.118 -1.235 MWD+SCC
1419.46 27.05 283.18 1400.11 27.27 -81.54 85.82 0.943 0.928 0.368 7" Csg Actual
1447.00 27.90 283.50 1424.54 30.21 -93.90 98.52 0.943 0.929 0.352 MWD+SCC
1476.00 27.80 283.40 1450.18 33.36 -107.08 112.06 0.114 -0.103 -0.103 MWD+SCC
1505.00 27.80 283.20 1475.83 36.47 -120.24 125.58 0.096 0.000 -0.207 MWD+SCC

1534.00 27.50 283.20 1501.52 39.54 -133.34 139.03 0.310 -0.310 0.000 MWD+SCC
1592.00 27.00 282.80 1553.08 45.52 -159.22 165.57 0.275 -0.259 -0.207 MWD+SCC
1621.00 26.90 282.80 1578.94 48.43 -172.04 178.71 0.103 -0.103 0.000 MWD+SCC
1650.00 26.60 282.60 1604.83 51.30 -184.77 191.75 0.324 -0.310 -0.207 MWD+SCC
1679.00 26.10 282.50 1630.82 54.09 -197.33 204.61 0.519 -0.517 -0.103 MWD+SCC

1708.00 25.60 282.30 1656.92 56.81 -209.68 217.24 0.525 -0.517 -0.207 MWD+SCC
1737.00 26.00 282.50 1683.03 59.52 -222.01 229.85 0.423 0.414 0.207 MWD+SCC
1766.00 26.30 282.60 1709.06 62.30 -234.49 242.62 0.314 0.310 0.103 MWD+SCC
1795.00 25.60 282.50 1735.13 65.06 -246.87 255.30 0.726 -0.724 -0.103 MWD+SCC
1824.00 26.20 282.60 1761.22 67.81 -259.24 267.95 0.622 0.621 0.103 MWD+SCC

1853.00 26.30 282.80 1787.23 70.63 -271.75 280.77 0.138 0.103 0.207 MWD+SCC
1882.00 26.50 283.00 1813.21 73.51 -284.32 293.66 0.226 0.207 0.207 MWD+SCC
1911.00 26.30 283.20 1839.18 76.43 -296.88 306.54 0.226 -0.207 0.207 MWD+SCC
1940.00 25.80 283.20 1865.23 79.34 -309.28 319.27 0.517 -0.517 0.000 MWD+SCC
1969.00 25.50 282.80 1891.38 82.16 -321.51 331.82 0.358 -0.310 -0.414 MWD+SCC

1998.00 25.80 283.00 1917.52 84.96 -333.74 344.36 0.323 0.310 0.207 MWD+SCC
2027.00 25.80 283.20 1943.63 87.82 -346.04 356.98 0.090 0.000 0.207 MWD+SCC
2056.00 25.20 283.20 1969.80 90.68 -358.19 369.46 0.621 -0.621 0.000 MWD+SCC
2085.00 25.40 283.20 1996.02 93.51 -370.26 381.84 0.207 0.207 0.000 MWD+SCC
2114.00 25.20 283.00 2022.24 96.31 -382.33 394.23 0.225 -0.207 -0.207 MWD+SCC

2143.00 25.80 283.00 2048.41 99.12 -394.49 406.71 0.621 0.621 0.000 MWD+SCC
2172.00 25.90 283.00 2074.51 101.97 -406.81 419.34 0.103 0.103 0.000 MWD+SCC
2201.00 25.40 283.00 2100.66 104.79 -419.05 431.89 0.517 -0.517 0.000 MWD+SCC
2230.00 25.60 283.20 2126.83 107.62 -431.21 444.37 0.225 0.207 0.207 MWD+SCC
2259.00 26.20 283.20 2152.92 110.51 -443.54 457.03 0.621 0.621 0.000 MWD+SCC

2288.00 26.10 283.20 2178.95 113.43 -455.98 469.80 0.103 -0.103 0.000 MWD+SCC
2317.00 26.20 282.60 2204.98 116.29 -468.44 482.57 0.292 0.103 -0.621 MWD+SCC
2346.00 25.90 282.50 2231.03 119.05 -480.87 495.30 0.314 -0.310 -0.103 MWD+SCC
2375.00 25.80 282.10 2257.13 121.75 -493.22 507.93 0.208 -0.103 -0.414 MWD+SCC
2404.00 26.60 282.30 2283.15 124.45 -505.74 520.72 0.833 0.828 0.207 MWD+SCC

2433.00 27.00 282.50 2309.04 127.26 -518.51 533.78 0.424 0.414 0.207 MWD+SCC
2462.00 26.70 282.50 2334.91 130.10 -531.30 546.86 0.310 -0.310 0.000 MWD+SCC
2491.00 26.50 282.10 2360.84 132.86 -543.98 559.83 0.278 -0.207 -0.414 MWD+SCC
2520.00 25.90 281.90 2386.86 135.52 -556.51 572.62 0.627 -0.621 -0.207 MWD+SCC
2549.00 25.50 282.10 2412.99 138.14 -568.81 585.18 0.423 -0.414 0.207 MWD+SCC

2578.00 25.40 281.80 2439.18 140.72 -581.00 597.62 0.169 -0.103 -0.310 MWD+SCC
2607.00 25.20 281.60 2465.40 143.23 -593.14 610.00 0.225 -0.207 -0.207 MWD+SCC
2636.00 25.70 281.80 2491.58 145.76 -605.34 622.44 0.525 0.517 0.207 MWD+SCC
2665.00 26.20 281.40 2517.66 148.31 -617.77 635.11 0.548 0.517 -0.414 MWD+SCC
2694.00 25.60 281.40 2543.75 150.81 -630.19 647.75 0.621 -0.621 0.000 MWD+SCC
Halliburton Company
Survey Report
Company: CHEVRON VIETNAM Date: 28/03/2008 Time: 13:27:06 Page: 3
Field: EXPLORATION WELL Co-ordinate(NE) Reference: Site: CV-5X, Grid North
Site: CV-5X Vertical (TVD) Reference: RKB CV-5X 34.4
Well: CV-5X Section (VS) Reference: Site (0.00N,0.00E,285.00Azi)
Wellpath: CV-5X Survey Calculation Method: Minimum Curvature Db: Sybase
Survey
MD Incl Azim TVD +N/-S +E/-W VS DLS Build Turn Tool/Comment
m deg deg m m m m deg/30m deg/30m deg/30m
2723.00 25.60 281.20 2569.90 153.27 -642.48 660.25 0.089 0.000 -0.207 MWD+SCC
2752.00 25.60 281.40 2596.05 155.72 -654.76 672.76 0.089 0.000 0.207 MWD+SCC
2781.00 25.30 281.20 2622.24 158.17 -666.98 685.19 0.323 -0.310 -0.207 MWD+SCC
2809.00 26.10 281.40 2647.47 160.55 -678.89 697.31 0.862 0.857 0.214 MWD+SCC
2838.00 26.50 281.10 2673.47 163.05 -691.49 710.13 0.436 0.414 -0.310 MWD+SCC

2867.00 26.20 280.70 2699.45 165.49 -704.13 722.97 0.361 -0.310 -0.414 MWD+SCC
2896.00 25.60 280.50 2725.54 167.82 -716.58 735.60 0.627 -0.621 -0.207 MWD+SCC
2925.00 25.30 280.40 2751.73 170.08 -728.84 748.02 0.314 -0.310 -0.103 MWD+SCC
2983.00 25.60 280.50 2804.10 174.60 -753.35 772.87 0.157 0.155 0.052 MWD+SCC
3012.00 26.00 280.50 2830.21 176.90 -765.76 785.45 0.414 0.414 0.000 MWD+SCC

