Schedule of Collumn
Schedule of Collumn
Schedule of Collumn
BOX FOOTING S
FOOTING DESIGNATION PCC SIZE
LxB
C5, C8, C10 5'-0" x 5'-0" 5'-0" x 5'-0"
C1, C2, C3, C4, C6, C7, C9, C11, C12, C13, C14 4'-0" x 4'-0" 4'-0" x 4'-0"
SCHEDULE OF
FROM FOOTING UPTO PLINTH LEVEL FROM PLINTH UPT
COLLUMN
COLLUMN SIZE COLLUMN REBAR COLLUMN SIZE
C5, C8, C10 9" X 18" 4-ф16mm + 4-ф12mm 9" X 18"
SCHEDULE OF
BOTTOM STEEL
BEAM NO. BEAM SIZE CURTAIL BAR @L/7 FROM
STRAIGHT BAR MID FACE OF SUPPORT
SCHEDULE OF SL
STEEL
SLAB TYPE SLAB THICKNESS
ALONG SHORT SPAN
S1 4.5" ∅8 mm @ 6" C/C ALTERNATE BENT
CHEDULE OF COLLUMN
FROM PLINTH UPTO 1st SLAB LEVEL FROM 1st SLAB UPTO 2nd SLAB LEVEL
LINKS
COLLUMN SIZE COLLUMN REBAR COLLUMN SIZE COLLUMN REBAR
9" X 18" 4-ф16mm + 4-ф12mm 9" X 18" 4-ф16mm + 4-ф12mm 8 mm Ø @ 7.5" C/
CHEDULE OF BEAM
TOP STEEL
CURTAIL BAR @L/4 FROM STIRRUPS REMARKS
STRAIGHT BAR END FACES OF SUPPORT
HEDULE OF SLAB
STEEL REINFORCEMENT
REMARK
ALONG SHORT SPAN ALONG LONGER SPAN
@ 6" C/C ALTERNATE BENT UP ∅8 mm @ 6" C/C ALTERNATE BENT UP TWO WAY SLAB
@ 6" C/C ALTERNATE BENT UP ∅10 mm @ 6" C/C ALTERNATE BENT UP TWO WAY SLAB
8 mm Ø @ 7.5" C/C
8 mm Ø @ 7.5" C/C