Footing-F1 Footing-F2: 12mm@ 4"C/C Both Ways 10mm@ 4"C/C Both Ways
Footing-F1 Footing-F2: 12mm@ 4"C/C Both Ways 10mm@ 4"C/C Both Ways
Footing-F1 Footing-F2: 12mm@ 4"C/C Both Ways 10mm@ 4"C/C Both Ways
9"
FOOTING-F1 FOOTING-F2 9"
9" 9"
1'-6" PLINTH BEAM 9" PLINTH BEAM
2'-6" FOOTING-F3
2'-6"GL GL GL GL
COLUMN COLUMN
3' 8mm 8'' C/C STIRRUPS 3' 8mm 8'' C/C STIRRUPS 9" 9"
9" PLINTH BEAM PLINTH BEAM
2'-6"
M25 1:2:4 R.C.C M25 1:2:4 R.C.C
2' 2' GL GL
12mm@ 4"C/C BOTH WAYS 10mm@ 4"C/C BOTH WAYS
COLUMN COLUMN
6" PLAIN CEMENT CONCRETE 1:4:8 6" PLAIN CEMENT CONCRETE 1:4:8
7' 5' 3' STIRRUPS STIRRUPS
2'
FOOTING SECTION FOOTING SECTION M25 1:2:4 R.C.C
18"
18"
9"
6-16
COLUMN-C1 COLUMN-C2 COLUMN-C3
COLUMN-C4