3041.00 25.60 280.40 2856.32 179.19 -778.17 798.03 0.416 -0.414 -0.103 MWD+SCC
3070.00 25.60 280.20 2882.47 181.43 -790.50 810.52 0.089 0.000 -0.207 MWD+SCC
3099.00 25.00 279.60 2908.69 183.56 -802.71 822.87 0.675 -0.621 -0.621 MWD+SCC
3128.00 24.70 279.10 2935.00 185.54 -814.73 834.99 0.379 -0.310 -0.517 MWD+SCC
3157.00 23.40 278.20 2961.48 187.32 -826.42 846.74 1.397 -1.345 -0.931 MWD+SCC

3186.00 22.60 277.20 2988.18 188.84 -837.64 857.98 0.921 -0.828 -1.034 MWD+SCC
3215.00 23.10 276.80 3014.90 190.21 -848.82 869.13 0.542 0.517 -0.414 MWD+SCC
3244.00 22.60 276.70 3041.63 191.54 -860.00 880.27 0.519 -0.517 -0.103 MWD+SCC
3302.00 21.90 276.50 3095.31 194.06 -881.82 902.00 0.364 -0.362 -0.103 MWD+SCC
3331.00 21.90 275.90 3122.22 195.23 -892.57 912.69 0.232 0.000 -0.621 MWD+SCC

3389.00 23.70 275.20 3175.68 197.40 -914.94 934.86 0.942 0.931 -0.362 MWD+SCC
3418.00 24.90 275.60 3202.11 198.52 -926.82 946.62 1.253 1.241 0.414 MWD+SCC
3446.00 24.80 275.10 3227.52 199.62 -938.54 958.22 0.249 -0.107 -0.536 MWD+SCC
3475.00 24.30 274.50 3253.90 200.63 -950.55 970.08 0.578 -0.517 -0.621 MWD+SCC
3504.00 23.50 273.80 3280.41 201.48 -962.26 981.62 0.878 -0.828 -0.724 MWD+SCC

3562.00 22.10 273.50 3333.88 202.91 -984.69 1003.66 0.727 -0.724 -0.155 MWD+SCC
3591.00 21.40 272.60 3360.81 203.48 -995.42 1014.17 0.802 -0.724 -0.931 MWD+SCC
3620.00 21.10 272.10 3387.84 203.92 -1005.93 1024.43 0.363 -0.310 -0.517 MWD+SCC
3678.00 20.20 270.80 3442.12 204.44 -1026.37 1044.31 0.522 -0.466 -0.672 MWD+SCC
3707.00 19.70 270.10 3469.37 204.52 -1036.27 1053.89 0.573 -0.517 -0.724 MWD+SCC

3736.00 19.70 270.50 3496.68 204.57 -1046.04 1063.34 0.139 0.000 0.414 MWD+SCC
3749.00 19.70 270.50 3508.92 204.61 -1050.42 1067.59 0.000 0.000 0.000 MWD+SCC
3749.00 19.70 270.50 3508.92 204.61 -1050.42 1067.59 0.068 0.000 0.000 PROJECTED to TD

Casing Points
MD TVD Diameter Hole Size Name
m m in in
310.61 310.25 9.625 12.250 9 5/8" Csg Actual
1419.46 1400.11 7.000 8.500 7" Csg Actual
Client : Chevron Vietnam
Well Name : CV-5X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : TH-DD-0005691616 BHA# 2

BHA# 2 : Date In :22/02/2008 MD In (m) : 310 TVD In (m) : 310 Date Out: 22/02/2008 MD Out (m): 1422 TVD Out (m): 1402

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
1 8.500 Hughes HCM604 7210910 6x14 0.902 1-1-WT-GN-X-I-NO-TD

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs
7.000 SSDS SperryDrill 700021 0.00° 194 13.25

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 HCM604 PDC 7210910 8.500 2.500 8.500 176.66 P 4-1/2" Reg 0.34
2 7" SperryDrill Lobe 7/8 - 7.5 stg 700021 7.000 4.753 70.69 B 4-1/2" IF 8.66
3 6 3/4" Float Sub 10761264 6.750 2.813 100.77 B 4-1/2" IF 0.96
4 MWD Hang Off Collar 231801 6.750 2.813 101.00 B 4-1/2" IF 8.56
5 6 3/4" Non Mag Screen Sub STH0455 6.750 2.813 100.77 B 4-1/2" IF 1.92
6 4" XTF 39 B x 4 1/2 IF P(Chevron) Chevron 6.750 2.813 100.77 B XTF-39 0.56
7 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39 225.41
________
246.41

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 5 15 12 Drilling : 11.50 in Air (Total) : 28142
RPM (rpm) : 20 120 120 Reaming : 0.00 in Mud (Total) :
Flow (gpm) : 550 800 800 Circ-Other : 1.75 in Air (Bel Jars) : 0
SPP (psi) : 2600 3650 3273 Total : 13.25 in Mud (Bel Jars) :

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/100') Turn (°/100') DLS (°/100')
Inclination (deg) 5.99 27.13 Oriented : 261.00 35
Azimuth (deg) 218.50 283.21 Rotated : 851.00 116
Total : 1112.00 97 0.58 1.77 0.69

COMMENTS
Client : Chevron Vietnam
Well Name : CV-5X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : TH-DD-0005691616 BHA# 3

BHA# 3 : Date In :23/02/2008 MD In (m) : 1422 TVD In (m) : 1402 Date Out: 25/02/2008 MD Out (m): 3197 TVD Out (m): 2998

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
2 6.125 Reed Hycalog DSR516M 120627 5x11 0.464 4-8-WT-GN-X-4-ER-ROP

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 PDC DSR516M-C1 120627 6.125 2.500 6.125 83.69 P 3-1/2" Reg 0.21
2 6-1/8" Modular NB Stabilizer 10891415 4.750 2.250 6.125 46.84 B HT-38 0.75 0.58
3 1ft x 5" Extension sub 10715718 5.000 2.250 53.37 B HT-38 0.29
4 Adjustable Gauge Stabilizer 325058 5.000 2.250 5.625 53.37 B HT-38 3.20 2.85
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 6'' Integral Blade Stabilizer(w/screen) DOTS-17403 5.000 2.250 6.000 53.37 B 3-1/2" IF 1.23 14.62
7 Cross Over Sub S-56664-9 5.000 2.250 53.37 B XTF-39 0.64
8 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39 225.41
________
241.28

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 8 14 10 Drilling : 42.25 in Air (Total) : 24748
RPM (rpm) : 180 240 214 Reaming : 0.00 in Mud (Total) : 20938
Flow (gpm) : 260 304 288 Circ-Other : 2.25 in Air (Bel Jars) : 0
SPP (psi) : 2460 3390 2943 Total : 44.50 in Mud (Bel Jars) : 0

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/100') Turn (°/100') DLS (°/100')
Inclination (deg) 27.13 22.79 Oriented : 0.00 0
Azimuth (deg) 283.21 277.05 Rotated : 1775.00 42
Total : 1775.00 42 -0.07 -0.11 0.09

COMMENTS
The assembly worked well with 11 undergauge stand sets & 49 full gauge stand sets.
UG sets produced a strong overpowering response to FG.UG build response was about 4x the drop response of FG.
(The MNB & 6" St Stabs used were brand new).
The trajectory was maintained at +/- 25°-26° inclination however when the TD target became un-missable the inclination was allowed to degrade
to reduce the drilled depth. As usual as the bit began to wear LHW increased.
In conclusion
Further confirmation that a 5 blade bit ( whatever company) should be run over these longer 6 1/8" sections due to the generally more inherent
benign directional response.
Client : Chevron Vietnam
Well Name : CV-5X
Field :
Slot :
Rig : Vicksburg
BHA Report Job # : TH-DD-0005691616 BHA# 4

BHA# 4 : Date In :25/02/2008 MD In (m) : 3197 TVD In (m) : 2998 Date Cur: 02/03/2008 MD Cur (m): 3749 TVD Cur (m): 3509

