Sched Log
Sched Log
Sched Log
exe
=========================================================
Default Project..................................................CCC-Zuluf-
L3-UPDT-01
Projects:
CCC-Zuluf-L3-UPDT-01.............................................CCC -
Zuluf Onshore Oil Facilities Level 3 Schedule Update - 20240328
Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................No
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .264
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar
Advanced
--------
Calculate multiple float paths...................................No
Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................5637
# Not Started....................................................3436
# In Progress....................................................742
# Completed......................................................1459
# Relationships..................................................13676
# Activities with Constraint.....................................525
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0312
3D Model - 60% Model Review Priority-1 (PKG-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0315
3D Model - 60% Model Review Priority-2 (PKG-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0380
3D Model - 90% Model Review
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-13520-0130
Detail Dwgs - Equipment Platform & Ladder FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-13640-0020
Dwgs - Special Pipe Support Remaining FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013B
R2151-301: Manufacturing - Drums - ETA in JAN (A520,A530)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C
R2151-301: Manufacturing - Drums - ETA in FEB (A220,A320, A520,A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C1
A83-D-0007 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C2
A83-D-0012A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C3
A83-D-0012B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C4
A83-D-0020 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013D
R2151-301: Manufacturing - Drums - ETA in MAR (A260,A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013E
R2151-301: Manufacturing - Drums - ETA in APR (A260,A430,A530,A540,A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013E1
A86-D-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013E2
A86-D-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011
R2151-501: Manufacturing and Delivery - Filters - 2nd Batch (A420 & A430) *
Longest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-1
A86-D-0003 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-A
A86-D-0002A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-B
A86-D-0002B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-C
A86-D-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-D
A86-D-0005A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-E
A86-D-0005B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-F
A86-D-0006A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-G
A86-D-0006B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-H
A86-D-0008A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-I
A86-D-0008B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-J
A86-D-0009A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-K
A86-D-0009B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A
R2151-501: Manufacturing and Delivery - Filters - 1st Batch (A520, A550 &
B130)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A1
A83-D-0009 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A2
A83-D-0010A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A3
A83-D-0010B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A4
A83-D-0013A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A5
A83-D-0013B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A6
A83-D-0014A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A7
A83-D-0014B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A8
A83-D-0019A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A9
A83-D-0019B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021
R2151-301: Manufacturing - Drums - ETA in MAY (A530,A540,A550) * Longest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-A
A83-D-0102 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-B
A83-D-0103 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-C
A83-D-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-D
A83-D-0106 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-E
A83-D-0201 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-F
A83-D-0202 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-G
A83-D-0203 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-H
A83-D-0204 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-J
A83-D-0206 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-K
A83-D-0101 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-L
A83-D-0025 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-M
A83-D-0107 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-N
A83-D-0108 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-O
A83-D-0207 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-P
A83-D-0208 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Q
A83-D-0021 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-R
A83-D-0111 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-S
A83-D-0112 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-T
A83-D-0120 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-U
A83-D-0121 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-V
A83-D-0122 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-W
A83-D-0123 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-X
A83-D-0211 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Y
A83-D-0212 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Z
A83-D-0220 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZA
A83-D-0221 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZB
A83-D-0222 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZC
A83-D-0223 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079
R2153-101: Manufacturing and Delivery - AFC - 2nd Batch (A530 & A550) *
Longest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-A
A83-E-0107 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-B
A83-E-0112A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-C
A83-E-0112C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-D
A83-E-0112E/F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-E
A83-E-0112G/H - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-F
A83-E-0207 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-G
A83-E-0212A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-H
A83-E-0212C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-J
A83-E-0212E/F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-K
A83-E-0212G/H - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079A
R2153-101: Manufacturing and Delivery - AFC - 1st Batch (A430)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079A1
A86-E-0001A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079A2
A86-E-0001C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A
R2153-202: Manufacturing and Delivery - S&T H/Ex (CS) - 1st Batch (A540)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A1
A83-E-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A2
A83-E-0105 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A3
A83-E-0106 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A4
A83-E-0204 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A5
A83-E-0205 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A6
A83-E-0206 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021
R2158-102: Manufacturing/Shipping - Heavy Duty Centrifugal Pumps (A430)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-A
A86-G-0002A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-B
A86-G-0002B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-C
A86-G-0002C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-D
A86-G-0003A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-E
A86-G-0003B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-F
A86-G-0004A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-G
A86-G-0004B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-H
A86-G-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-I
A86-G-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-J
A86-G-0001C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-K
A86-G-0001D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-L
A86-G-0001E - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-M
A86-G-0001F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021A
R2158-102: Manufacturing/Shipping - Heavy Duty Centrifugal Pumps (A620)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112
R2158-101: Manufacturing - Centrifugal Pumps Process - 1st Batch
(A240,A340,A520,A530,A550 & A620)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112-1
A83-G-0020A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112-2
A83-G-0020B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A
R2158-101: Manufacturing - Centrifugal Pumps Process - 2nd Batch
(A220,A230,A240,A260,A320,A330,A340,A520,A530,A620&C110
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A1
