Project Name-
NXT BROOKFEILD
1. Fall of materials
2. Property/material damage
3. Excessive load
loading and unloading 4. Physical injury(shoulder,
1
of materials manually
4 2c back, knee)
5. Dust hazard
6. Improper stacking of
materials
1.Fall Hazards
2.Manual Handling Injuries
3 installation of AC Ducts 5 2C 3.Sharp Edges and Metalworking
Hazards
4.Electrical Hazards
5.Confined Space Risks
Debris Removal
1.Noise Exposure
2.Vibration Hazards
4 3 2c 3.Airborne Dust
4.Electrical Hazards
5.Falling Objects
6.slip and trips
•
Daily Site Safety Activity Plan
Date 05/01/2024
1.
Injuries/ sprains
2. Partial or permanent
disabilities
3. Respiratory diseases
4. Financial loss
1.Respiratory desease
2.Temporary deafness
3.Body injury
4.partial/complete paralysis
1.Drilling and chipping processes can 1. Efficient & continuous housekeeping to be provided
generate high levels of noise, leading 2. Training to be provided about safe work
to potential hearing damage for
workers 3. Adequate PPE’s to be provided
2.Prolonged use of drilling and 4.Engineering Controls
chipping tools may expose workers
to hand-arm issues
3.Drilling and chipping materials can
produce airborne dust particles
4.Cable laying involves working with
electrical components, posing a risk
of electric shock