16- General lifting Plan一般起重作业计划

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ATT No 14

RED SEA PROJECT PAGE No 1 of 2


PERMIT TO WORK PROCEDURE REV 0
DATE 28.04.2021

General Lifting Plan 一般起重作业计划

Project 项目部

Activity 活动
Contractor 承保章
Crane Type 吊车类型 Location 位置
Permit No 工作许可 Total weight
编号 总共重量
NO DESCRIPTION 描述 Yes No

Is everyone aware of and do they fully understand the lifting procedures?


1.
每个人都知道并完全理解起重程序吗?

2. Has everyone attended the toolbox talk?大家都参加了 TBT 交底吗?


Has a pre-use inspection of the Lifting Equipment been carried out and are the Lifting Accessories tagged
or marked with:是否对起重设备进行了使用前检查,并且起重附件是否标记或标有:
 Safe Working Load 安全荷载
3.
 A unique identification numbers唯一的识别号码
 A valid certification date 证件有效期

4. Are all safety devices working?所有的安全装置都在工作吗

5. Does everyone know the lifting supervisor of the lift?所有人知道起重主管吗?

6. Is everyone competent and aware of his or her tasks?每个人都胜任并了解他的任务吗?


Is there a current Lift Plan and risk assessment and does everybody understand the job and
7. precautions?是否有当前的提升计划和风险评估,每个人都了解工作和预防措施吗?

Is everyone aware about environmental limits (e.g. maximum permissible wind speed) for the lift?每个人
8. 都知道起重作业的环境限制(例如最大允许风速)吗?

9. Is the lift area controlled and is the lifting path clear?升降区域是否受控,升降路径是否畅通?

10. Are signaling methods and communication agreed and understood?是否同意并理解信令方法和通信?

 Rigging Sketch/ Load Calculation of lifting plan mentioning load, radius, boom length and capacity of crane.
 Load chart
 Risk assessment* (specific)
 Lifting crew competence cards
Attachment  Lifting equipment and Accessories certificates i.e. cranes and lifting gears.
*For Complex & Critical lifting operation step-by-step instruction with a specific RA, Rigging Sketch, Plan/Top
View Drawings shall be attached and approved by Appointed Person
 索具草图/负载计算提及负载,半径,吊臂长度和起重机容量的起重计划。
 负载图
 风险评估(具体)
 起重能力图表
 起重设备和附件证书,即起重机和起重装置。
 对于复杂和关键的起重操作,带有特定 RA、索具草图、平面图/顶部的分步说明
 查看图纸应附上并由指定人员批准
Note: Never start any lifting operation until all concerned have been briefed in a Pre-Start Meeting, ensuring that they
understand their role and responsibilities and that they have signed onto the Permit-to-Work or record of attendance at the
Pre-Start Meeting.注意:在所有相关人员在安全交底之前,切勿开始任何起重作业,确保他们了解自己的角色和职责,并已签
署工作许可或安全交底的签字。
ATT No 14
RED SEA PROJECT PAGE No 2 of 2
PERMIT TO WORK PROCEDURE REV 0
DATE 28.04.2021

General Lifting Plan

SI NO DESCRIPTION 描述 UNIT 单位 VALUE 数值


LOAD CALCULATION
Weight of the lifted load (Load)
1 Tones
载物重量
2 Lifting Beam 吊梁 Tones

Main Hook blocks / Aux Hook


3 Tones
weight 主钩块/辅助钩重量
Lifting Shackles & slings
4 Tones
卸扣和钢丝绳
Total weight (Gross Load)
5 Tones
总共重量

SI NO DESCRIPTION 描述 UNIT 单位 VALUE 数值

Total weight as per above


1 Tones
总重量

2 Working Boom length 臂杆长度 M

3 Counterweight 对应载荷 Tones


Crane Working Radius
4 M
吊车工作半径
Net Capacity of crane (SWL)
5 Tones
安全载荷
% of chart capacity used *
6 %
负荷图载荷比例
CRANE DETAILS 吊车
Type: Capacity :
类型 荷载
Plate
number: ID No 编号
车牌号

NAME 姓名 SIGNATURE 签字 DATE 日期


Lifting plan
prepared by 申请 Contractor / Subcontractor 承包
商/分包商

Verified By 确认 Rigger / Signal man 起重工

Verified By 确认 Crane Operator 操作工

Lifting Supervisor/ Rigger 1 一级


Approved By 批准
起重工、起重主管

Verified By 确认 HSE Area In charge 区域安全员

Note: Lifting Supervisor can approve only Simple Lifting plan 注:吊装主管只能批准简单吊装计划