A84-G-0091A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A2
A84-G-0091B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A3
A84-G-0092A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A4
A84-G-0092B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AA
A84-G-0020A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AB
A84-G-0020B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AC
A84-G-0020C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AD
A84-G-0020D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AE
A84-G-0021A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AF
A84-G-0021B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AG
A84-G-0021C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AH
A84-G-0021D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1114
R2158-101: Manufacturing - Centrifugal Pumps Process - 3rd Batch
(A230,A260,A330,A420&C110)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-1
A83-G-0006A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-2
A83-G-0006B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-3
A83-G-0006C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-4
A83-G-0022A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-5
A83-G-0022B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-6
A83-U-0010 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010
R215A-101: Manufacturing - TEG Regeneration Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-1
A83-C-0001 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-2
A83-D-0008 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-3
A83-E-0001 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-4
A83-U-0001-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-5
A83-U-0001-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010
R215A-901: Manufacturing - Chemical Injection Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-1
A83-U-0005 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-2
A83-U-0006 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-3
A83-D-0031 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-4
A83-D-0032 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-5
A83-U-0003-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-6
A83-U-0003-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-7
A83-U-0003-SKID-3 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-8
A83-U-0003-SKID-4 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-9
A83-U-0004-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901010
A83-U-0004-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901011
A81-D-0018 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901012
A81-U-0003 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901013
A81-U-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901014
A81-U-0006 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901015
A81-U-0007 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901016
A84-D-0030 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901017
A84-D-0035 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901018
A84-U-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901019
A84-U-0005 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901020
A81-D-0019 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901021
A81-D-0021 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901022
A81-D-0022 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901023
A84-D-0020 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901024
A84-D-0021 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9030
R215A-104: Manufacturing - TEG Off-Gas Recovery Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9030-1
A83-U-0002-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9030-2
A83-U-0002-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1091
R216A-109: Manufacturing for UG Pipes 1st MTO - GRP Pipes and Piping
Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1104
R216A-110: Manufacturing - PVC Pipes and Piping Components Incl. PVC Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0312
R216G-312: Manufacturing - PIV, Valves with Position Indicator
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0615
R216G-615: Manufacturing - Insulation Gasket Kits
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-6150
R216F-191: Manufacturing - Gaskets
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21820-6013
R2182-601: Manufacturing for 3rd MTO - Power and Control Cables
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21830-0570
R2183-211: Manufacturing - Lighting
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21830-5700
R2183-231: Manufacturing - LED light
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21520-5016
R2152-501: Shipping - Equipment Platforms & Ladders
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21532-3010
R2153-301: Shipping - Electrical Heater
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080
R2156-101: Shipping - Hot Oil Furnace - Last Batch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-1
A86-F-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-2
A86-F-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-3
A86-F-0001C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-4
A86-F-0001D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080A
R2156-101: Shipping - Hot Oil Furnace - 1st Batch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031
R2158-103: Shipping - High Speed Integrally Geared Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-A
A83-G-0091A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-B
A83-G-0091B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-C
A83-G-0092A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-D
A83-G-0092B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-E
A83-G-0092C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-F
A83-G-0092D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-G
A83-G-0101A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-H
A83-G-0101B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-I
A83-G-0102A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-J
A83-G-0102B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-K
A83-G-0102C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-L
A83-G-0103A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-M
A83-G-0201A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-N
A83-G-0201B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-O
A83-G-0202A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-P
A83-G-0202B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-Q
A83-G-0202C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-R
A83-G-0203A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-S
A83-G-0203B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-T
A83-G-0103B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1041
R2158-104: Shipping - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1051
R2158-105: Shipping - Submersible Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011
R2158-201: Shipping - API617 Centrifugal Compressor (ATM@A530)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-1
A83-K-0101 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-2
A83-K-0201 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-3
A83-E-0101A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-4
A83-E-0101C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-5
A83-E-0201A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-6
A83-E-0201C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B
R2158-201: Shipping - API617 Centrifugal Compressor (HP@A530)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B1
A83-K-0102 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B2
A83-K-0202 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B3
A83-E-0102A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B4
A83-E-0103A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B5
A83-E-0103C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B6
A83-E-0202A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B7
A83-E-0203A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B8
A83-E-0203C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012
R2158-201: Shipping - API617 Centrifugal Compressor (Pipeline@A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012-1
A83-K-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012-2
A83-K-0105 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012B
R2158-201: Shipping - API617 Centrifugal Compressor (C3@A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012B1
A83-K-0204 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012B2
A83-K-0205 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-215Z0-0080
R215Z-001: Shipping and all delivered on Site - Fire Fighting and Safety
Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0135
R216B-135: Shipping - Forged Steel Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0137
R216B-137: Shipping - Ball Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0139
R216B-139: Shipping - Butterfly Valves (Resilient Lined)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0140
R216B-140: Shipping - Butterfly Valves (Eccentric Design)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0142
R216B-142: Shipping - Dual Plate Check Valves (including Non-slam type)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0143
