Checklist
Checklist
Checklist
INCLUDED
S.NO DESCRIPTION REMARKS
YES N/A NO
Completely filled, signed, dated, and stamped technical data schedule for
1 LV power cables with all design parameters and (N/A) for any non-
applicable items
Signed, dated, and stamped Compliance statement (01-TMSS-01) with no
2
deviations
Signed, dated, and stamped Compliance statement(11-TMSS-10) with no
3
deviations for subject LV AC power cables
Signed, dated, and stamped Manufacturer’s responsibility statements by
4
approved Manufacturer for subject LV AC power cables
Cables cross-sectional drawings from Manufacturer, clearly indicating the
5 color of the cores and the jacket, all cable’s layer and thicknesses of each
layer
6 LV AC Transfer Scheme Drawings
7 Cable Sizing Calculation
8 Voltage Drop Calculation
9 Circuit Breaker Sizing calculation
10 Circuit Breaker reference Catalogue
Approved Loads for all major equipment which includes Power
11 transformers, Battery chargers, Lighting Panels, HVAC equipment, GIS ,MV
Switchgear etc.
12 Manufacturer’s catalogue for LV AC power cables.
Type test reports from the cable manufacturer should be provided for
13
reference.
BY SIGNING BELOW:
1-Contractor guarantees that all submitted documents are as per this check list, otherwise, Contractor is responsible to do all required
modifications without changing submittal’s revision number.
2-Contractor confirms that complete package of document submittal is stamped and signed by Contractor/Manufacturer.
3-Contractor should clarify and explain in the Remarks column if a particular document submittal is not applicable.
Rev No. Submission Date Releasing Date Days taken to Reply by Contractor
0
1
2