Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
313 views

FusionModule2000 Smart Modular Data Center Management System Wiring Diagram (ECC800-Pro, FusionModule Actuators)

FusionModule2000 Smart Modular Data Center Management System Wiring Diagram

Uploaded by

munkhjin.n
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
313 views

FusionModule2000 Smart Modular Data Center Management System Wiring Diagram (ECC800-Pro, FusionModule Actuators)

FusionModule2000 Smart Modular Data Center Management System Wiring Diagram

Uploaded by

munkhjin.n
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

The FusionModule2000 Smart Modular Data Center Management System

Wiring Diagram (ECC800-Pro, FusionModule Actuators) Date: 2023-03-15


Issue: 18
Part number: 31507395

Connecting Cables to Devices on the End Door Note


Red White
Power cable Signal cable or ELV cable
+
Black Blue 48V_OUT1 Smart ETH gateway Note:If a smart screen is
PAD Optional components Optional cable
GND Red configured, the PAD obtains
Yellow POE
NO/NC Yellow Black power from layer L1.
Monitoring devices on an end door
Sliding door magnetic lock 11 20 20 20
+ Red
LOCK 4
Black Emergency exit button GND
GND (Manual sliding door) GATE/DOOR Smart Cooling
COM Yellow
COM
Strip light 20 20 Product PDB/ Note: If the smart busbar is configured, select the legend of the power
Yellow extension cable PDU8000/ Integrated UPS
L1 PGND L 20 distribution unit (which incorporates the smart ETH gateway). If the power
N L2 N N
PGND -48VDC RTN LAN COM1 COM2 COM3 ADDRESS supply and distribution system is configured, select the legend of the smart
+
Red White N L3
AC OUT1 AC IN L N PE ETH gateway. In an N+1 scenario, the smart ETH gateway of the smart
GND
Black Blue AC OUT2
Green Red V+ R- G- B- W- L N PE L PE N L PE N busbar is connected in the same way as a single smart gateway
NO Black Access Skylight
White
COM Ambient Ambient

FusionModule Actuator
Red eLight actuator eLight power
+ LOCK 1.Lock_Door 1.Lock_skylight lights power lights power + - +- + - +-
FU1 FU2 FU3 FU4 FU5

Black GND
2.GND 2.GND
GND 24V_IN + - + - 1 2 3 4 5 N N N N N PE PE PE PE PE 11
NO
Green Revolving Emergency exit button GATE/DOOR
3.Door_state 3.Button_skylight RS485_IN + - - +
White door magnetic lock (Revolving door scenario) COM Button
MOC 4.COM 4.GND

L
1 2 3 4 1 2 3 4 DO/12V
AI/DI
Smoke
AI/DI AI/DI AI/DI AI/DI
Light_1 Light_2 Spare Button Door WG_1 WG_2
COM1/AIDI4
ECC800-Pro Two power supplies of
Power distribution unit
A Smart ETH gateway
two ambient lights
N PDF
Ambient lights 20 20
PE
guide 8 1 18 2 5 2 5 8 2 2 2 2 Ambient lights 20 20 20
rail Note: Smart * This diagram can be used as a reference only for standard projects,
Emergency Use cable 2 Connect cables along the dotted lines if Smart ETH gateway POE 4 screen and does not apply to projects which involve products version
exit button at the head one ambient light power supply is used. upgrades or other customizations.
(electric sliding door) of the row
PE and * To obtain the latest document, log in to
cable 5 at Note: If the aisle length is less than or equal to Note: If multiple modules share a smart screen, the http://support.huawei.com or http://e.huawei.com.
Note: Choose the access control device for the manual sliding PE the end of 7.5 m, two atmosphere lights share a power LAN switch should be connected as shown by the * Cables not shown in the figure do not need to be connected, and

PWR+WG
door, revolving door, or electric sliding door. the row. supply. If the aisle length is greater than 7.5 m, dashed line.

RS485
just need to be insulated.
two ambient lights use separate power supplies.
* The serial number on a cable is the cable package number.

