Professional Documents
Culture Documents
Bill 2
Bill 2
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC Descripton (DSR'16 Items- Unit
Service civil works) Erectio
Total Erection
Sl. No. Accounting Unit Quantity n
Charges
codes) Charge
s
1.1 Carriage of material by mechanical
transport including loading,unloading and
stacking 1.1.2
1 995428 Earth upto 1km Cum 85.99381 87.33 7509.8394273
1155846.654454
with gst 1363899.052255
492.51
Schedule- 3a
Construction of steel Framed Store at Dahegam Substation - Civil Scheduled item (3a)
SAC
Service Unit Total
Descripton (DSR'16 Items-civil works) Access
Sl. No. Accounting Unit Erection Erection
Quantity
codes) Charges Charges