Adate 38-lineout

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

6"

SHORTER SIDE
SCHEDULE OF COLUMNS & FOOTINGS DRAWING(FOR G+1,SBC 400KN/Sq.mt.) :-

FOOTING COLUMN

LONGER SIDE
COLUMN NOS
SIZE DEPTH STEEL SIZE MAIN
STIRRUPS 8 BAR MASTER RING
SHORT X LONG D
BOTH WAYS STEEL (AFTER 3'0" INTERVAL)
6"

C4,6,9 5' X 4' 18" T 10 @ 5" C/C 9" X 18'' 8 - T 12 T 6 @ 5" C/C

C 1,2,3,5,7,8
4' X 4' 18" T 10 @ 5" C/C 9" X 15'' 6 - T 12 T 6 @ 5" C/C

6 BAR RING

SCHEDULE OF COLUMNS & FOOTINGS DRAWING

22'-8"
11'-5"
1'-3"

C3
9"

C1 C2 15X9 C1 C3
15X9 15X9 15X9 15X9
C2
15X9 Provide 9" soling for white soil
10'-7"
11'-9"

Provide 18" soling for black cotton soil.


11'

NOTES :
32

1. BASIC REFERENCE CODE - I. S. 456 - 2000.


'-5

2. CONCRETE GRADE - M20.


3. CONCRETE SHALL BE WEIGH/VOLUME BATCHED, MACHINE
"

MIXED & MECHANICALLY VIBRATED TO ASSURE FULL


COMPACTION.
21'-4"

4. STEEL - Fe 500 [ TESTED ]


C5 C4
23'-2"

5. COVER TO STEEL - FOR COLUMNS - 1.5" - 40 mm - CLEAR.


C6 15X9 9X18 C6 C4 - FOR FOOTINGS - 2" - 50 mm - CLEAR.
6. LAP LENGTH - 50 x BAR DIA.
9X18 9X18 9X18 (FOR MAIN STEEL OF COLUMNS).
C5 7. FOR ALL COLUMNS HAVING EIGHT OR MORE BARS,
MASTER RING TO BE PROVIDED.
15X9 8. S. B. C. OF SOIL IS ASSUMED 400 KN / SQM
(TO BE ACERTAINED).
9. DESIGN IS VALID FOR
GROUND FLOORS ONLY
(AS PERARCHITECTURAL DRAWING).
10. QUALITY WORK PROCEDURES & SAFETY AT SITE ARE THE
/ OWNER. WE SHALL NOT BE RESPONSIBLE FOR POOR
RESPONSIBLITIES SOLELY LIE WITH CONTRACTOR / BUILDER
QUALITY OF STEEL, CONCRETE, CURING, SHUTTERING OR
INCORRECT CONSTRUCTION PROCEDURE.
11. ANY DISCREPANCY FOUND BETWEEN STRUCTURAL
DRAWING & ARCHITECTURAL DRAWING, SHOULD BE
C8 BROUGHT TO OUR NOTICE BEFORE THE WORK IS

C7 15X9 EXECUTED.
12. APPLICATION OF OIL TO THE SHUTTERING IS NOT ALLOWED.
15X9 C9 13. REFER ARCHITECTURAL DRAWINGS WHERE-EVER NECESSARY.
9X18 C7 C8 C9 14. DEPTH OF EXCAVATION 1 M
15X9 15X9 9X18
REVISION DATE DETAILS REMARKS