Name of work:- Construction of Storage Structures across the Nallahs of Sal river for ground water
recharge and water harvesting in Salcete Taluka (10 nos.).
High flood discharge level observed is upto 2.50 mts above bed level.
Cross-sectional area of river = 105.00m2
Wetted perimeter of river = 12.80mts
Bed slope of river = 1: 200
Catchment area A = 5.187 Sq.Km
By Inglis Formula: