UNIT

S/N DESCRIPTION Rate

IMPROVEMENT OF ELECTRICITY
SUPPLY TO IGBODO
TOWN(REHABILITATION OF
EXISTING 11KV LINE, INSTALLATION
A
3NOS 300KVA, 11/0.4KV AND 3NOS
500KVA, 11/0.4KV DISTRIBUTION
SUBSTATION AND CONSTRUCTION
OF 4KM 0.4KV LINE

Pin Insulator
1 Galvd - (11kV) Composit silicon
Tie Straps(11kV) No -
2 type No -
Jumper Spindle (11kV) Composit silicon
3 type No -
4 Disc Insulator(11kV) Silicon type No -
5 LV Stay Insulator No -
6 HV Stay Insulator No -
7 5/8" Stay Wire(LV) metre -
8 7/8" Stay Wire(HV) metre -
9 6'Stay Rod(LV) No -
10 8'Stay Rod(HV) No -
11 Stay Thimble No -
12 Stay Block No -
13 D/G Shackle Insulator No -
14 D-Iron with Pins No -
15 Extension Strap No -
16 16x51 B,N & W No -
17 16 x152 B,N & W No -
18 16x200/275 B,N & W No -
19 16x254 B,N & W No -
20 16x280/305 B,N & W No -
21 F/Washer for 22mm Dia No -
22 F/Washer for 18mm Dia No -
23 M20x2282 B,N & W No -
24 Pole Identification No -
25 Barbed Wire metre -
26 Danger Plate No -
27 11kV Fiber Cross-arm No -
28 Galvd Angle Iron (5"x3"x 3/8 x 9ft) No -
29 Aluminium Line Tap for 150mm2 conductor No -
30 Galvanised copper Earthing Rod (6ft) No -
31 Bare Copper Wire (70mm2) metre -
32 10.36 metre RC Pole No -
33 8.5 metre RC Pole No -
34 Galvanised Channel Iron (5"x3/8"x3"x6ft) No -
35 Copper Earth Mat No -
36 150mm2 AAC (m) metre -
37 120mm2 AAC (m) for LT Lines metre -
38 300KVA,11 /0.4KV Distribution transformers No. -
39 500KVA,11 /0.4KV Distribution transformers No -
40 Galvanized Channel Iron (5"x3/8"x6ft) No. -
41 1x70mm2 XLPE Cable M -
42 Termination kit 11kv (indooor and outdoor) Set -
43 4x150mm2 LV Underground Copper cable M -
44 1X500mm2 LV Underground cable No. -
45 70mm2 Bare Copper Conductor M -
46 Assorted Cable lugs No. -
47 800Amps Feeder Pillar No. -
48 Heavy Duty Earth Rod No. -
49 11KV D Fuse Set -
50 11KV Lightening Arrestor Set -
51 11kV line Isolator No -
All civil works including fencing with 2 metre
52 high, transformer plinth 1.5m high, gravelling, No.
and access gate -
53 Concrete foundation for RC Pole No -
54 Bush clearing/Tree cutting metre -
Detailed Route Survey complete with four(4)
55 sets of survey drawings metre -
Removal of undersized Aluminium conductor to
56 BEDC designated store Lot

57 Removal of wooden poles Lot


Testing and commissioning with HQ staff
58 including NEMSA certification Lot

GRAND TOTAL
LOCAL
QTY MATERIAL TRANSPORT TOTAL
& ERECTION

(a) (b) (c) d=b+c

90 0 0 -
140 0 0 -

25 0 0 -
60 0 0 -
80 0 0 -
45 0 0 -
640 0 0 -
590 0 0 -
80 0 0 -
45 0 0 -
125 0 0 -
125 0 0 -
800 0 0 -
800 0 0 -
80 0 0 -
60 0 0 -
120 0 0 -
120 0 0 -
120 0 0 -
85 0 0 -
300 0 0 -
205 0 0 -
200 0 0 -
60 0 0 -
180 0 0 -
60 0 0 -
60 0 0 -
30 0 0 -

60 0 0 -
45 0 0 -
0 0 0 -
75 0 0 -
130 0 0 -
0 0 0 -
0 0 0 -
20,650 0 0 -
18,400 0 0 -
3 - 0 -

3 - 0 -
30 - 0 -
270 - 0 -
6 - 0 -
180 - 0 -
240 - 0 -
480 - 0 -
240 - 0 -
6 - 0 -
120 - 0 -
6 - 0 -
6 - 0 -
6 - 0 -
6 - -
0
60 0 0 -
0 0 -

4 0 0 -

0 -

0 -

0 0 -

0 0 -
NIPP DISTRIBUTION PROJECTS ALL PRICES IN NAIRA
PROJECT MANAGEMENT OFFICE, BENIN

LOCAL
UNIT QTY MATERIAL TRANSPORT & TOTAL
S/N DESCRIPTION ERECTION
Rate

(a) (b) (c) d=b+c


REHABILITATION OF 6KM 11KV LINE
FROM OBOMKPA TO UBULU-UBU, 2KM
0.415KV LINES AND INSTALLATON OF
A
3NOS. 300KVA DISTRIBUTION
TRANSFORMER SUBSTATIONS AT
UBULU-UBU TOWN FOB
1 Galvd Tie Straps(11kV) No - 98 0 - -