BIT DATA
Bit # OD (in) MFR Style Serial# Nozzles (/32's) TFA (in²) Dull Condition
3 6.125 Security DBS FMH3543ZR 11080326 3x10, 2x12 0.451 1-8-RO-T -X-1-CT-TD

MOTOR DATA
Run # OD (in) MFR Model Serial# Bend Nzl (/32's) Avg Dif (psi) Cum Circ Hrs

COMPONENT DATA
Item Description Serial OD ID Gauge Weight Top Con Length Bit - Center
# # (in) (in) (in) (lbs/ft) (m) Blade (m)
1 PDC FMH3543ZR 11080326 6.125 2.000 6.125 89.71 P 3-1/2" Reg 0.21
2 6-1/8" Modular NB Stabilizer 10891415 4.750 2.250 6.125 46.84 B HT-38 0.75 0.59
3 1ft x 5" Extension sub 10715718 5.000 2.250 53.37 B HT-38 0.29
4 Adjustable Gauge Stabilizer 325058 5.000 2.250 5.625 53.37 B HT-38 3.20 2.85
5 5" Non-Mag Hang Off Collar 10961179 5.000 2.250 53.37 B 3-1/2" IF 9.55
6 6'' Integral Blade Stabilizer(w/screen) DOTS-17403 5.000 2.250 6.000 53.37 B 3-1/2" IF 1.23 14.62
7 Cross Over Sub S-56664-9 5.000 2.250 53.37 B XTF-39 0.64
8 24 x 4" HWDP 4.000 2.563 29.70 B XTF-39 225.41
________
241.29

Parameter Min Max Ave Activity Hrs BHA Weight (lb) Drill String OD(in) Len (m)
WOB (klbs) : 8 12 11 Drilling : 23.00 in Air (Total) : 24753
RPM (rpm) : 150 180 156 Reaming : 0.00 in Mud (Total) : 20943
Flow (gpm) : 250 260 257 Circ-Other : 2.50 in Air (Bel Jars) : 0
SPP (psi) : 2730 3170 2918 Total : 25.50 in Mud (Bel Jars) : 0

PERFORMANCE
In Out Distance (m) ROP (m/hr) Build (°/100') Turn (°/100') DLS (°/100')
Inclination (deg) 22.79 19.70 Oriented : 0.00 0
Azimuth (deg) 277.05 270.68 Rotated : 552.00 24
Total : 552.00 24 -0.17 -0.35 0.21

COMMENTS
Page : 1
Client : Chevron Vietnam Field :
Well Name : CV-5X Slot :
Rig : Vicksburg Job # : TH-DD-0005691616
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 285.00° (from 1.5N, 7.1E)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/100') (°/100') (°/100') (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)