R216B-143: Shipping - Plug Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0144
R216B-144: Shipping - Bronze Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-1311
R216B-131: Shipping - CCS and LTCS Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216E0-0181
R216E-181: Shipping - Bolts and Nuts
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0201
R216G-201: Shipping - Strainers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0203
R216G-203: Shipping - Desuperheaters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0302
R216G-302: Shipping - Motor Operated Valves (Ball)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0303
R216G-303: Shipping - Motor Operated Valves (Butterfly)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0307
R216G-307: Shipping - Axial Disc Check Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0322
R216G-322: Shipping - Auto Drain Valve
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0401
R216G-401: Shipping - Line Blanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0501
R216G-501: Shipping - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0504
R216G-504: Shipping - Restriction Orifices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0505
R216G-505: Shipping - Level Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0506
R216G-506: Shipping - Sight Glasses
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0601
R216G-601: Shipping - Sample Coolers and Sampling Systems
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0603
R216G-603: Shipping - Emergency Showers and Eye Washers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0611
R216G-611: Shipping - Flexible Metal Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0612
R216G-612: Shipping - Hoses and Hose Couplings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0617
R216G-617: Shipping - Corrosion Coupons and Chemical Injections
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0619
R216G-619: Shipping - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0701
R216K-701: Shipping - Sliding Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0702
R216K-702: Shipping - Cold Shoes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0704
R216K-704: Shipping - Spring Supports, Struts, and Snubbers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0705
R216K-705: Shipping - Vibration Isolation Pads
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-801 R216K-
703: Shipping - Cold Insulation Block
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0069-3
R2171-101: Marshalling Cabinet FOB (Ready on Site) - PKG-1 - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0070-3
R2171-101: Console & System Cabinet FOB (Ready on Site) - PKG-1 - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-3010
R2171-301: Shipping - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-3020
R2171-302: Shipping - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-3030
R2171-401: Shipping - Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21731-0110
R2173-101: Shipping - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2081
R2173-202: Shipping - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2092
R2173-208: Shipping - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2093
R2173-302: Shipping - Radar Type Level Instruments (GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2094
R2173-502: Shipping - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2104
R2173-501: Shipping - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21736-6021
R2173-602: Shipping - Venturi Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21736-6031
R2173-601: Shipping - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21741-1021
R2174-201: Shipping - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21741-2020
R2174-202: Shipping - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21741-4011
R2174-101: Shipping - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21741-4021
R2174-401: Shipping - Pressure Regulators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21751-5010
R2175-501: Shipping - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21751-5020
R2175-101: Shipping - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21761-0110
R2176-101: Shipping - Fire And Gas Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-2031
R2178-203: Shipping - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-2041
R2178-204: Shipping - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-3041
R2178-304: Shipping - Instrument Tube
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-3051
R2178-305: Shipping - Valve Manifold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-3061
R2178-306: Shipping - Tube Fitting & Inst Tube
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21800-0080
R2180-101: Shipping- Electrical Misc. Item
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21800-0085
R2180-131: Shipping - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21800-8101
R2180-111: Shipping - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-0380
R2181-213: Shipping - 230kV Transformer & Shut Reactor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-4410
R2181-411: Shipping - LV Switchgear and Controlgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-5010
R2181-501: Shipping - AC UPS/DC Charger
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-5020
R2181-431: Shipping - 4.16kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-5030
R2181-441: Shipping - 13.8kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-6110
R2181-611: Shipping - Cable Bus
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-7010
R2181-701: Shipping - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-7020
R2181-801: Shipping - PSA
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21820-8700
R2182-211: Shipping - Local Control & Isolation Switch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21820-8900
R2182-221: Shipping - Local Distribution Panel & Motor Starter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21820-9100
R2182-231: Shipping - Socket Outlet
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21830-9300
*del(IK) R2183-101: Shipping- Outdoor Distribution Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21860-0010
R2186-001: Shipping - Telecom System Equipment (CCTV)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21880-1010
R2188-901: Shipping - Electrical Heat Trace
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21300-0010
R2130-001: Complete sets of all NMRs Received - Shop Fabricated Structural
Steel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216A0-109Z
R216A-109: Complete sets of all NMRs Recieved for UG Pipes 1st MTO - GRP
Pipes and Piping Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-M1-0000-0100
Effective Date of Contract
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DB-13784-1120
A000: Instrument Piping/Installation Detail FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DD-13630-0010
Piping Isometric Dwgs - U/G (Main ring) (A00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DD-13630-10 Piping
Isometric Dwgs - U/G (Area) (A00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DG-13832-0050
A000: Lighting Layout Plan & Diagram FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13780-1150
A000: Instrument Points & Lines FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13781-1140
A000: Instrument Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13782-1090
A000: Instrument Main Cable Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13784-1110
A000: Instrument Air Pipe Arrangement FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13828-1180
A000: Electrical Cable Tray Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13829-1170
A000: Electrical Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13880-0050
A000: Electrical Heat Trace Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31610-0010
A100: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-J3-39500-0010
A100: Final Walkdown Main Piperack
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-DD-13620-0010
Piping Isometric Dwgs - A/G Issued (A11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31310-0010
A110: Pipe Rack (Pre-assembly) - Measure, Cut, Fit-up, Weld, Paint, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31632-0010
A110: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31632-0010
A120: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31411-3110
A200: PIB-1 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13620-0310
Piping Isometric Dwgs - A/G Issued (A20)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31230-0010
A210: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31610-0010
A210: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13170-1110
Detail Dwgs - Paving Plan FC (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13170-1110
Detail Dwgs - Paving Plan FC (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3702
Fdn Dwgs FC - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3802
Fdn Dwgs FC - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3812
Fdn Dwgs FC - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13410-0001
Room Size Fix - PIB-1 (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13170-1110
