Bill For Granite Laying Work

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

K.

SIVAKUMAR Cell : 97885 91750


99946 87779
Civil Contractors

Ref. Date : 09/02/2024

To
The VMRF
Salem

Bill for Granite Laying work at chairman office


Portico

1. Granite, Marble laying and polish work = Rs 100119

(One Lakhs One Hundred Nineteen only)

Measurement list enclosed

Your’s Faithfully

136/1 NDS Nagar, 1st Street, Fairlands, Salem – 636016


S.No Description No’s Length Breath Depth Area Rate Total
1 Marble Repolish Work 1 20 17.50 350
20 17.50 350
17 9 153
17 14 238
17 16 272
3 16 48
total 1411 25 35275
2 Varanda Repolish 1 17.5 8.5 148.75 29.50 4388
1 11 3 33 29.50 973
1 22.5 8 180/2 90 29.50 2655
1 19 8 152/2 76 29.50 2242
3 Removal of existing 1 LS 1700 1700
tiles
4 Removal of existing 1 Ls 1500 1500
plastering in side wall
5 Side wall plastering 1 27 3 81 25 2025
6 Granite transport from 1 ls 1500 1500
bungalow for floor
7 Granite transport from 1 ls 2000 2000
bungaloe for side wall
8 Italian marble 1 Ls 1500 1500
transport from
bungalow for
reception table
9 Portico granite laying 1 15.5 16.5 255.5 50 12787
work
10 Portico granite laying 1 8.5 1.5 12.75 50 637
work
11 Door side 1 8.5 1.5 12.75 50 637
12 1 3.75 2 7.5 50 375
13 steps 4 4.75 1 19 rft 50 950

14 steps 5 4.75 1 17.5 rft 50 875


15 Side wall 1 27 3 81 50 4050
16 Side wall 1 3.5 2 7 50 350
17 Marble fixing 2 8.5 2 34 50 1700
18 Marble nozing 1 42 42rft ls 2000
19 Marble skirting 1 24 24rft 50 1200
20 Granite edge polish 1 60 60rft ls 1800
21 Italian marble cutting 1 ls 9000
fixing polish and
nosing work
22 Supply of Cement 10 10 400 4000
bags
23 Supply of Epoxy grout 6 Kg 4000 4000
TOTAL 100119