Estimate of road and Tensile fabric work near ladli Laxmi Garden Indira Colony
Dismantling of cement concrete pavement i/c breaking to pieces
notexceeding 0.02 cum in volume and stock piling at designated
2.5
1 locations and disposal of dismantled materials up to alead up to 1000
(P-15)
meter, stacking serviceable and unserviceable materials separately and as
per relevant clauses of section-200.
NO. L B D/H QTY. UNIT
1.00 115.00 3.50 0.15 60.38 cum.
60.38 cum. 749.00 45224.62
Excavation for road way in soil by manual means including loading in
3.1
2 tippers and disposal with all lifts and lead up to 1000 meters and as per
(P-21)
relevant clauses of section-300.
NO. L B D/H QTY. UNIT
1.00 31.00 3.50 0.45 48.83 cum.
48.83 cum. 119.00 5810.77
Crusher Run Macadam- Providing & laying crushed stone aggregate,
on a prepared surface,spreading and mixing with a motor grader,
4.2 b) watering and compacting with a vibratory roller as per clause 407 of the
3 i (P- specifications.
29) b) By Mixing Plant :
i)For 53 mm maximum
NO. L B D/H QTY. UNIT
1.00 31.00 3.50 0.10 10.85 cum.
10.85 cum. 1322.00 14343.70
Construction of Dry lean cement concrete Sub-base over aprepared sub-
grade with coarse and fine aggregate conforming to IS:383,the size of
coarse aggregate not exceeding 26.5mm,aggregate cement ration ot to
exceed 15:1,aggregate gradation after blending to be as per MORTH
Specifications Table 600-1,cement content not to be less than 150
kg/cum,optimum moisture content to be determined during trial length
6.1
4 construction , concrete strength not to be less than 10 Mpa at 7 days,
(P-48)
mixed in a batching plant,transported to site,laid with paver with
electronic sensor/mechanical paver,compacting with 8-10 tonnes
vibratory roller,finishing and curing and as per relevant clauses of
section- 601.
6.7Deduct from Item No.6.2 ,6.3 and 6.6 above if paver with
electronic sensor is not used and laying, compaction is done by any
other method (Note: The acceptance criteria regarding
level,thickness,surface regularity,texture finish,strength of concrete
cum.
and all other quality control measures shall be the same as in case of
machine laid work.) This item is to be executed with Prior written
permission of Engineer- in-charge