Detail Dwgs - Paving Plan FC (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31143-0010
A240: Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13170-1110
Detail Dwgs - Paving Plan FC (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31411-1210
A300: SUBSTATION-200 - Building Foundation (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31411-3210
A300: PIB-2 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31411-5210
A300: OPERATION SHELTER-2-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31230-0010
A310: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13170-1110
Detail Dwgs - Paving Plan FC (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3702
Fdn Dwgs FC - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31510-0010
A320: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13170-1110
Detail Dwgs - Paving Plan FC (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3702
Fdn Dwgs FC - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3802
Fdn Dwgs FC - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3804
Fdn Dwgs FC - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13170-1110
Detail Dwgs - Paving Plan FC (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3702
Fdn Dwgs FC - Stanchion (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31143-10 A340:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31581-0010
A340: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-DD-13620-0310
Piping Isometric Dwgs - A/G Issued (A40)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31A61-0010
A400: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A41)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31230-0010
A410: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31641-0010
A410: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13170-1110
Detail Dwgs - Paving Plan FC (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31143-20 A420:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31510-0010
A420: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31540-0010
A420: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31641-0010
A420: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13170-1110
Detail Dwgs - Paving Plan FC (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21370-0020
R2130-001: Fabrication - Stanchion (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31641-0010
A430: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DL-13780-0120
A500: Instrument Equipment Layout FC - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31411-1310
A500: SUBSTATION-300 - Building Foundation (SS300)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31411-3310
A500: PIB-3 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31411-5310
A500: OPERATION SHELTER-3-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31793-0010
A500: SAT (PIB-3)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31A61-0010
A500: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13231-3702
Fdn Dwgs FC - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-EE-21310-0020
R2130-001: Fabrication - Unit P/R 1st (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-EE-21310-0050
R2130-001: Fabrication - Unit P/R 2nd (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-EE-21370-0020
R2130-001: Fabrication - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31230-0010
A510: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31610-0010
A510: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31641-0010
A510: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13170-1110
Detail Dwgs - Paving Plan FC (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3702
Fdn Dwgs FC - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21370-0020
R2130-001: Fabrication - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31143-30 A520:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31510-0010
A520: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31641-0010
A520: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13170-1110
Detail Dwgs - Paving Plan FC (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3702
Fdn Dwgs FC - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-5863
Fdn Dwgs FC - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21370-0020
R2130-001: Fabrication - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31641-0010
A530: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13170-1110
Detail Dwgs - Paving Plan FC (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21370-0020
R2130-001: Fabrication - Stanchion (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31641-0010
A540: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13170-1110
Detail Dwgs - Paving Plan FC (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21320-0120
R2130-001: Fabrication - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21370-0020
R2130-001: Fabrication - Stanchion 1st (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21370-0120
R2130-001: Fabrication - Stanchion 2nd (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31143-40 A550:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31641-0010
A550: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-DD-13620-0310
Piping Isometric Dwgs - A/G Issued (A60)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31791-0010
A600: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31A61-0010
A600: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3261
Fdn Dwgs FC - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3702
Fdn Dwgs FC - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21310-3103
R2130-001: Fabrication - Unit P/R (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21370-0020
R2130-001: Fabrication - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31641-0010
A610: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13170-1110
Detail Dwgs - Paving Plan FC (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3702
Fdn Dwgs FC - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21310-0020
R2130-001: Fabrication - Eqpt Supp, Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21370-0020
R2130-001: Fabrication - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31143-50 A620:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31641-0010
A620: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13152-0030
Detail Dwgs - Grading/Paving/Earthwork Earth Dike FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13170-1110
Detail Dwgs - Paving Plan FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3702
Fdn Dwgs FC - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3712
Fdn Dwgs FC - Stanchion 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13272-0030
Detail Dwg - Dike FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21370-0020
R2130-001: Fabrication - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21370-0120
R2130-001: Fabrication - Stanchion 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31641-0010
A630: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13781-1150
B000: Instrument Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13829-0070
B000: Electrical Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31411-4110
B100: Line Maintenance Building 1-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31411-6110
B100: EMERGENCY GENERATOR BUILDING-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13170-1110
Detail Dwgs - Paving Plan FC (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31540-0010
B120: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13170-1110
Detail Dwgs - Paving Plan FC (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13170-1110
Detail Dwgs - Paving Plan FC (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31411-3410
B200: PIB-4 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31230-0010
B210: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13170-1110
Detail Dwgs - Paving Plan FC (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13170-1110
Detail Dwgs - Paving Plan FC (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13170-1110
Detail Dwgs - Paving Plan FC (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3262
Fdn Dwgs FC - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3702
Fdn Dwgs FC - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13170-1110
Detail Dwgs - Paving Plan FC (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31230-0010
B250: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31156-0010
B300: Duct Bank - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31411-1110
B300: SUBSTATION-100 - Building Foundation (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31411-2110
B300: CCB - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13170-1110
Detail Dwgs - Paving Plan FC (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31812-0010
B310: Shunt Reactor (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13170-1110
Detail Dwgs - Paving Plan FC (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31143-50 B320:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DD-13630-0010
Piping Isometric Dwgs - U/G (C00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13781-0180
C000: Instrument Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31156-0010
C100: Duct Bank - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect CCC
Scope ?