0.00 0.00 0.00 0.0 0.0 1.5 7.1 0.00 0.00 0.00 1 Tieon
112.40 0.00 0.00 112.4 0.0 1.5 7.1 0.00 0.00 0.00 6 20 550 1
317.00 6.20 218.50 316.6 4.4 -7.2 0.2 0.92 0.92 0.00 10 120 800 2600 248 2
346.00 6.30 218.30 345.4 5.7 -9.7 -1.8 0.11 0.11 -0.21 10 120 800 2650 290 2
375.00 7.90 224.70 374.2 7.3 -12.3 -4.2 1.87 1.68 6.73 10 120 800 2700 158 2
403.00 5.60 228.70 402.0 9.0 -14.6 -6.5 2.55 -2.50 4.35 5 800 2700 390 403 170R 2
432.00 1.70 212.30 430.9 9.9 -15.9 -7.8 4.20 -4.10 -17.24 10 800 2700 403 407 170R 2
418 432 LS 2
461.00 0.70 185.90 459.9 10.0 -16.4 -8.1 1.17 -1.05 0.00 10 120 800 2750 432 438 LS 204 2
490.00 1.00 61.10 488.9 9.8 -16.5 -7.9 1.59 0.32 0.00 10 120 800 2850 477 483 55m 181 2
519.00 2.50 35.80 517.9 9.4 -15.9 -7.3 1.74 1.58 0.00 800 2990 506 512 35m 156 2
548.00 2.60 34.20 546.9 8.9 -14.8 -6.5 0.13 0.11 -1.68 10 120 800 2990 210 2
577.00 2.50 40.20 575.9 8.5 -13.8 -5.8 0.30 -0.11 6.31 10 120 800 2990 299 2
606.00 2.50 39.10 604.8 7.9 -12.8 -5.0 0.05 0.00 -1.16 10 120 800 3000 287 2
635.00 2.30 37.00 633.8 7.5 -11.8 -4.2 0.23 -0.21 -2.21 10 120 800 3050 299 2
693.00 2.20 36.10 691.8 6.6 -10.0 -2.9 0.06 -0.05 -0.47 15 120 800 3350 296 2
722.00 2.20 35.40 720.7 6.2 -9.1 -2.2 0.03 0.00 -0.74 15 120 800 3350 302 2
752.00 2.00 30.70 750.7 5.9 -8.2 -1.6 0.27 -0.20 -4.78 15 120 800 3400 284 2
780.00 2.30 26.10 778.7 5.6 -7.3 -1.1 0.38 0.33 -5.01 15 120 800 3400 191 2
809.00 2.40 25.70 807.7 5.4 -6.2 -0.6 0.11 0.11 -0.42 15 120 800 3400 219 2
838.00 2.20 22.70 836.7 5.2 -5.1 -0.1 0.25 -0.21 -3.15 15 120 800 3500 219 2
867.00 2.70 37.50 865.6 4.9 -4.1 0.5 0.84 0.53 15.56 15 120 800 3450 854 858 110m 100 2
896.00 2.60 37.70 894.6 4.4 -3.0 1.3 0.11 -0.11 0.21 15 120 800 3450 147 2
925.00 2.80 41.80 923.6 3.8 -2.0 2.2 0.29 0.21 4.31 15 120 800 3450 191 2
954.00 2.70 42.10 952.5 3.2 -0.9 3.1 0.11 -0.11 0.32 15 120 800 3450 218 2
983.00 2.60 41.40 981.5 2.6 0.1 4.0 0.11 -0.11 -0.74 15 120 800 3450 190 2
1012.00 2.20 45.30 1010.5 2.0 1.0 4.9 0.45 -0.42 4.10 15 120 800 3450 998 1001 255m 130 2
1041.00 1.70 47.20 1039.5 1.5 1.6 5.6 0.53 -0.53 2.00 15 120 800 3450 1027 1030 225m 110 2
1070.00 1.30 0.40 1068.5 1.3 2.3 5.9 1.31 -0.42 -49.19 5 800 3450 1067 1070 285m 79 2
1099.00 2.20 314.40 1097.4 1.9 3.0 5.5 1.68 0.95 -48.35 5 800 3450 1070 1077 285m 74 2
Page : 2
Client : Chevron Vietnam Field :
Well Name : CV-5X Slot :
Rig : Vicksburg Job # : TH-DD-0005691616
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 285.00° (from 1.5N, 7.1E)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/100') (°/100') (°/100') (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)
1096 1099 285m 2
1128.00 2.60 316.30 1126.4 3.0 3.8 4.7 0.43 0.42 2.00 15 120 800 3550 1099 1106 285m 131 2
1157.00 5.20 297.80 1155.3 4.8 4.9 3.0 3.00 2.73 -19.44 5 800 3550 1144 1157 285m 86 2
1186.00 7.70 287.20 1184.2 8.0 6.1 0.0 2.90 2.63 -11.14 5 800 3450 1157 1169 285m 49 2
1173 1186 25L 2
1215.00 11.10 291.10 1212.8 12.7 7.7 -4.4 3.63 3.57 4.10 5 800 3450 1186 1202 25L 70 2
1202 1215 20L 2
1244.00 15.20 287.20 1241.0 19.3 9.8 -10.7 4.41 4.31 -4.10 5 800 3450 1215 1231 20L 45 2
1231 1244 20L 2
1273.00 19.50 282.50 1268.7 28.0 12.0 -19.0 4.75 4.52 -4.94 5 800 3450 1244 1260 20L 45 2
1260 1273 20L 2
1301.00 23.70 282.80 1294.7 38.3 14.3 -29.1 4.57 4.57 0.33 5 800 3450 1273 1289 20L 31 2
1289 1301 10L 2
1330.00 28.00 284.80 1320.8 50.9 17.3 -41.4 4.61 4.52 2.10 15 120 800 3550 1301 1317 10L 49 2
1317 1330 15R 2
1359.00 27.80 284.40 1346.4 64.5 20.7 -54.5 0.29 -0.21 -0.42 15 120 800 3650 55 2
1388.00 27.80 283.70 1372.1 78.0 24.0 -67.6 0.34 0.00 -0.74 15 120 800 3650 64 2
1405.00 26.60 283.00 1387.2 85.8 25.8 -75.2 2.23 -2.15 -1.26 15 120 800 3650 57 2
1447.00 27.90 283.50 1424.5 105.0 30.2 -93.9 0.96 0.94 0.36 10 240 304 2840 61 3
1476.00 27.80 283.40 1450.2 118.5 33.4 -107.1 0.12 -0.11 -0.11 10 240 304 2840 49 3
1505.00 27.80 283.20 1475.8 132.0 36.5 -120.2 0.10 0.00 -0.21 10 240 304 2840 91 3
1534.00 27.50 283.20 1501.5 145.5 39.5 -133.3 0.32 -0.32 0.00 10 240 304 2840 66 3
1592.00 27.00 282.80 1553.1 172.0 45.5 -159.2 0.28 -0.26 -0.21 10 240 300 2940 76 3
1621.00 26.90 282.80 1578.9 185.2 48.4 -172.0 0.11 -0.11 0.00 10 240 300 2940 69 3
1650.00 26.60 282.60 1604.8 198.2 51.3 -184.8 0.33 -0.32 -0.21 10 240 300 2460 59 3
1679.00 26.10 282.50 1630.8 211.1 54.1 -197.3 0.53 -0.53 -0.11 10 240 300 2940 33 3
1708.00 25.60 282.30 1656.9 223.7 56.8 -209.7 0.53 -0.53 -0.21 10 240 300 2940 89 3
1737.00 26.00 282.50 1683.0 236.3 59.5 -222.0 0.43 0.42 0.21 10 240 300 2650 48 3
1766.00 26.30 282.60 1709.1 249.1 62.3 -234.5 0.32 0.32 0.11 10 240 300 2900 82 3
1795.00 25.60 282.50 1735.1 261.8 65.1 -246.9 0.74 -0.74 -0.11 10 240 300 2700 66 3
Page : 3
Client : Chevron Vietnam Field :
Well Name : CV-5X Slot :
Rig : Vicksburg Job # : TH-DD-0005691616
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 285.00° (from 1.5N, 7.1E)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/100') (°/100') (°/100') (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)
1824.00 26.20 282.60 1761.2 274.4 67.8 -259.2 0.63 0.63 0.11 10 240 300 2900 59 3
1853.00 26.30 282.80 1787.2 287.2 70.6 -271.7 0.14 0.11 0.21 10 240 300 2900 64 3
1882.00 26.50 283.00 1813.2 300.1 73.5 -284.3 0.23 0.21 0.21 10 240 300 2900 58 3
1911.00 26.30 283.20 1839.2 313.0 76.4 -296.9 0.23 -0.21 0.21 10 240 300 2650 59 3
1940.00 25.80 283.20 1865.2 325.7 79.3 -309.3 0.53 -0.53 0.00 10 240 300 2900 64 3
1969.00 25.50 282.80 1891.4 338.3 82.2 -321.5 0.36 -0.32 -0.42 10 240 300 2900 58 3
1998.00 25.80 283.00 1917.5 350.8 85.0 -333.7 0.33 0.32 0.21 10 240 300 2700 59 3
2027.00 25.80 283.20 1943.6 363.4 87.8 -346.0 0.09 0.00 0.21 10 240 300 2900 57 3
2056.00 25.20 283.20 1969.8 375.9 90.7 -358.2 0.63 -0.63 0.00 10 240 300 2900 58 3
2085.00 25.40 283.20 1996.0 388.3 93.5 -370.3 0.21 0.21 0.00 10 240 300 2680 56 3
2114.00 25.20 283.00 2022.2 400.7 96.3 -382.3 0.23 -0.21 -0.21 10 240 300 2900 51 3
2143.00 25.80 283.00 2048.4 413.2 99.1 -394.5 0.63 0.63 0.00 10 200 300 2680 50 3
2172.00 25.90 283.00 2074.5 425.8 102.0 -406.8 0.11 0.11 0.00 10 200 300 3040 55 3
2201.00 25.40 283.00 2100.7 438.3 104.8 -419.0 0.53 -0.53 0.00 10 200 300 3060 55 3
2230.00 25.60 283.20 2126.8 450.8 107.6 -431.2 0.23 0.21 0.21 10 200 300 2720 57 3
2259.00 26.20 283.20 2152.9 463.5 110.5 -443.5 0.63 0.63 0.00 10 200 283 2840 42 3
2288.00 26.10 283.20 2178.9 476.3 113.4 -456.0 0.11 -0.11 0.00 10 200 290 3080 47 3
2317.00 26.20 282.60 2205.0 489.0 116.3 -468.4 0.30 0.11 -0.63 10 200 299 3190 51 3
2346.00 25.90 282.50 2231.0 501.8 119.1 -480.9 0.32 -0.32 -0.11 10 200 304 3390 47 3
2375.00 25.80 282.10 2257.1 514.4 121.7 -493.2 0.21 -0.11 -0.42 10 200 299 3360 54 3
2404.00 26.60 282.30 2283.2 527.2 124.5 -505.7 0.85 0.84 0.21 10 200 299 3000 49 3
2433.00 27.00 282.50 2309.0 540.2 127.3 -518.5 0.43 0.42 0.21 10 200 296 3340 40 3
2462.00 26.70 282.50 2334.9 553.3 130.1 -531.3 0.32 -0.32 0.00 10 200 296 3300 43 3
2491.00 26.50 282.10 2360.8 566.3 132.9 -544.0 0.28 -0.21 -0.42 10 200 291 3270 40 3
2520.00 25.90 281.90 2386.9 579.1 135.5 -556.5 0.64 -0.63 -0.21 10 200 291 3280 42 3
2549.00 25.50 282.10 2413.0 591.6 138.1 -568.8 0.43 -0.42 0.21 10 200 291 3280 38 3
2578.00 25.40 281.80 2439.2 604.1 140.7 -581.0 0.17 -0.11 -0.32 10 200 280 2950 38 3
2607.00 25.20 281.60 2465.4 616.5 143.2 -593.1 0.23 -0.21 -0.21 10 200 280 2950 35 3
2636.00 25.70 281.80 2491.6 628.9 145.8 -605.3 0.53 0.53 0.21 10 200 270 2700 32 3
2665.00 26.20 281.40 2517.7 641.6 148.3 -617.8 0.56 0.53 -0.42 10 200 270 3000 44 3
Page : 4
Client : Chevron Vietnam Field :
Well Name : CV-5X Slot :
Rig : Vicksburg Job # : TH-DD-0005691616
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 285.00° (from 1.5N, 7.1E)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/100') (°/100') (°/100') (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)
2694.00 25.60 281.40 2543.7 654.2 150.8 -630.2 0.63 -0.63 0.00 10 200 270 3000 45 3
2723.00 25.60 281.20 2569.9 666.7 153.3 -642.5 0.09 0.00 -0.21 10 200 270 3000 37 3
2752.00 25.60 281.40 2596.1 679.2 155.7 -654.8 0.09 0.00 0.21 10 200 270 3000 30 3
2781.00 25.30 281.20 2622.2 691.6 158.2 -667.0 0.33 -0.32 -0.21 10 200 270 3000 29 3
2809.00 26.10 281.40 2647.5 703.8 160.5 -678.9 0.88 0.87 0.22 10 200 270 3000 35 3
2837.00 26.50 281.10 2672.6 716.1 163.0 -691.1 0.46 0.44 -0.33 10 200 270 2550 28 3
2867.00 26.20 280.70 2699.5 729.4 165.5 -704.1 0.35 -0.30 -0.41 10 200 270 3000 30 3
2896.00 25.60 280.50 2725.5 742.1 167.8 -716.6 0.64 -0.63 -0.21 10 200 270 3000 22 3
2925.00 25.30 280.40 2751.7 754.5 170.1 -728.8 0.32 -0.32 -0.11 10 200 270 3000 33 3
2983.00 25.60 280.50 2804.1 779.3 174.6 -753.3 0.16 0.16 0.05 10 200 270 3000 25 3
3012.00 26.00 280.50 2830.2 791.9 176.9 -765.8 0.42 0.42 0.00 10 200 270 3000 26 3
3041.00 25.60 280.40 2856.3 804.5 179.2 -778.2 0.42 -0.42 -0.11 10 200 270 3000 35 3
3070.00 25.60 280.20 2882.5 817.0 181.4 -790.5 0.09 0.00 -0.21 13 180 270 3000 30 3
3099.00 25.00 279.60 2908.7 829.3 183.6 -802.7 0.69 -0.63 -0.63 14 180 260 2990 33 3
3128.00 24.70 279.10 2935.0 841.4 185.5 -814.7 0.38 -0.32 -0.53 14 180 260 2990 28 3
3157.00 23.40 278.20 2961.5 853.2 187.3 -826.4 1.42 -1.37 -0.95 14 180 267 3220 14 3
3186.00 22.60 277.20 2988.2 864.4 188.8 -837.6 0.94 -0.84 -1.05 8 180 260 2730 35 3
3215.00 23.10 276.80 3014.9 875.6 190.2 -848.8 0.55 0.53 -0.42 8 180 260 3170 43 4
3244.00 22.60 276.70 3041.6 886.7 191.5 -860.0 0.53 -0.53 -0.11 10 180 260 2840 35 4
3302.00 21.90 276.50 3095.3 908.5 194.1 -881.8 0.37 -0.37 -0.11 10 180 260 3170 34 4
3331.00 21.90 275.90 3122.2 919.1 195.2 -892.6 0.24 0.00 -0.63 12 150 260 2740 34 4
3389.00 23.70 275.20 3175.7 941.3 197.4 -914.9 0.96 0.95 -0.37 12 150 260 2740 34 4
3418.00 24.90 275.60 3202.1 953.1 198.5 -926.8 1.27 1.26 0.42 12 150 260 2740 31 4
3446.00 24.80 275.10 3227.5 964.7 199.6 -938.5 0.25 -0.11 -0.54 12 150 260 3000 23 4
3475.00 24.30 274.50 3253.9 976.5 200.6 -950.5 0.59 -0.53 -0.63 12 150 260 3000 37 4
3504.00 23.50 273.80 3280.4 988.1 201.5 -962.3 0.89 -0.84 -0.74 12 150 260 3000 32 4
3562.00 22.10 273.50 3333.9 1010.1 202.9 -984.7 0.74 -0.74 -0.16 12 150 260 3000 27 4
3591.00 21.40 272.60 3360.8 1020.6 203.5 -995.4 0.81 -0.74 -0.95 12 150 260 3000 24 4
3620.00 21.10 272.10 3387.8 1030.9 203.9 -1005.9 0.37 -0.32 -0.53 12 150 250 2870 22 4
3678.00 20.20 270.80 3442.1 1050.8 204.4 -1026.4 0.53 -0.47 -0.68 12 150 250 2900 25 4
Page : 5
Client : Chevron Vietnam Field :
Well Name : CV-5X Slot :
Rig : Vicksburg Job # : TH-DD-0005691616
Survey and Drilling Parameters North Ref : Mag Declination : ° VS Dir : 285.00° (from 1.5N, 7.1E)

