Project : UMP MAIN BLOCK GF Job No : 23-326

Desc : 1B100 Date : 2/5/2024

Code of Beam size, conc/steel grade and concrete cover


Practice
Beam width = 250 mm fcu = 40 N/mm2
BS8110 : Beam depth = 500 mm fy = 500 N/mm2
Pt 1 : 1990 Concrete cover = 35 mm fyv = 250 N/mm2
Effective depth of
i. Tension reinf, d = 445.00 mm
ii. Comp. Reinf, d' = 51.00 mm

Design of flexural reinforcement

Cl 3.4.4.4 Max. moment = 203.3 kNm


K= 0.103 ~Singly Reinforced

z= 386.57 mm
As' req = 187.50 mm2 ~Provide nominal compression reinf
As req = 1209.00 mm2 ~Tension reinforcement

As min (tension reinf) = 162.50 mm2 Provided tension reinf


As prov (tension reinf) = 1256.64 mm2 ~ OK Layer rebar dia. nos.
Table 3.27 Percentage of rebar = 1.01 % Ac >0.13% and <4.0%, ok 1 20 4 4H20
Tension reinf provided : 4H20 2
3
As' min (comp. reinf) = 187.50 mm2 ~Governed, provide nominal bar
As' prov (comp. reinf) = 226.19 mm2 ~ OK Provided compression reinf
Table 3.27 Percentage of rebar = 0.18 % Ac Provide Asmin Layer rebar dia nos.
Comp reinf provided : 2H12 1 12 2 2H12
2
3

Design of shear link

Cl 3.4.5.2 Max. shear force, Vs = 125.13 kN v, max = 5.0596 N/mm2


Shear stress, vs = 1.1248 N/mm2 < v, max, ok

Shear stress at distance d from the support :


Shear force, Vd = 125.13 kN
Shear stress, vd = 1.1248 N/mm2

100As/bd = 1.130
400/d = 1.000
Design concrete shear
Table 3.9 stess, vc = 0.770 N/mm2
Table 3.8 Asv/Sv = 0.460

Bar size used = 10 mm


No. of legs = 2
Sv max = 333.75 mm
Link spacing = 333.75 mm ~ Provide R10-250 ADOPT LINK SPACING :250
Project : UMP MAIN BLOCK GF Job No : 23-326
Desc : 1B100 Date : 2/5/2024

Deflection check

Cl 3.4.6 Span length, L = 6500 mm


Support condition = 3 ( 1=cantilever, 2=simply supported, 3=continuous)
Table 3.10 Basic L/d = 26

Table 3.11 M/bd^2 = 4.11


fs = 300.65 N/mm2
Modification factor for 0.844
tension reinforcement =

Table 3.12 100As'prov/bd = 0.20


Modification factor for 1.06
compression reinforcement =

Allowable L/d = 23.32


Actual L/d = 14.61 ~Deflection passed