SAMPLE TEMPLATE BOQ

Ground works_Frame
BILLS OF QUANTITIES STAGE 3

Description Quantity Unit Rate Total

BUILDING A

05: EXCAVATING AND FILLING

The following drawings has been used: EPS001-HYD-AZ-00-DR-


S-100006; EPS001-HYD-AZ-00-DR-S-100007; EPS001-HYD-AZ-
00-DR-S-100008

05.10 SITE CLEARANCE/PREPARATION

Removing trees

girth 0.60 - 1.50: filling voids with selected material arising


1
from excavation 3 nr

Removing tree stumps

girth 0.60 - 1.50: filling voids with selected material arising


2
from excavation 3 nr

05.20 EXCAVATIONS

To reduce levels

3 maximum depth not exceeding 1.00m 863 m³

maximum depth not exceeding 1.00m for formation level


4
including blinds and insulation 825 m³

Basements and the like: commencing level from reduce level:


59.320m

5 maximum depth not exceeding 2.00m 1,100 m³

For pile caps and ground beams between piles

not exceeding 2.00m : commencing from reduce level:


6
59.32m 655 m³

not exceeding 2.00m : commencing from reduce level:


7
61.1m 274 m³

not exceeding 2.00m : commencing from reduce


8
level:57.82m 57 m³

Page 1 of 38
not exceeding 2.00m : commencing from reduce
9
level:58.27m 166 m³

Foundation excavation: commencing from reduce level:


60.61m

10 maximum depth not exceeding 1.00m 155 m³

Extra over excavation irrespective of depth for excavating


(Approximate Quantity)

11 next existing drainage service 180 m

12 around existing services crossing excavation 50 nr

Extra over excavation irrespective of depth for excavating:


breaking out existing materials (Approximate Quantity)

13 concrete 636 m³

14 coated macadam or asphalt: 250 thick 7,450 m²

Working space allowance to excavations: including additional


earthwork support, disposal and backfilling

15 pits 2,035 m²

Earthwork support to faces of excavation

16 maximum depth not exceeding 2.00 m 1,945 m²

17 maximum depth not exceeding 4.00 m 224 m²

DESIGN, SUPPLY AND INSTALL SHEET PILING OR TEMPORARY


SUPPORTS: DRIVEN VERTICALLY INCLUDING BREAKING
THROUGH OBSTRUCTIONS, DISPOSAL OF EXCAVATED
MATERIAL ETC

Contractors design supports

18 to contractors proposal 42 m

05.30 DISPOSAL

Surface water

19 generally Item

Ground water

20 generally Item
Page 2 of 38