BILLS OF QUANTITIES STAGE 3
BUILDING A
Removing trees
05.20 EXCAVATIONS
To reduce levels
Page 1 of 38
not exceeding 2.00m : commencing from reduce
9
level:58.27m 166 m³
13 concrete 636 m³
15 pits 2,035 m²
18 to contractors proposal 42 m
05.30 DISPOSAL
Surface water
19 generally Item
Ground water
20 generally Item
Page 2 of 38