Note: Cables between the following two types of devices and Note: Cables between the following four types of devices and
the emergency button, skylight magnetic lock, and sliding or the PAD, smart screen, and aisle light should be routed along
the door header on the right.
revolving door magnetic lock should be routed along the door
header on the left.
1
Connecting Cables to Aisle Lights
End door
Automatic
Note: Every route of light tubes needs to be connected to a PE terminal.
Ground point
Smoke Exit door Card reader Fingerprint and card reader The two AC OUT1 outputs (L1, N and L2, N) support a maximum of 15
detector button Light button status sensor with a keypad (with a keypad) lights respectively.

Note: If a light tube is 600 mm long (BOM number: 52220980), connect


Light N

Light N
Connecting Cables to the POE_1
FE_1
PWR_IN PWR_OUT
FE_2
48V_OUT2

48V_OUT1
Connecting Cables to the Power Supply and Distribution System cables according to the following figure.
Cooling System Smart 4 Aisle length ≤ 9.6 m
4 4 POE_2
Smart POE_4
ETH
POE_3
ETH 4 22
gateway gateway
POE_3
7
2 4
.........
POE_4
Note: The FE cable of the PDF connects
7
POE_2
CAN_IN CAN_OUT FE_1 CAN_IN CAN_OUT FE_1 to the GE port on the LCD. The GE
48V_OUT1 48V_OUT2

PWR_OUT PWR_IN
FE_2 FE_1 POE_1 cable of the UPS connects to the FE port
COM
Smart Cooling Smart Cooling GE on the monitoring card. FE COM1 FE
N L2 N L1
SmartLi 1 SmartLi 2 SmartLi N
Product
(Full-sized)
Product
(Half-sized) The four
Multi-functional
sensor
PDF
If no iBOX is configured, connect
Integrated UPS
PARALLEL2 PARALLEL1 PARALLEL2 PARALLEL1 PARALLEL2 PARALLEL1
AC OUT1

FusionModule
.........
POE ports Ground cables as shown by the dotted lines. OV DRV STA OL Actuator
Note: The
of a smart point
part of
ETH the smart
gateway are ETH
BCB_1 Aisle length > 9.6 m
universal. A gateway 6 iBOX
device can shows POE 19
Connecting Cables to the UIM20A Note: The temperature sensors
connected to the NTC1-3 ports
connect to 3 only
logical 6 3 HUAWEI
WLAN
AIDI_1 AIDI_2 COM1/AIDI_4 COM3/12V WAN1 LAN1/POE

ECC800-Pro (Front)
any of the
Expansion Module in an IT Cabinet
USB RF_Z
SW 4G
DO/12V AIDI_3 COM2/AIDI_5 COM4/CAN WAN2 LAN2/POE

are installed on the cabinet relation-


ports. OL STA DRV GND
front door. The temperature ship. The AC_input1 AC_input2

Smart
Front
door
sensors
connected to the NTC4-6 ports
actual 6 5 6 7 8
BIB
53.5VDC_OUT1 53.5VDC_OUT2
ECC800-Pro (Rear)
object
rPDU 1 lock are installed on the cabinet
prevails. + - 16
rear door.
For the 6
BAT
detailed Battery string
NTC6

SER/
NTC1 NTC3 NTC5

legend,
COM
20
NTC2 NTC4

see part
A.
6
Group 1 Group 2
A Connecting Cables to the ECC800-Pro in eth2
N L2 N L1

Front door 6 the Network Cabinet Server


AC OUT1 Group 3 Group 4
device port
UIM20A
eth3 (Using 2288X V5 as an example, 20
Expansion COM1/AIDI_1 COM3/AIDI_3 COM5/AIDI_5 COM7/AIDI_7
Same information and wiring for
module UIM20A RUN
ALM
COM2/AIDI_2 COM4/AIDI_4 COM6/AIDI_6 COM8/AIDI_8 POE 6 Note: Connect the signal cable from each camera and ports on other servers)
Rear door FE_1 IVS1800 to the LAN switch in the following scenarios: (1) N L2 N L1
4
POE_1

device port
Blink PWR_IN
Four or more cameras and IVS1800s are deployed in a single AC OUT1
16 Cable connections to the
POE_2
Smart 6 FE_2
48V_OUT2
smart module. (2) The cameras outside the smart module 2 USB Mgmt Server network port smart ETH gateway in the
POE_3 PWR_OUT
are connected to the smart module, and there are at least FusionModule scenario with 2N power
ETH
48V_OUT1