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13170-1110
Detail Dwgs - Paving Plan FC (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13170-1110
Detail Dwgs - Paving Plan FC (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3702
Fdn Dwgs FC - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31230-0010
C120: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31156-0010
C200: Duct Bank - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect CCC
Scope ?
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-J3-39500-0010
C200: Final Walkdown Flare, Flare Gas Recovery & Closed Drain System
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13170-1110
Detail Dwgs - Paving Plan FC (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1140
Complete Installation 50% of Piperack (Weight)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1150
Complete Installation of Vessels
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1170
Energization of Substation 300 (SS300)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1200 PIB-3
Building ready for PCS equipment installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1220 PMCC
GOSP - 1
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1230 PMCC
GOSP - 2
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1235 GC-1b
- Construction Subcontract Formal Approval for CCC
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1240 PMCC
Gas Compression
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1250 PMCC
Crude Storage & Shipping
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1260 PMCC
WOSEP & Disposal Water Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1270 PMCC
Flare, Flare Gas Recovery & Closed Drain System
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1280 PMCC
Hot Oil System
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1290 PMCC
Main Piperack
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1300 Final
Mechanical Completion - PKG1 - IK
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1330
Project Completion and Demobilization
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1180
Energization of Substation 100 (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1220 PMCC
Utilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1230 PMCC
WIP
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1240 Final
Mechanical Completion - PKG2 - IK
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1270
Project Completion and Demobilization
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1010
Complete Design Office & Mobilization
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1020
Program Design Excellence Summit (PDES)
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1150 Final
Mechanical Completion - PKG1 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1180
Project Completion and Demobilization - PKG1 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1280
Complete Spare Part Data Packages
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1010
Complete Design Office & Mobilization
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1140 Final
Mechanical Completion - PKG2 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1170
Project Completion and Demobilization - PKG2 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1270
Complete Spare Part Data Packages
Errors:
-------
Warnings:
---------
Activities without predecessors..................................188
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C1
A83-D-0007 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C2
A83-D-0012A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C3
A83-D-0012B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C4
A83-D-0020 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013E1
A86-D-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013E2
A86-D-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-1
A86-D-0003 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-A
A86-D-0002A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-B
A86-D-0002B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-C
A86-D-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-D
A86-D-0005A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-E
A86-D-0005B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-F
A86-D-0006A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-G
A86-D-0006B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-H
A86-D-0008A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-I
A86-D-0008B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-J
A86-D-0009A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-K
A86-D-0009B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A1
A83-D-0009 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A2
A83-D-0010A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A3
A83-D-0010B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A4
A83-D-0013A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A5
A83-D-0013B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A6
A83-D-0014A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A7
A83-D-0014B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A8
A83-D-0019A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A9
A83-D-0019B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-A
A83-D-0102 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-B
A83-D-0103 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-C
A83-D-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-D
A83-D-0106 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-E
A83-D-0201 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-F
A83-D-0202 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-G
A83-D-0203 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-H
A83-D-0204 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-J
A83-D-0206 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-K
A83-D-0101 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-L
A83-D-0025 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-M
A83-D-0107 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-N
A83-D-0108 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-O
A83-D-0207 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-P
A83-D-0208 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Q
A83-D-0021 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-R
A83-D-0111 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-S
A83-D-0112 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-T
A83-D-0120 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-U
A83-D-0121 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-V
A83-D-0122 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-W
A83-D-0123 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-X
A83-D-0211 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Y
A83-D-0212 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Z
A83-D-0220 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZA
A83-D-0221 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZB
A83-D-0222 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZC
A83-D-0223 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-A
A83-E-0107 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-B
A83-E-0112A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-C
A83-E-0112C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-D
A83-E-0112E/F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-E
A83-E-0112G/H - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-F
A83-E-0207 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-G
A83-E-0212A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-H
A83-E-0212C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-J
A83-E-0212E/F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-K
A83-E-0212G/H - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079A1
A86-E-0001A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079A2
A86-E-0001C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A1
A83-E-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A2
A83-E-0105 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A3
A83-E-0106 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A4
A83-E-0204 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A5
A83-E-0205 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A6
A83-E-0206 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-A
A86-G-0002A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-B
A86-G-0002B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-C
A86-G-0002C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-D
A86-G-0003A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-E
A86-G-0003B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-F
A86-G-0004A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-G
A86-G-0004B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-H
A86-G-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-I
A86-G-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-J
A86-G-0001C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-K
A86-G-0001D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-L
A86-G-0001E - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-M
A86-G-0001F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112-1
A83-G-0020A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112-2
A83-G-0020B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A1
A84-G-0091A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A2
A84-G-0091B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A3
A84-G-0092A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A4
A84-G-0092B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AA
A84-G-0020A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AB
A84-G-0020B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AC
A84-G-0020C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AD
A84-G-0020D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AE
A84-G-0021A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AF
A84-G-0021B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AG
A84-G-0021C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AH
A84-G-0021D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-1
