GIS FAT Test Plan115kV GIS - ITP - 001
GIS FAT Test Plan115kV GIS - ITP - 001
GIS FAT Test Plan115kV GIS - ITP - 001
00
Prepared by: Lydia
27/02/2024
Doc No: SGG23177NS-A-001-Rev.00
Prepared by: Lydia
Agenda
(BRE 4 ENIND 012020 Lot10 SE Dias Macedo GIS Factory Acceptance Test)
(Sieyuan Electric Co., Ltd.)
Note: The test schedule is rough plan and it may be changed according to the actual situation.
Doc No: SGG23177NS-A-001-Rev.00
Prepared by: Lydia
Test requirement:
7 Design and visual check Visually and tape IEC62271-203-7.103/Technical Spec Meet standard requirements
8 Pressure test for partitions Routine test report IEC62271-203-7.103/Technical Spec Meet standard requirements
Doc No:SGF23177NS-A-001-Rev.00