Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

13000

2000
2000
3000

WC
WB
1059
OD110 uPVC(W) PIPE LINE

PPR 20(C)

UNDERGROUND
WATER TANK
15300

10,000 CAPACITY
MH
(1:100)

5000

MH
SURFACE
DRAIN MH
1000

1114

WALK-WAY

R O A D
6.0M WIDE

GROUND FLOOR PLAN (SANITARY LAYOUT)


LEGEND
SMH SOIL MANHOLE WITH SOIL PIPE LINE(S)
NOTES :
WMH WASTE MANHOLE WITH WASTE PIPE LINE(W) WATER CLOSET (COMMODE)= WC
PEDESTAL WASH BASIN = WB
SOIL PIPE STACK WITH SOIL PIPE LINE(S) SHOWER = SH
COLD = C
WASTE PIPE STACK WITH WASTE PIPE LINE(W)
HOT = H
FLOOR TRAP WITH WASTE PIPE LINE(W) MANHOLE = MH
SEPTIC TANK / SOAK-PIT
COLD WATER PIPE STACK WITH COLD WATER PIPE LINE
SOAK-PIT
SURFACE DRAIN
GULLY TRAP = GT
RAIN WATER PIPE LEADER WITH RW. PIPE LINE(R) BHATTU
WC OD110 uPVC(S) PIPE STACK
WB
OD75 uPVC(W) PIPE STACK
PPR 25 HOT WATER SUPPLY PIPE STACK
PPR 25 WATER SUPPLY PIPE STACK
PPR 25 WATER RISING PIPE STACK
(INLET PIPE)

FIRST FLOOR PLAN (SANITARY LAYOUT)

600X600 LIGHT DUTY


CI.MANHOLE COVER
100
600

OD110 uPVC(RW) PIPE LEADER


BRICKWORK IN
CEMENT MORTAR (1:4)

100 MM. P. C. C (1 : 2 : 4 ) BED


ONE LAYER DRY BRICK SOLING

VALVE

LOWER 930
TERRACE 50 115 115 50 12MM CEMENT
600
PLASTER (1:6) WITH
50

CEM. PUNNING (1:1 )


115

ALL AROUND
600
930

ROOF PLAN (SANITARY LAYOUT) OD110 PIPE


50 115

BRICKWORK IN
CEMENT MORTAR (1:4)

BHATTU
OD 75 uPVC (W)
OD 110 uPVC (S)
WC
WB
FD

OD 50 uPVC (W)
OD 75 uPVC (W)
OD 110 uPVC (S) 600X600 MANHOLE

uPVC (S)
W)
350 X350 CI. GRATING COVER
150Ø SW. GULLY TRAP

WC
100 MM. P. C. C (1 : 3 : 6) BED
WB PPR 25(C) ONE LAYER DRY BRICK SOLING
SECTION AT : W - W
PPR 25(H) 350 X 350 CI. GRATING
FD 150Ø SW. GULLY TRAP

115
W W

250
580
PPR 20(C)

115
BRICKWORK IN
PPR 20(H) CEMENT MORTAR (1:4)
50
115
250
115
50
580
GULLY TRAP PLAN
DUCT: D1 PP-R 32
VENT PIPE
1000 L
INLET
Over Head
Tank
OVER
VALVE TANK
OUTLET
600X600 LIGHT DUTY
CI.MANHOLE COVER
VENT COWL VENT COWL PP-R 25 PP-R 32
CONDITION100

OD 110 uPVC VENT PIPE OD 75 uPVC VENT PIPE PP-R 25


STACK STACK
BRICKWORK IN
HT.SITE

VALVE
CEMENT MORTAR (1:4)

TERRACE LVL TERRACE LVL TERRACE LVL.

OD 110 uPVC PIPE OD 75 uPVC PIPE


STACK STACK
PP-R 25
100 MM. P. C. C (1 : 2 : 4 ) BED
ONE LAYER DRY BRICK SOLING
GRAVITY FLOW

PP-R 25
WC
WB VALVE
(T2) (T2) (T2)
FIRST LVL. FIRST LVL FIRST LVL.

OD 110 uPVC PIPE OD 75 uPVC PIPE PP-R 25


STACK STACK PP-R 20 930
50 115 600
115 50 12MM CEMENT
PLASTER (1:6) WITH
50

PP-R 20
CEM. PUNNING (1:1 )
115

WC WB VALVE
(T1) (T1)
(T1) ALL AROUND
OD 110 uPVC PIPE LINE GROUND LVL. PLAN
OD 75 uPVC PIPE LINE
TO MANHOLE TO TO MANHOLE TO
SEPTIC TANK
930

600

SOAK-PIT
GROUND LVL. PLAN GROUND LVL. PLAN

SCHEMATIC DIAGRAM OF OD110 PIPE


SOIL & WASTE PIPE LINE
50 115

BRICKWORK IN
CEMENT MORTAR (1:4)
BHATTU
100
INLET

90
50
250
300
LIQUID LVL.

12MM CEMENT PLASTER (1:6) WITH

200
450X200 VOID CEM. PUNNING (1:1 ) ALL AROUND
BAFFLE WALL

1510
1160
1000

1000
750

600

100
60
3725

100 230 1050 1120 230 750 230 100


115

INLET
BRICKWORK IN CEMENT MORTAR (1:6)
100

230 100
230

X
100
375

600x600
450X200 VOID MANHOLE 100
BAFFLE WALL ABOVE
1560

1100

1100

1560
350

OUTLET 600x600
MANHOLE 12MM CEMENT PLASTER (1:6) WITH
ABOVE 115 CEM. PUNNING (1:1 ) ALL AROUND
375
100
230

100 230
100

100 230 1050 115 1120 230 750 230 100


3725

BHATTU

You might also like