A83-G-0006A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-2
A83-G-0006B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-3
A83-G-0006C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-4
A83-G-0022A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-5
A83-G-0022B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-6
A83-U-0010 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-1
A83-C-0001 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-2
A83-D-0008 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-3
A83-E-0001 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-4
A83-U-0001-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-5
A83-U-0001-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-1
A83-U-0005 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-2
A83-U-0006 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-3
A83-D-0031 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-4
A83-D-0032 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-5
A83-U-0003-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-6
A83-U-0003-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-7
A83-U-0003-SKID-3 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-8
A83-U-0003-SKID-4 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-9
A83-U-0004-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901010
A83-U-0004-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901011
A81-D-0018 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901012
A81-U-0003 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901013
A81-U-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901014
A81-U-0006 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901015
A81-U-0007 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901016
A84-D-0030 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901017
A84-D-0035 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901018
A84-U-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901019
A84-U-0005 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901020
A81-D-0019 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901021
A81-D-0021 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901022
A81-D-0022 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901023
A84-D-0020 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901024
A84-D-0021 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9030-1
A83-U-0002-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9030-2
A83-U-0002-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-1
A86-F-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-2
A86-F-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-3
A86-F-0001C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-4
A86-F-0001D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-A
A83-G-0091A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-B
A83-G-0091B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-C
A83-G-0092A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-D
A83-G-0092B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-E
A83-G-0092C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-F
A83-G-0092D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-G
A83-G-0101A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-H
A83-G-0101B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-I
A83-G-0102A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-J
A83-G-0102B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-K
A83-G-0102C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-L
A83-G-0103A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-M
A83-G-0201A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-N
A83-G-0201B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-O
A83-G-0202A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-P
A83-G-0202B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-Q
A83-G-0202C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-R
A83-G-0203A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-S
A83-G-0203B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-T
A83-G-0103B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-1
A83-K-0101 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-2
A83-K-0201 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-3
A83-E-0101A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-4
A83-E-0101C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-5
A83-E-0201A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-6
A83-E-0201C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B1
A83-K-0102 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B2
A83-K-0202 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B3
A83-E-0102A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B4
A83-E-0103A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B5
A83-E-0103C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B6
A83-E-0202A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B7
A83-E-0203A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B8
A83-E-0203C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012-1
A83-K-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012-2
A83-K-0105 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-M1-0000-0100
Effective Date of Contract
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31143-0010
A240: Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31143-10 A340:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31143-20 A420:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31143-30 A520:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31711-0010
A520: Instrument Panel (SS300)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31143-40 A550:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31143-50 A620:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31154-0010
B300: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31143-50 B320:
Sheet Piling
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1235 GC-1b
- Construction Subcontract Formal Approval for CCC
Out-of-sequence activities.......................................350
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12255-0040
Plot Plan FC w/o Hold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0025
3D Model - Modeling for 60% Model Review
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0314
3D Model - 60% Model Internal Review Priority-2 (PKG-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0315
3D Model - 60% Model Review Priority-2 (PKG-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-A110C
Data Sheets/Req. - PVC Pipes and Piping Components (216A-110) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G619C
Data Sheets/Req. - Piping Items - Spray Sheild (216G-619) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13782-2041
R2178-2xx: Req. - Instrument Cable FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-2011
R2178-201: TBE Issued - Instrument Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DL-13156-0030
Duct Bank Location Plan FC (000)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0377
R216G-307: PO Placed - Axial Disc Check Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0653
R216G-619: PO Placed - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2011-4
R2178-201: PO Placed - Instrument Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21510-3112
R2151-301: Key Vendor Info. NMR602 Received - Drums
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1052
R2158-105: Key Vendor Info. NMR602 Received - Submersible Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21520-5016
R2152-501: Manufacturing - Equipment Platforms & Ladders
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112
R2158-101: Manufacturing - Centrifugal Pumps Process - 1st Batch
(A240,A340,A520,A530,A550 & A620)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A
R2158-101: Manufacturing - Centrifugal Pumps Process - 2nd Batch
(A220,A230,A240,A260,A320,A330,A340,A520,A530,A620&C110
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1114
R2158-101: Manufacturing - Centrifugal Pumps Process - 3rd Batch
(A230,A260,A330,A420&C110)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1024
R216A-102: Manufacturing for 3rd MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0201
R216G-201: Manufacturing - Strainers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0303
R216G-303: Manufacturing - Motor Operated Valves (Butterfly)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-3030
R2171-401: Manufacturing- Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080A
R2156-101: Shipping - Hot Oil Furnace - 1st Batch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1051
R2158-105: Shipping - Submersible Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0139
R216B-139: Shipping - Butterfly Valves (Resilient Lined)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0140
R216B-140: Shipping - Butterfly Valves (Eccentric Design)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-1311
R216B-131: Shipping - CCS and LTCS Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216E0-0181
R216E-181: Shipping - Bolts and Nuts
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0322
R216G-322: Shipping - Auto Drain Valve
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0501
R216G-501: Shipping - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0619
R216G-619: Shipping - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0702
R216K-702: Shipping - Cold Shoes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-801 R216K-
703: Shipping - Cold Insulation Block
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-0180
R2181-211: Shipping - Transformers & NGR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DG-13832-0040
A000: Lighting Layout Plan & Diagram FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13780-1140
A000: Instrument Points & Lines Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13784-1100
A000: Instrument Air Pipe Arrangement Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13828-1170
A000: Electrical Cable Tray Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31154-0010
A100: Trench For Piping - Excavate, Backfill, Inspect ?? CCC Scope ?