WELLBORE SURVEY DRILLING PARAMETERS


Measured Incl Azi Vertical Vertical Coordinates DLS Build Turn WOB RPM Flow Stand Orientation Tool ROP BHA Comment
Depth Angle Dir Depth Section N/S E/W Rate Rate Rate Pipe From To Face No.
(m) (deg) (deg) (m) (m) (m) (m) (°/100') (°/100') (°/100') (klbs) (gpm) (psi) (m) (m) (deg) (m/hr) (#)
3707.00 19.70 270.10 3469.4 1060.3 204.5 -1036.3 0.58 -0.53 -0.74 12 150 250 2900 22 4
3736.00 19.70 270.50 3496.7 1069.8 204.6 -1046.0 0.14 0.00 0.42 12 150 250 2900 8 4 Last MWD Survey
Chevron Vietnam CV-5X

Hours by Operation Summary Hours per BHA Breakdown


60 57
Rig Up / Tear Down 114

Drilling 79.25 50

Total Hours Below Rotary


Waiting on Weather 72
40 37
Wireline Logs 59.5
Operation

Miscellaneous 27.75 30
Tripping 23.75
20 17
PU/LD BHA 9.75

Run Casing / Cement 8.5 10


Circulate 5.75 3
0
Other 7.75
1 2 3 4
0 20 40 60 80 100 120 BHA Number
Drilling Circulating
Total Hours During Job Reaming Other

Days vs. Depth Average Rate of Penetration per BHA


0 130 124.0

120
200
110
96.7
100
400
90
600 80
ROP (m/hr)

70
800
60
50
1000 42.0

40
1200 30 24.0

20
1400
10
0
1600
Measured Depth (m)

1 2 3 4

1800 BHA Number

2000
Footage per BHA
2200 1775
1800

2400 1600

2600 1400
Footage Drilled (m)

1200 1112
2800
1000
3000
800
3200 600 552

3400 400 310

200
3600
0
3800 1 2 3 4
0 2 4 6 8 10 12 14 16 BHA Number
Day Rotated Oriented

Thailand Page 4 Sperry-Sun Drilling Services


Drilling Fluids Recap

Well Summary:

Drilling Fluids

Hole From – Casing Max Max Chemical Cost


Max MW Days
Section To (m) @m BHT Incl. (US$)

12 ¼” 0-310 310 9.2 N/a 0 1 12,120.00

8 ½" 310-1422 1419.25 9.2 N/a 0 1 7,105.00

6 ⅛" 1422-3749 N/a 9.2-10.2 161 27 5 282,515.10

P&A N/A N/a 10.3 N/a 19.7 5 6,250

Drilling Days & Cost 12 196,826.70

Total Days on well: 18 Days

Total Engineering Cost: 25,560.00 USD

Total Chemicals Cost: 196,826.70 USD

Total Well Cost: 222,386.70 USD

M-I SWACO Engineers:


Project Engineer: Randy Lydda

Field Engineers: Tim McHugh, Siriwat


Teachawattanapanich

Page 66
12-1/4” Section

Details of operation:

9 5/8” casing @ 310m MD


12 ¼ ” hole drilled from 0m
12 ¼” hole drilled to 310 m
Cost for section $12,120.00
Cost / m $ 39.10
Cost / bbl $10.5
Volume built 1160 bbls
Volume used 730 bbls

Summary of drilling events:

After towing and waiting on weather to preload, the well was Spudded on
February 21-08. The 9 5/8” casing was drilled to 310mTD using 9.8 ppg WBM and
seawater. The WBM / seawater combination gave 9.2 ppg at the bit. The casing
was cemented and preparations made for next section.

