2024 Eb
2024 Eb
2024 Eb
PLOT DETAILS
1 SURVEY NO R.S.NO:10/2B4
2 PLOT NO 11 3 PATTA NO NO
AREA TYPE
(Continuous/Economically
12 Weaker Section/Others) OTHERS 13 DEMOLITION AREA in m² 0
OSR SURRENDER/
14 OSR APPLICABLE NO 15 BUYBACK/ RETAIN
Queries
1. Wrong colour code used to define area in Layer BLK_1_FLR_0_BLT_UP_AREA. Colour code used 0.
2. Block 1 building occupancy not defined in the plan.
3. exit stairway/doorway width for block 1 floor 0 not defined in the plan.
4. Maximum travel distance to emergency exit not defined in the plan.
Overall Summary
Total Area
Built Up Area in m² Carpet Area in m² Covered Area in m² FSI Area in m² Non FSI Area in m²
0.00 0.00 72.81 0.00 0.00
1.No. of Blocks
Description Provided Status
Total Number Of Blocks 1 Verified
2.Parapet
As per TNCDBR Description Required Provided Status
Part VII , 52(13) Parapet Height >= 1.2 and height <= 1.5 Height >= 1.2 and height <= 1.2 Verified
3.Solar
As per TNCDBR Description Required Provided Status
Part VI 44(2) Solar Assisted Water Heating / Defined in the plan. Verified
Lighting system
5.North Direction
As per TNCDBR Description Provided Status
part ii - 8 -iii-(l) North Direction North directions provided Verified
6.Location Plan
As per TNCDBR Description Provided Status
part ii - 8 -i Location Plan Location plans provided Verified
7.Toilet Ventilation
As per TNCDBR Description Required Provided Status
part vii-52(16a) Toilet Ventilation Min 0.5 Sq.m 0.61 Sq.m Verified
1.Plinth
As per TNCDBR Description Required Provided Status
part vii-pt52-1 Minimum plinth height >= 0.45m 0.91m Verified
This report is generated based on the Applicant Declaration and a provided drawing. The drawing has been verified with TNCDBR
rules and final decision on approval will be taken by Department officials. Completion Certificate will not be issued if any deviation
from the submitted drawing more than tolerance Limits.