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31230-0010
A120: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-31230-0010
A130: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31163-0010
A200: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31171-0010
A200: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31683-0010
A200: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13231-3103
Fdn Dwgs FC - Unit P/R 1st (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13231-3113
Fdn Dwgs FC - Unit P/R 2nd (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13170-1110
Detail Dwgs - Paving Plan FC (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13231-3702
Fdn Dwgs FC - Stanchion (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13231-8020
Fdn Dwgs FC - Misc. Str. (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13151-0030
Detail Dwgs - Fdn Plan/Layout/Section FC (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13151-5403
Fdn Dwgs FC - Tank A81-D-1102 (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13152-0030
Detail Dwgs - Grading/Paving/Earthwork Earth Dike FC (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3702
Fdn Dwgs FC - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3802
Fdn Dwgs FC - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3812
Fdn Dwgs FC - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31175-0010
A230: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31280-0010
A230: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3103
Fdn Dwgs FC - Unit P/R 1st (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3112
Fdn Dwgs FC - Unit P/R 2nd (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3702
Fdn Dwgs FC - Stanchion (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13251-0030
Detail Dwgs - Pit FC (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31175-0010
A240: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13170-0010
Detail Dwgs - Paving Plan FR (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13231-3702
Fdn Dwgs FC - Stanchion (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DL-13780-0120
A300: Cable Tray Layout FC - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31163-0010
A300: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31171-0010
A300: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31411-3210
A300: PIB-2 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31683-0010
A300: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13161-1110
Piping Plan FC (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13162-0010
Detail Dwgs - Manhole/Box (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3702
Fdn Dwgs FC - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31280-0010
A320: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13151-5403
Fdn Dwgs FC - Tank A82-D-1102 (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3702
Fdn Dwgs FC - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3802
Fdn Dwgs FC - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3804
Fdn Dwgs FC - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31230-0010
A330: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31280-0010
A330: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13161-1110
Piping Plan FC (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13162-0010
Detail Dwgs - Manhole/Box (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3103
Fdn Dwgs FC - Unit P/R 1st (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3122
Fdn Dwgs FC - Unit P/R 2nd (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3702
Fdn Dwgs FC - Stanchion (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13251-0030
Detail Dwgs - Pit FC (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31154-0010
A400: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31171-0010
A400: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31683-0010
A400: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31A61-0010
A400: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A41)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31641-0010
A410: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13152-0030
Detail Dwgs - Grading/Paving/Earthwork Earth Dike FC (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13170-1110
Detail Dwgs - Paving Plan FC (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13232-5603
Fdn Dwgs FC - Hot Oil Furnce (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13272-0030
Detail Dwg - Dike FC (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31175-0010
A420: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31560-0010
A420: Hot Oil Furnace Erection
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31632-0010
A420: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31641-0010
A420: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13231-3702
Fdn Dwgs FC - Stanchion (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13320-0130
Steel Str. Dwgs FC - Eqpt Supp. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21320-0010
R2130-001: Material Procurement - Eqpt Supp. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31641-0010
A430: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DL-13780-0120
A500: Instrument Equipment Layout FC - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31171-0010
A500: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31411-3310
A500: PIB-3 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31A61-0010
A500: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13231-3103
Fdn Dwgs FC - Unit P/R 1st (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13231-3105
Fdn Dwgs FC - Unit P/R 2nd (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13231-3702
Fdn Dwgs FC - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13310-3104
Steel Str. Dwgs FR - Unit P/R 2nd (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-EE-21310-0020
R2130-001: Fabrication - Unit P/R 1st (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31280-0010
A510: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31310-0010
A510: Pipe Rack (Pre-assembly) - Measure, Cut, Fit-up, Weld, Paint, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31610-0010
A510: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13161-1110
Piping Plan FC (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13162-0010
Detail Dwgs - Manhole/Box (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3702
Fdn Dwgs FC - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13251-0030
Detail Dwgs - Pit FC (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DH-13602-3600
Piping Information - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31230-0010
A520: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31641-0010
A520: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13161-1110
Piping Plan FC (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13162-0010
Detail Dwgs - Manhole/Box (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3702
Fdn Dwgs FC - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-5863
Fdn Dwgs FC - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13310-3101
Steel Str. Dwgs FR - Unit P/R (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31230-0010
A530: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31641-0010
A530: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13161-1110
Piping Plan FC (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13162-0010
Detail Dwgs - Manhole/Box (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13213-0020
Elevated Concrete Str. incl. Fdn Dwgs FC (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3702
Fdn Dwgs FC - Stanchion (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13272-0030
Detail Dwg - Dike FC (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13310-3101
Steel Str. Dwgs FR - Unit P/R (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31641-0010
A540: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13213-0020
Elevated Concrete Str. incl. Fdn Dwgs FC (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13231-3702
Fdn Dwgs FC - Stanchion 1st (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13231-3712
Fdn Dwgs FC - Stanchion 2nd (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13251-0030
Detail Dwgs - Pit FC (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13272-0030
Detail Dwg - Dike FC (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13320-0030
Steel Str. Dwgs FR - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DH-13602-3101
Piping Information - Unit P/R (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31641-0010
A550: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31171-0010
A600: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31A61-0010
A600: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3103