Drilling Fluid Properties and Performance:

The mud for this section was Xantham (Duovis) 9.8-10.0 ppg. It was pumped to
the hole as split stream with seawater to maintain 9.2 ppg in the hole.

Hole Problems:
None

Other Problems:
None

Solids Control Equipment Performance:


Cuttings to seabed.

Cost Comments:
The cost for this section was $ 12,120.00. The cost included the mud built for the
end of the 8.5” section. This mud has to be prepared ahead of time for speed of
operation.

Lessons Learned and Recommendations:


The practices above mentioned proved to be sufficient and effective and could be
continued for similar wells in this area.

Page 67
8-1/2” Section

Details of operation:

7” casing @ 1419.25 m MD
8 ½ ” hole drilled from 310 m
8 ½” hole drilled to 1422 m
Cost for section $ 7,105.00
Cost / m $ 4.99
Cost / bbl $9.60
Volume built 782 bbl
Volume used 740 bbl

Summary of drilling events:

The 8.5” BHA was run in the hole and cement was tagged at 280m. The float
collar and shoe were drilled out at 298 and 310m. 1.5m of new hole was drilled
and a LOT test performed – 12.7 ppg EMW at 220psi. drilling then continued to
1422mTD , 1402m TVD. A 52 bbls 12 ppg HiWt pill was pumped and circulated
round. Circulation continued till the shakers were clean. The hole was then
displaced to 9.2 ppg PHPA WBM. A slug was pumped after a flow check and the
drill string pulled from the hole. Casing was run in to 1419.25m with no problems
recorded and BJ performed the cement job. The string was pulled to rig up 6.125”
BHA.

Drilling Fluid Properties and Performance:

The section was drilled with seawater to TD and a 12 ppg HiWt pill circulated
round. This pill brought a large increase in cuttings at the shakers – all dumped
overboard. The hole was then displaced to 9.2ppg WBM/PHPA. Any remaining
WBM from this section was saved in nthe surface pits for the plug and abandon
operation.

Hole Problems:
None

Other Problems:
None

Page 68
Solids Control Equipment Performance:

Solid control equipment which has used in this section was 4 ea Derrick/Super G
4 Panel shale shakers, All shale shaker were ran all the time while drilling with
seawater. The shakers were on to collect samples from this section.

Shaker Screen Usage


Mesh Size New Used
Vicksburg 30 mesh 0
Brandt HP 180 mesh 0
Brandt HP 80 mesh 0

Cost Comments:

The cost for this section was $7,105.00

Lessons Learned and Recommendations:

The practices above mentioned proved to be sufficient and effective and could be
continued for similar wells in this area.

Page 69
6-1/8” Section

Details of operation:

3 ½” liner @ N/a
6 ⅛ ” hole drilled from 1422 m
6 ⅛” hole drilled to 3749 m
Cost for section (incl P $ 177,601.70
and A)
Cost / m $ 76.32
Cost / bbl $ 215.80
Volume built 593 bbl
Volume used 823 bbl

Summary of drilling events:

After nipple up and testing the BOPs, the 6.125” BHA was picked up and run in
the hole, tagging the top of the cement at 1375m. The cement was drilled
out while displacing the well to 9.2 ppg SBM. Three meters of new formation was
drilled to 1425m. A bottoms up was circulated round and an LOT test was
performed to 17 ppg EMW. The hole was directionally drilled to 3197m where it
was decided to change the bit. Seepage losses to this point averaged 4-5 bbls/hr.
In addition to chemicals added to maintain mud properties, 5 sx/hr of vinseal was
added for loss control. The shaker screens were screened up as soon as the mud
heated up to 200 mesh on the first 3 screens and a 180 mesh on the end. This
seemed to work well and the Vortex could handle the volume of cuttings. The mud
weight was increased according to the weight up schedule from 9.2 ppg to 10.2
ppg at TD of section.
The new bit was run in and drilling continued to TD – 3749m – 3509 TVD. A
flow check was done and then a swab test performed. A bottoms up was
circulated till the shakers were clean, a slug was pumped and the string was
pulled from the hole.
Halliburton rigged up to run logs and in this time mud for the plug and
abandonment section was prepared.
When logging was finished a 2 7/8” stinger was run in the hole to the cementing
point at 3365m. The SDF was displaced with 10.3 ppg WBM and BJ equipment
was rigged up. The 1st plug – 3365-2985m 14 ppg cement slurry was set. While
pulling up there was a 370K overpull at 3166m. A bottoms up was circulated and
the string was pulled to 2202m. Here a carbide sample was dropped and
circulated round. Gas came to surface at 1400 stks. The string was pulled to
surface for observation. 40 stands of tubing were left in the hole. The string was

Page 70
run in to 2208m and the 2nd plug was set. The string was pulled to 2063m and
plug #3 was set.
While the plugs were being set Brandt was centrifuging the OBM in the surface
pits to 9.1 ppg for backloading to the boat.
Four more plugs were set at 1918m, 1773m, 1628m, and 1454m. There were no
problems encountered setting any of these plugs.
The string was pulled and the 7” EZSV was run and set at 1389m – the 7” shoe.
Cement was pumped below and above the retainer then the 7” casing was cut at
281m. The string was pulled and the 9 5/8” retainer was run in and set at 275m.
The casing was pressure tested to 1000psi and cement was pumped below and
above this retainer as well. The casing was cut at 117m and the string was pulled
from the hole. The OBM pits were backloaded to the boat and the WBM pits were
dumped and cleaned for rig mobilization. The rig was prepared for skidding to new
location – B-VD-2X.

Drilling Fluid Properties and Performance:

The mud for this section was Synthetic based mud system with Saraline 200 base
oil and 10 ppb Versacoat. We received 890 bbl of SBM from the previous well and
built additional volume as needed.
Initial mud weight was 9.2 ppg when drilling out the cement and shoe track. After
the LOT was done, the mud weight was gradually increased to 10.2 ppg prior to
TD.
During drilling, properties and volume in active system were maintained by
transferring premixed mud. All the chemicals were premixed prior to transfer to
active. The Rheology was controlled with Bentone 38 as primary viscosifier to
have 6 rpm reading between 6 and 10. Oil water ratio was maintained as between
79/21 and 80/20 with Saraline 200 as base oil. Versacoat was the primary
emulsifier in this system. The Electrical stability (ES) was maintained between 520
- 890 V. The premix mud was built with 10 ppb of Versacoat which was enough to
maintain the ES in active.
Lime was used to activate the emulsifier in the system, also to maintain the
alkalinity of the mud. While drilling, additions were made to the active to maintain
properties. Prior to logging 2ppb additional lime was added to the active.
Salinity was controlled with CaCl2 to have the WPS around 200,000 ppm in the
active system.

Hole Problems:
None

Other Problems:
The 2 7/8” stinger was snapped off at 3166m. 40 stands of tubing were left in the
hole.

Page 71
Solids Control Equipment Performance:

Solid control equipment which has used in this section was 4 ea Derrick/Super G
4 panel shale shakers, 2 ea Brandt HS2172 centrifuge and Brandt Vortex Dryer.
All shale shakers were run as needed with end configuration of 200,200,200,180
mesh on each shaker.
The centrifuges were run as needed to keep LGS in the desired range and
maintained the mud weight. One centrifuge was allocated to the vortex dryer and
one to the active system. The Brandt Vortex Dryer proved a valuable piece of
equipment. It was run to reduce surface losses at the shakers and saved SBM by
pumping it back into the system instead of into the ocean.

Shaker Screen Usage


Mesh Size New Used
Vicksburg 30 mesh 0
Brandt HP 180 mesh 5
Brandt HP 265 mesh 5
Brandt HP-A325 mesh 0

Cost Comments:
The cost for this section was $177,601.70. Seepage losses contributed to mud
lost costs. The solids control equipment contributed to saving whole mud costs.

