Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

LDRRMP Template

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3

LDRRMP Template

Description Remarks

Preliminary Pages

A Title Page Logo, title, timeframe

B Resolution Adopting the LDRRMP Sanggunian

C Message from the LCE

D Existing DRRM-CCA related Local policies


policies/guidelines/resolution
(description) National

Global

E Table of Contents

F Acronyms and Abbreviation

G Definition of Terms

H Executive Summary Profile, top hazard, swoc,


priority ppas

A. Ecological Profile Only summary of


Ecological Profile (may
1. Population and Social Services refer to the CLUP and CDP
2. Local Economy for comprehensive data)

3. Infrastructure and Physical Base

4. Environmental Management and


Natural Resources

B. Institutional (LDRRMC and LDRRMO


Structure)

C. Risk Profile (include Risk Maps) Risk Profile shall come


from the conducted Risk
1. All Hazard Assessment. The local
2. Vulnerability capacities include
programs and protocols for
3. Capacity disaster operations

4. Exposure
D. Situational Analysis: Identifying SWOC The assessment areas as
for the 4 thematic areas bases for analysis include
specific DRRM activities
1. Disaster Prevention and Mitigation per thematic area such as
EWS, education and
training, LDRRMO office,
response equipment and
2. Disaster Preparedness resettlement program. It
also include the cross-
cutting concerns which are
health, human-induced
disasters, gender
mainstreaming
3. Disaster Response environmental protection,
cultural sensitivity or
indigenous practices ,
among others
4. Disaster Rehabilitation and Recovery

E. Thematic Area Plan (per thematic area) The DRRM Plan with a
clear vision and mission
1. Goals agreed by the members of
2. Objectives the LDRRMC shall be the
direction of all DRRMC
3. Outcome initiatives for the prescribed
period of six years.
4. PPAs

5. Targets including Gender concerns

6. Key output

7. Responsible Person/Agency/Office

8. Timeframe

9. Sources of funds

F. Monitoring and Evaluation Explains how and why


desired results were (were
Expected results
Baseline not) achieved

Assumption/Risk

Objectively verifiable indicators

Targets

Data sources

Collection Methods

Frequency and audience of the report

OPR

Resources needed

G. Annexes

Protocols, systems, guidelines (ICS)

DRRM-CCA-related trainings
conducted

Manual of operations

Contingency plans

Directory

H. References Related literatures used by


LGUs. Citing of references

References:

 Ndrrm plan 2020-2030


 Clup 2010-2020
 CdrA
 PSA

You might also like