2
Personal Computer
Note: In the standard four cameras and IVS1800s inside and outside the smart 4G module
2 Actuator
distribution systems and the
scenario (one UIM20A
POE_4
gateway 6 Smart POE_4
module. (3) Multiple smart modules share one IVS1800. (4) smart busbar
SER/ LAN switch
expansion module is installed
COM ETH There are at least two IVS1800s.
POE_3
(Using the LAN switch
48V_OUT1
in each IT cabinet), connect Note: In the expansion PWR_OUT
FE_2 gateway
an asset detection strip to scenario, one UIM20A 48V_OUT2
Skylight magnetic locks
POE_2
with twenty-four ports Note: If a light tube is 1200 mm long (BOM number: 52221116), connect
the COM6 port on the Smart Rear Asset expansion module can PWR_IN as an example) cables according to the following figure.
4
FE_1
UIM20A expansion module, door detection connect to only one type of
rPDU 2
POE_1
as shown in the figure. lock strip intelligent devices.
Note: If more than
nine skylight magnetic
ECC800-Pro (Front) IVS1800 2 WAN1 LAN1/POE
locks are cascaded, GE1 Camera 7
Note: In the expansion scenario (four IT cabinets share one UIM20A expansion module), configure one more
AIDI_1 AIDI_2 COM1/AIDI_4 COM3/12V WAN1 LAN1/POE N L2 N L1
connect asset detection strips to the COM1, COM3, COM5, and COM7 ports on the UIM20A FusionModule Ground
expansion module. If the actual number of IT cabinets is not an integer multiple of 4, some actuator. Do not point AC OUT1
HUAWEI
WLAN
COM ports on the UIM20A expansion module will be idle when asset detection strips are cascade the skylight
connected based on the cable connection rule. magnetic locks of the Ground point
USB RF_Z
FusionModule 7
two FusionModule SW 4G Actuator
3 actuators. 3 DO/12V AIDI_3 COM2/AIDI_5 COM4/CAN WAN2 LAN2/POE

WiFi Module LAN2/POE


4G Antenna
Connecting Cables to COM3/12V
Smart Cooling Product PDB
XT3
Light 1

Light 1

Ground RF_Z Antenna


the Access Actuator point
Aisle Alarm beacon 5 DO/12V Smart Cooling Product PDB
COM4/12V XT3
4 2 RS485 containment Note: If the smart module is COM3/COM4 XT3

configured with a water leakage 2 AI/DI_1 1 RS485+ PM-A+


Note: If two 1234 PWR+WG sensor, you do not have to install 2 RS485- PM-B- Connecting Cables to the T/H Sensors
FusionModule
for Smart Cooling Products
PGND -48V RTN
POE_1 FE_1 48V_OUT2

POE COM2 COM1 ADDRESS PWR_IN FE_2 the water leakage sensor delivered eLight actuator
Actuators are
configured, you do POE_2
2 PWR_OUT 48V_OUT1

with the smart cooling product. 2 AI/DI_2


4 COM1/AIDI_4 RS485_IN
not need to install Access actuator Smart ETH Camera Smart POE_4

an access actuator.
POE_3
gateway ETH
External fire extinguishing AI/DI_3 eLight actuator
If one FusionMod-
POE_4
2 gateway
POE_3
ECC800-Pro (Rear) equipment 5 COM2/AIDI_5 RS485_IN OUT IN
... RS485_OUT
ule Actuator is AI/DI_1 AI/DI_2 WG_1 WG_2 POE_2
configured,
AC_input1 AC_input2
LOCK GND GATE COM
48V_OUT1

install an access FE_2


PWR_OUT
Multi-functional
PWR_IN
FE_1 POE_1 53.5VDC_OUT1 53.5VDC_OUT2
actuator on the Smart
48V_OUT2

sensor
aisle rear door.
8 2 2 Card reader with cooling
LOCK
GND
GATE
COM

a keypad T/H sensors ≤ 10 (5 in the cold product


End door aisle+ 5 in the hot aisle)
Ground point AI/DI_3 Note: Passive: Fire extinguishing signalscan connect to the ECC800 directly.
1 Active (12 V, 24 V): A relay isrequired for isolation.
8 Card reader
with a keypad
Sliding door or revolving 1
door magnetic lock Exit button Copyright © Huawei Digital Power Technologies Co., Ltd. 2023. All rights reserved.

You might also like