2 Pin Insulator - (11kV) Composit silicon type No - 174 0 - -

3 Spindle (11kV) No - 0 0 - -

4 Jumper Spindle (11kV) Composit silicon type No - 12 0 - -

5 Disc Insulator(11kV) Silicon type No - 54 0 - -

6 Tension Clamp No - 54 0 - -

7 Socket Tongue No - 0 0 - -

8 J-Hook No - 0 0 - -

9 Terminating Strap No - 0 0 - -

10 LV Stay Insulator No - 20 0 - -

11 HV Stay Insulator No - 54 0 - -

12 5/8" Stay Wire(LV) metre - 200 0 - -

13 7/8" Stay Wire(HV) metre - 540 0 - -

14 6'Stay Rod(LV) No - 20 0 - -

15 8'Stay Rod(HV) No - 54 0 - -

16 Stay Thimble No - 74 0 - -

17 Stay Block No - 74 0 - -

18 D/G Shackle Insulator No - 200 0 - -

19 D-Iron with Pins No - 200 0 - -

20 Extension Strap No - 40 0 - -

21 16x51 B,N & W No - 36 0 - -

22 16 x152 B,N & W No - 72 0 - -

23 16x200/275 B,N & W No - 72 0 - -

24 16x254 B,N & W No - 54 0 - -

25 16x280/305 B,N & W No - 60 0 - -

26 F/Washer for 22mm Dia No - 250 0 - -

27 F/Washer for 18mm Dia No - 200 0 - -

28 M20x2282 B,N & W No - 200 0 - -

29 Pole Identification No - 72 0 - -
NIPP DISTRIBUTION PROJECTS ALL PRICES IN NAIRA
PROJECT MANAGEMENT OFFICE, BENIN

LOCAL
UNIT QTY MATERIAL TRANSPORT & TOTAL
S/N DESCRIPTION ERECTION
Rate

(a) (b) (c) d=b+c

30 Barbed Wire metre - 216 0 - -

31 Danger Plate No - 96 0 - -

32 11kV Fiber Cross-arm No - 42 0 - -

33 Galvd Angle Iron (5"x3"x 3/8 x 9ft) No - 12 0 - -

34 Aluminium Line Tap for 150mm2 conductor No - 36 0 - -

35 Galvanised copper Earthing Rod (6ft) No - 24 0 - -

36 Bare Copper Wire (70mm2) metre - 260 0 - -

37 10.36 metre RC Pole No - 72 0 - -

38 8.5 metre RC Pole No - 34 0 - -

39 Galvanised Channel Iron (5"x3/8"x3"x6ft) No - 18 0 - -

40 Copper Earth Mat No - 5 0 - -

41 150mm2 AAC (m) metre - 14,300 0 - -

42 120mm2 AAC (m) for LT Lines metre - 9,700 0 - -


300KVA,11 /0.415KV Distribution
No. 3 -
43 transformers - - -

Galvanized Channel Iron (5"x3/8"x6ft) No. 15 -


44 - - -

1x70mm2 XLPE Cable M 150 -


45 - - -

Termination kit 11kv (indooor and outdoor) Set 3 -


46 - - -

4x150mm2 LV Underground Copper cable M 120 -


47 - - -

1X500mm2 LV Underground cable No. 120 -


48 - - -

70mm2 Bare Copper Conductor M 240 -


49 - - -

Assorted Cable lugs No. 120 -


50 - - -

800Amps Feeder Pillar No. 3 -


51 - - -

Heavy Duty Earth Rod No. 60 -


52 - - -

11KV D Fuse Set 3 -


53 - - -

11KV Lightening Arrestor Set 3 -


54 - - -

11kV line Isolator No 3 -


55 - - -

All civil works including fencing with 2 metre


high, transformer plinth 1.5m high, gravelling, No. 3 - -
and access gate
56 - -

57 Concrete foundation for RC Pole No - 72 0 - -

58 Bush clearing/Tree cutting metre - 0 - -

Detailed Route Survey complete with four(4) sets of


59 survey drawings metre - 0 - -

Testing and commissioning with HQ staff including


60 NEMSA certification 0 - -
NIPP DISTRIBUTION PROJECTS ALL PRICES IN NAIRA
PROJECT MANAGEMENT OFFICE, BENIN

LOCAL
UNIT QTY MATERIAL TRANSPORT & TOTAL
S/N DESCRIPTION ERECTION
Rate

(a) (b) (c) d=b+c

GRAND TOTAL
0
0 -- --
NDPHC DISTRIBUTION INTERVENTION PROJECTS
PROJECT MANAGEMENT OFFICE, BENIN ALL PRICES IN NAIRA
PROPOSED IMPROVEMENT OF ELECTRICITY SUPPLY TO IGBODO AND UBULUBU
COMMUNITY OF DELTA STATE SUMMARY

S/N DESCRIPTION TOTAL

IMPROVEMENT OF ELECTRICITY
SUPPLY TO IGBODO
TOWN(REHABILITATION OF EXISTING
11KV LINE, INSTALLATION 3NOS
A
300KVA, 11/0.4KV AND 3NOS 500KVA,
0.00
11/0.4KV DISTRIBUTION SUBSTATION
AND CONSTRUCTION OF 4KM 0.4KV
LINE

REHABILITATION OF 6KM 11KV LINE


FROM OBOMKPA TO UBULU-UBU, 2KM
0.415KV LINES AND INSTALLATON OF
B
3NOS. 300KVA DISTRIBUTION
0.00
TRANSFORMER SUBSTATIONS AT
UBULU-UBU TOWN

TOTAL 0.00

7.5% VAT 0.00

Contingency 0.00

GRAND TOTAL 0.00