Lessons Learned and Recommendations:

9 It was found if we built higher weight mud in the slug pit and used this to
bleed into the active system, it was freeing up the barite line to build premix
when needed.

9 Adding excess emulsifier, lime and HTHP filtration control prior to logging
would give stable mud properties during this period.

9 The practices above mentioned proved to be sufficient and effective and


could be continued for similar wells in this area.

Page 72
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 23 Feb 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 6-1/8"
WELL NO. CV-5X BIT TYPE
ENGINEER ONBOARD 3 LITHOLOGY
SCREEN USAGE 0 MIDNIGHT DEPTH 1787 METRE
DAILY SAFETY CARD 1 TOTAL DRILLED 364.98 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 0 0 7 6.3 0 7
OPERATION TYPE Standby Standby Drill Drill Drill
SCROLL SPEED (RPM) 400 800
BOWL SPEED (RPM) 1500 2300
FEED RATE GPM 10 60
MAIN DRIVE TORQUE % MAX. 8 28
MUD WEIGHT IN PPG 12.6 9.2 15
MUD WEIGHT OUT PPG 9.2 8.9 12.6
DISCHARGE WEIGHT PPG 17.6 17.6 13.9
CUT POINT 3.4 0.3 2.4
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 19.00 19.00
SAMPLE DEPTH 1486.00 1486.00
CENTRATE WEIGHT PPG 9.21 8.91
RETORTED OIL % vol. 71.00 74.00
RETORTED WATER % vol. 18.00 18.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 19.00 19.00 19.00
SAMPLE DEPTH 1486.00 1486.00 1486.00
RETORT WT - EMPTY (50 ML) A 843.10 840.00 841.20
RETORT WT + SAMPLE B 953.40 955.10 909.50
RETORT WT + DRY CUTTINGS C 935.20 938.20 897.80
GRAD. CYL. WT - EMPTY D 63.30 63.50 63.40
GRAD. CYL. WT + CONDENSATE E 81.10 80.10 74.80
VOLUME OF WATER F 8.00 8.00 9.00
VOLUME OF OIL G 15.00 13.00 3.00
RESULT
OOC% (Discharge) 8.88 7.47 3.51
Sampling Error (0.95 to 1.05) 1.00 1.00 1.00
O.O.C. (Gms/Kg) DRY 109.34 90.81 35.31
Daily Base Fluid Discharged, Kg.
COMMENTS
Cement job 7" CSG, WOC. M/U BHA, RIH. @17:00 Start drilling CV-5X on 6-1/8" section. Run 1xcentrifuge cut back mud weight from
dryer and 1xcentrifuge from sandtrap. Dryer running with slightly vibration. Check screen conditions.

BRANDT ENGINEER : Watchara C. Yosakorn S. OFFICE TEL: (66)2 937 5657


Chaiyan K. OFFICE FAX: (66)2 937 5660
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 24 Feb 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 6-1/8"
WELL NO. CV-5X BIT TYPE
ENGINEER ONBOARD 3 LITHOLOGY
SCREEN USAGE 2 MIDNIGHT DEPTH 2880 METRE
DAILY SAFETY CARD 1 TOTAL DRILLED 1093 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 12 12 12 12 12 12
OPERATION TYPE Drill Drill Drill Drill Drill Drill
SCROLL SPEED (RPM) 500 800 400 800
BOWL SPEED (RPM) 1800 2300 1800 2300
FEED RATE GPM 10 60 10 60
MAIN DRIVE TORQUE % MAX. 20 35 20 36
MUD WEIGHT IN PPG 12.2 9.7 12.2 9.8 15.8 15.3
MUD WEIGHT OUT PPG 9.25 8.9 9.25 9 12.2 12.2
DISCHARGE WEIGHT PPG 19.9 21.1 20 20.4 14.5 14.2
CUT POINT 2.95 0.8 2.95 0.8 3.6 3.1
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 11.00 11.00 20.00 20.00
SAMPLE DEPTH 2406.00 2406.00 2745.00 2745.00
CENTRATE WEIGHT PPG 9.26 8.92 9.27 9.02
RETORTED OIL % vol. 71.00 73.00 71.00 74.00
RETORTED WATER % vol. 17.50 18.00 18.00 18.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 11.00 11.00 20.00 20.00 11.00 20.00
SAMPLE DEPTH 2406.00 2406.00 2745.00 2745.00 2406.00 2745.00
RETORT WT - EMPTY (50 ML) A 844.10 838.50 839.50 844.60 839.00 837.50
RETORT WT + SAMPLE B 964.20 955.10 952.10 961.10 915.90 913.80
RETORT WT + DRY CUTTINGS C 944.70 938.30 933.20 943.40 907.20 905.10
GRAD. CYL. WT - EMPTY D 63.30 63.40 63.50 63.40 63.40 63.40
GRAD. CYL. WT + CONDENSATE E 82.30 79.80 82.00 80.80 71.70 71.80
VOLUME OF WATER F 8.50 7.50 8.50 9.00 5.50 5.50
VOLUME OF OIL G 15.00 13.00 13.50 12.00 5.00 5.00
RESULT
OOC% (Discharge) 8.74 7.63 8.88 7.21 3.64 3.80
Sampling Error (0.95 to 1.05) 1.00 1.00 1.00 1.00 0.99 1.00
O.O.C. (Gms/Kg) DRY 100.42 89.64 96.39 82.82 52.28 52.69
Daily Base Fluid Discharged, Kg.
COMMENTS
Continue drilling on 6-1/8" section to TD. Run 1xcentrifuge cut back mud weight from dryer and 1xcentrifuge from sandtrap. Dryer
running with slightly vibration. Check screen conditions.

BRANDT ENGINEER : Watchara C. Yosakorn S. OFFICE TEL: (66)2 937 5657


Chaiyan K. OFFICE FAX: (66)2 937 5660
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 25 Feb 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 6-1/8"
WELL NO. CV-5X BIT TYPE
ENGINEER ONBOARD 3 LITHOLOGY
SCREEN USAGE 0 MIDNIGHT DEPTH 3197 METRE
DAILY SAFETY CARD 3 TOTAL DRILLED 317 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 12 12 2 2 0 0
OPERATION TYPE Drill Drill Drill Drill
SCROLL SPEED (RPM) 500 800 400 800
BOWL SPEED (RPM) 1800 2300 1800 2300
FEED RATE GPM 10 60 10 60
MAIN DRIVE TORQUE % MAX. 20 35 20 36
MUD WEIGHT IN PPG 12.2 10.2 12.2 10.2
MUD WEIGHT OUT PPG 9.25 9.5 9.25 9.4
DISCHARGE WEIGHT PPG 19.9 21.4 20 20.4
CUT POINT 2.95 0.7 2.95 0.8
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 4.00 4.00 1.00 1.00
SAMPLE DEPTH 2925.00 2925.00 3197.00 3197.00
CENTRATE WEIGHT PPG 9.26 8.92 9.51 9.19
RETORTED OIL % vol. 72.00 72.50 71.00 72.00
RETORTED WATER % vol. 18.00 18.00 18.00 18.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 4.00 4.00 1.00 1.00 4.00 1.00
SAMPLE DEPTH 3197.00 3197.00 3197.00 3197.00 3197.00 3197.00
RETORT WT - EMPTY (50 ML) A 831.50 843.80 842.50 842.40 839.00 840.60
RETORT WT + SAMPLE B 927.70 972.70 955.60 960.60 915.90 913.60
RETORT WT + DRY CUTTINGS C 909.50 955.80 935.10 941.70 908.00 903.30
GRAD. CYL. WT - EMPTY D 63.50 70.50 63.50 63.40 63.40 63.40
GRAD. CYL. WT + CONDENSATE E 81.70 87.30 83.60 82.00 71.10 73.40
VOLUME OF WATER F 9.00 6.00 8.00 9.00 5.00 7.80
VOLUME OF OIL G 18.00 15.00 15.00 12.00 5.00 5.00
RESULT
OOC% (Discharge) 9.56 8.38 10.70 8.12 3.51 3.01
Sampling Error (0.95 to 1.05) 1.00 1.00 1.00 1.00 1.00 1.00
O.O.C. (Gms/Kg) DRY 150.44 93.56 106.63 81.62 52.28 55.07
Daily Base Fluid Discharged, Kg.
COMMENTS
Continue drilling on 6-1/8" section to TD Until 2pm they started to pull out for changing a bit. Run 1xcentrifuge cut back mud weight from
dryer and 1xcentrifuge from sandtrap. Dryer running with slightly vibration. Check screen conditions.

