A. EARTH WORKS
A.1 Excavation - cu.m.
A.2 Backfill/Compaction - cu.m.
A.3 Embankment - cu.m.
Subtotal (Earthworks) -
B. STRUCTURAL WORKS
B.1 Concrete works
a. Slab 2.00 cu.m. 3,000.00 6,000.00
RMC (3000psi, G-1 @ 28Days)
b. Materials(columns and Beams 2.00
Cement 20.00 bags 213.00 4,260.00
Sand 1.00 cu.m. 200.00 200.00
Gravel 2.00 cu.m. 900.00 1,800.00
Subtotal 12,260.00
Subtotal 9,449.36
Subtotal (Structural Works) 21,709.36
C. ROOFING WORKS
C.1 Roof Framing Works 1.00 lot
a. Materials
2" x 4" C Purlins 7.00 pcs 518.00 3,626.00
2" x 6" C Purlins 1.00 pcs 630.00 630.00
.60mm x 45mm x 5m Metal battens 9.00 pcs 205.00 1,845.00
tekscrew 60.00 pcs. 0.75 45.00
Subtotal 6,146.00
Subtotal 19,500.00
D. MASONRY
D.1 4" thk. CHB 17.48 sq.m.
a. Materials
4" thk. CHB 228.00 pcs 5.50 1,254.00
Cement 10.00 bags 213.00 2,130.00
Sand 0.50 cu.m. 200.00 100.00
RSB (9mm dia x 6.00) 10.00 pcs 73.00 730.00
Subtotal 4,214.00
E. ARCHITECTURAL
E.1 Pebble washout 27.56 sq.m.
a. Materials
Black Pebble #10 13.00 bags 80.00 1,040.00
Black Pebble #5 5.00 bags 80.00 400.00
Cement 15.00 bags 213.00 3,195.00
40 x 40 Non-Slip Tiles 49.00 pcs
Subtotal 4,635.00
Subtotal 3,150.00
Subtotal 1,139.00
F. CEILING FINISHES
F.1 Flexboard Ceiling - flat ceiling 27.72 sq.m.
a. Materials
Carrying Channel 10.00 pcs 81.00 810.00
Furring Channel 8.00 pcs 64.00 512.00
Wall Angle 9.00 pcs 23.00 207.00
Furring Clip 28.00 pcs 2.15 60.20
Blind Rivets 3/4" 0.50 boxes 95.00 47.50
Flexboard 6.0mm 12.00 pcs 460.00 5,520.00
H. Electrical
a. Materials
4" Pinlight 4.00 sets 72.10 288.40
Wall Lamp w/ CFL 9watts 2.00 pcs. 600.00 1,200.00
9W CFL E27 230V Daylight 2.00 pcs. 66.46 132.92
Push Botton Switch 1.00 pcs. 288.00 288.00
Duplex Weatherproof Outlet w/ Cover 1.00 pc. 511.76 511.76
A. EARTH WORKS
A.1 Excavation 5.10 cu.m.
A.2 Backfill/Compaction 3.10 cu.m.
A.3 Embankment 1.00 cu.m.
Subtotal (Earthworks)
B. STRUCTURAL WORKS
B.1 Concrete works
a. Materials(columns and Beams 2.00
Cement 39.00 bags
Sand 3 cu.m.
Gravel 5.80 cu.m.
Subtotal
Subtotal
C MASONRY
C.1 4" thk. CHB 17.48 sq.m.
a. Materials
4" thk. CHB 590.00 pcs
Cement 65.00 bags
Sand 3.60 cu.m.
RSB (10mm dia x 6.00) 30.00 pcs
#16 tie wire 2.60 pcs
Subtotal
Subtotal (Masonry Works)
C. ROOFING WORKS
C.1 Roof Framing Works 1.00 lot
a. Materials
2" x 4" C Purlins 8.00 pcs
.60mm x 45mm x 5m Metal battens 10.00 pcs
tekscrew 60.00 pcs.
Subtotal
Subtotal
F. CEILING FINISHES
F.1 Flexboard Ceiling - flat ceiling
a. Materials
Carrying Channel 10.00 pcs
Furring Channel 8.00 pcs
Wall Angle 9.00 pcs
Furring Clip 28.00 pcs
Blind Rivets 3/4" 0.50 boxes
Flexboard 6.0mm 12.00 pcs
G. PLUMBING
a. Materials
3" dia PVC pipe 2.00 pcs.
3" PVC elbow 6.00 pcs.
Solvent Cement 0.50 can
Subtotal (Plumbing)
H. Electrical
a. Materials
4" Pinlight 10.00 sets
9W CFL E27 230V Daylight 5.00 pcs.
Push Botton Switch 2.00 pcs.
Duplex Weatherproof Outlet w/ Cover 5.00 pc.
Subtotal (Electrical)
Grand Total
Prepared By:
Alfred Bermudez
Civil Engineer
Unit Cost Matl.Cost
300.00 1,530.00
300.00 930.00
300.00 300.00
2,760.00
wf 1.6
col 2.16
footing 1.2
beams 1.2
230.00 8,970.00 6.16
900.00 5,220.00
1,200.00 6,960.00
21,150.00
300.00 12,000.00
160.00 11,200.00
75.00 892.50
24,092.50
45,242.50
34,395.00
34,395.00
450.00 3,600.00
205.00 2,050.00
1.00 60.00
5,710.00
15,500.00 15,500.00
15,500.00
21,210.00
81.00 810.00
64.00 512.00
23.00 207.00
2.15 60.20
95.00 47.50
460.00 5,520.00
7,156.70
375.20 750.40
34.30 205.80
1,295.00 647.50
1,603.70
72.10 721.00
66.46 332.30
288.00 576.00
511.76 2,558.80
4,188.10
116,556.00
2.3
0.8
4.3
4.5