Bill of Qty
Bill of Qty
Bill of Qty
Width/ Height/
Length Breadth Depth
Sr. No. Item Description No. (m) (m) (m) Quantity Unit
Earthwork in Excavation in
1 Foundation:
Footing (1m x 1m) 11 2.200 2.200 1.580 84.12 cu m
Depth From GL = 0.6 + 1 + 0.6
0.6 =Extra For working space
Total Qty= 84.12 cu m
2 Footing PCC
Footing (1m x 1m) 11 1.300 1.300 0.075 1.39 cu m
Thickness = 0.075
D = 0.150 + 1.0 + 0.150
Total Qty= 1.39 cu m
3 Footing RCC
Base(1m x 1m) 11 0.450 4.95 cu m
Thickness = 0.450