BRANDT ENGINEER : Watchara C. Yosakorn S. OFFICE TEL: (66)2 937 5657


Chaiyan K. OFFICE FAX: (66)2 937 5660
Solid Control Report on Vicksburg
GENERAL INFORMATION
COUNTRY Vietnam REPORT NO. -
LOCATION Vietnam DATE 26 Feb 08
OPERATOR Chevron MUD TYPE SBM
CONTRACTOR Vicksburg BIT SIZE Exploration 12 1/4",8-1/2",6-1/8"
WELL NO. CV-5X BIT TYPE
ENGINEER ONBOARD 3 LITHOLOGY
SCREEN USAGE 5 MIDNIGHT DEPTH 3747 METRE
DAILY SAFETY CARD 0 TOTAL DRILLED 550 METRE
EQUIPMENT OPERATION
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
MODEL 2172 2172 2172 2172 Vortex Vortex
OPERATION HOURS 10 10 12 12 10 12
OPERATION TYPE Drill Drill Drill Drill Drill Drill
SCROLL SPEED (RPM) 500 800 400 800
BOWL SPEED (RPM) 1800 2300 1700 2300
FEED RATE GPM 10 60 10 60
MAIN DRIVE TORQUE % MAX. 20 35 14 28
MUD WEIGHT IN PPG 12.2 10.3 12.2 10.1
MUD WEIGHT OUT PPG 9.25 9.4 8.8 9.4
DISCHARGE WEIGHT PPG 19.9 21.4 20 20.2
CUT POINT 2.95 0.9 3.4 0.7
CENTRATE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 5.00 5.00 2.00 2.00
SAMPLE DEPTH 3312.00 3312.00 3559.88 3559.88
CENTRATE WEIGHT PPG 9.26 8.92 8.79 9.51
RETORTED OIL % vol. 71.00 73.00 72.00 70.00
RETORTED WATER % vol. 17.50 18.00 18.00 18.00
SOLIDS DISCHARGE - RETORTING RESULT
Cent#1 AM Cent#2 AM Cent#1 PM Cent#2 PM Dryer AM Dryer PM
SAMPLE TIME 5.00 5.00 2.00 2.00 5.00 2.00
SAMPLE DEPTH 3312.00 3312.00 3559.88 3559.88 3312.00 3559.88
RETORT WT - EMPTY (50 ML) A 831.50 840.00 840.00 843.00 839.00 841.80
RETORT WT + SAMPLE B 927.70 958.00 954.00 962.50 915.90 913.30
RETORT WT + DRY CUTTINGS C 908.80 939.70 934.60 943.90 908.00 903.80
GRAD. CYL. WT - EMPTY D 63.50 70.50 63.50 63.50 63.40 63.40
GRAD. CYL. WT + CONDENSATE E 81.20 87.10 82.50 81.80 70.90 72.60
VOLUME OF WATER F 9.00 6.00 8.00 9.00 5.00 6.00
VOLUME OF OIL G 15.00 17.00 13.20 12.00 5.00 4.00
RESULT
OOC% (Discharge) 9.04 8.98 9.65 7.78 3.25 4.48
Sampling Error (0.95 to 1.05) 0.99 0.99 1.00 1.00 0.99 1.00
O.O.C. (Gms/Kg) DRY 125.36 115.83 93.09 80.74 52.28 44.98
Daily Base Fluid Discharged, Kg.
COMMENTS
Continue drilling on 6-1/8" section until we got TD @ 3747m. Run 1xcentrifuge cut back mud weight from dryer and 1xcentrifuge from
sandtrap. Dryer running with slightly vibration. Check screen conditions.

BRANDT ENGINEER : Watchara C. Yosakorn S. OFFICE TEL: (66)2 937 5657


Chaiyan K. OFFICE FAX: (66)2 937 5660
Cuttings Base Fluid Retention
Well CV-5X
10

9 At Centifuges
At Dryer
8

6
% OOC

0
23-Feb 24-Feb 25-Feb 26-Feb
Day
Abandonment Schematic

Page 78
CHEVRON VIETNAM
WELL ABANDONMENT SCHEMATIC

CV-5X TYPE Exploration


PLAN Vicksburg, Rt - Sea level = 34.4 m Proposed
MD VD Water depth = 78 m MD VD DESCRIPTION
casing collar at 114.7 m Mud line 112.4 m 9-5/8" cut-off at 117m (4.6 m below mud line)
casing collar at 127 m
TOC-235 m
Collar at 272.5 m BOC-275 m Balance 10 bbl cement on top of 9-5/8"" retainer
set retainer at 276 m 9-5/8" Retainer at 275 m (5m above 7" cut)
Float collar at 284 m Squeeze 20 bbl cement below retainer
7" casing collar 276 m 7" cut-off at 280 m (30m above 9-5/8" shoe)
csg cut
7" casing collar 287.5 m
280 m
TOC-275 m 310 mMD 310 TVD 9-5/8" casing shoe, FIT = 12.7 FIT ppg EMW
BOC-360 m

10.3 ppg WBM


TOC-1310 m
7"Collar at 1382 m BOC-1389 m Balance 10 bbl cement on top of 7" retainer
set 7"retainer at 1389 m 7" Retainer @ 1389 m (30m above 7" shoe)
7" collar at 1394. m TOC-1389 m Squeeze 20 bbl cement below retainer
BOC-1510 m
1419.5 mMD 1400 mTVD 7" casing shoe, LOT = 17 ppg EMW

plug 6 1512-1628m
plug 5 1628-1773m
plug 4 1773-1918m
plug 3 1918-2063m
plug 2 2063-2208m

plug 1 TOC-2985 m
BOC-3365 m
displace from SBM to 10.3 ppg WBM

3749 mMD 3509 mTVD TD 6-1/8" hole

4/10/20083-3_PA Schematic_final_actual.xlsCV-5X
Time vs Depth, and Cost Summaries

Page 80
Rig on tow: 07:00 15 Feb 08 Time vs. Depth & Cost Rig released: 02:45 4 Mar 08
0 Well 52-CV-5X $7.00
$6.55
WOW

$6.27
500
$6.00

$5.53
$5.20
1,000
$4.88
$5.00

$4.65
$4.55
1,500
$4.24
TVD
(m) $3.96 $4.00
$3.89

Cost
2,000 $3.54
(MM)
Planned Depth $3.19
Actual Depth
$3.00
AFE $3.07
Actual Cost
2,500 $2.56
$2.20

Bit trip
$2.01 $2.00
$1.82
3,000 $1.74
$1.52

$1.21
$1.21

$1.00
3,500 $0.90

$0.60

$0.29

4,000 $0.07
$-
0 1 2 3 4 5 6 7 8 9 Days10 11 12 13 14 15 16 17 18 19 20
NPT Summaries

Page 82
Well CV-5X
NPT by Major Category

80
70
70

60

50

Hour 40

30

20 11.5

10 3
0 0 0
0

0
Cement Downhole Fluids Rig Repairs Surface Wait On Wellbore
Failures Equipment Problems
Failure
Category
This is the last page of this EOWR.