Procedure for loading Heated Cargo
C/O shall do this procedure
Completed
Completed
Printed copies of this document may not be the valid version. It is the responsibility of the reader to verify this in Docmap.
Doc: COO 11 Ver: 0 Issue: 1 May 2020 Page 2 of 5
Monitoring during voyage procedure
C/O shall do this procedure
5) Avoid ballast water into ballast tanks adjacent to heated cargo tanks.
a) Consider filling below the DB height
6) Prior arrival discharge port ensure that cargo temperatures are close to the required
discharge temperature.
Completed
Printed copies of this document may not be the valid version. It is the responsibility of the reader to verify this in Docmap.
Doc: COO 11 Ver: 0 Issue: 1 May 2020 Page 3 of 5
Discharging heated cargoes procedure
1) Decrease the steam supply.
Warning
Do not postpone the stripping. Ensure each tank’s stripping right after the main cargo line
valve shutting.
2) Stop heating when cargo’s level falls below the heating coils
a) Ensure that tanks are stripped before the temperature is below the pour point
3) Drain all cargo lines and main pumps by stripping them dry into a suitable cargo tank
4) Avoid using stripping line during final stripping
5) Blow the stripping line to avoid freezing of cargo residues
Completed
Printed copies of this document may not be the valid version. It is the responsibility of the reader to verify this in Docmap.
Doc: COO 11 Ver: 0 Issue: 1 May 2020 Page 4 of 5
15)Move remote pump control handle to maximum position
Note: For high viscosity cargoes run the pumps at higher speed and pressure.
16)Open cargo heater inlet valve slowly to prevent shocks
17)Drain heating medium inlet pipe
18)Adjust the heating flow until suitable temperature increase across the cargo heater is
achieved
Note: Follow Charterer's instruction for max. cargo temp.
19)Start other pumps following the above procedure
a) Circulate oil through deck heater using cargo pumps
Caution: Stop heating immediately if cargo pumps shut down. If not, sensitive cargoes may
be damaged.
20)Close heating medium inlet valve on completion of heating
21)Let cargo pump run for 10 minutes to cool down the heater
22)Stop the respective pump from cargo control panel
23)Drain the cargo heater and piping
24)Close the cargo heater inlet and outlet valves
25)Proceed with the above procedure for the remaining tanks
26)Reduce the hydraulic system pressure to minimum
27)Stop the power packs
28)Drain the heating medium side of the heater by opening both inlet and outlet drain
valves
29)Ensure that the heating medium inlet valve is closed and not leaking
30)Isolate the heater from the cargo line by setting the spectacle flanges in closed position