Fdn Dwgs FC - Unit P/R (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3261
Fdn Dwgs FC - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3702
Fdn Dwgs FC - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21310-3103
R2130-001: Fabrication - Unit P/R (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31230-0010
A610: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31280-0010
A610: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31641-0010
A610: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31840-0010
A610: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3281
Fdn Dwgs FC - Eqpt Supp, Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3702
Fdn Dwgs FC - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21310-0020
R2130-001: Fabrication - Eqpt Supp, Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31641-0010
A620: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13151-0130
Detail Dwgs - Fdn Plan/Layout/Section FC 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13151-5413
Fdn Dwgs FC - Tank A84-D-0120A/B (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13272-0030
Detail Dwg - Dike FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13370-0010
Steel Str. Dwgs FR - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21370-0020
R2130-001: Fabrication - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31152-0010
A630: Earth Dike - Prep, Construct, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31175-0010
A630: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31230-0010
A630: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31260-0010
A630: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31270-0010
A630: Retaining Wall / Dike - Prep, Construction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31280-0010
A630: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31641-0010
A630: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DD-13630-10 Piping
Isometric Dwgs - U/G (Area) (B00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13170-1110
Detail Dwgs - Paving Plan FC (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13251-0030
Detail Dwgs - Pit FC (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13170-1110
Detail Dwgs - Paving Plan FC (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13170-1110
Detail Dwgs - Paving Plan FC (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31163-0010
B200: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31171-0010
B200: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31683-0010
B200: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-DD-13231-3112
Fdn Dwgs FC - Unit P/R 2nd (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31230-0010
B210: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13170-1110
Detail Dwgs - Paving Plan FC (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3102
Fdn Dwgs FC - Unit P/R (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3122
Fdn Dwgs FC - Eqpt Supp. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3702
Fdn Dwgs FC - Stanchion (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31174-0010
B220: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13170-1110
Detail Dwgs - Paving Plan FC (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13231-3103
Fdn Dwgs FC - Unit P/R (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13170-1110
Detail Dwgs - Paving Plan FC (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3030
Fdn Dwgs FC - Unit P/R (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3262
Fdn Dwgs FC - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3702
Fdn Dwgs FC - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13272-0030
Detail Dwg - Dike FC (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13151-0030
Detail Dwgs - Fdn Plan/Layout/Section FC (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13170-1110
Detail Dwgs - Paving Plan FC (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3702
Fdn Dwgs FC - Stanchion (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13272-0030
Detail Dwg - Dike FC (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31174-0010
B250: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31280-0010
B250: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31171-0010
B300: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31683-0010
B300: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13170-1110
Detail Dwgs - Paving Plan FC (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13181-0030
Detail Dwgs - Fence and Gate FC (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13231-3203
Fdn Dwgs FC - Eqpt Supp. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13231-3702
Fdn Dwgs FC - Stanchion (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31174-0010
B310: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31280-0010
B310: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13170-1110
Detail Dwgs - Paving Plan FC (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13231-3702
Fdn Dwgs FC - Stanchion (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13251-0030
Detail Dwgs - Pit FC (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31161-0010
B320: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31280-0010
B320: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31840-0010
B320: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31154-0010
C100: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13155-0030
Detail Dwgs - Burn Pit FC (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13161-0030
Piping Plan FC (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13170-1110
Detail Dwgs - Paving Plan FC (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13181-0030
Detail Dwgs - Fence and Gate FC (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3102
Fdn Dwgs FC - Unit P/R 1st (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3122
Fdn Dwgs FC - Unit P/R 2nd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3132
Fdn Dwgs FC - Unit P/R 3rd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3702
Fdn Dwgs FC - Stanchion (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3902
Fdn Dwgs FC - Misc. Str. (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13232-5102
Fdn Dwgs FC - Flare (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13250-0020
Detail Dwgs - Pit & Pond FC (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31230-0010
C110: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13155-0030
Detail Dwgs - Pit & Pond FC (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13170-1110
Detail Dwgs - Paving Plan FC (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3102
Fdn Dwgs FC - Unit P/R 1st (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3112
Fdn Dwgs FC - Unit P/R 2nd (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3702
Fdn Dwgs FC - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13232-5812
Fdn Dwgs FC - Rotating Eqpt (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13251-0020
Detail Dwgs - Pit & Pond FC (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31280-0010
C120: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13155-0030
Detail Dwgs - Pit & Pond FC (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13170-1110
Detail Dwgs - Paving Plan FC (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13181-0030
Detail Dwgs - Fence and Gate FC (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13231-3102
Fdn Dwgs FC - Unit P/R (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13231-3702
Fdn Dwgs FC - Stanchion (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13240-0030
Detail Dwgs - Culvert FC (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13155-0030
Detail Dwgs - Pit & Pond FC (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13181-0030
Detail Dwgs - Fence and Gate FC (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13231-3702
Fdn Dwgs FC - Stanchion (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: E300-DD-13231-3102
Fdn Dwgs FC - Unit P/R (E30)
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................5637
# Relationships with other projects..............................0
Data Date........................................................28-Mar-24
Earliest Early Start Date........................................28-Mar-24
Latest Early Finish Date.........................................01-May-27
Exceptions:
-----------
Critical Activities..............................................3872
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-11100-0130
Project Execution Plan FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-11200-0230
Project Organization FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-11330-0003
Schedule Planning and Control FC - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-11400-0030
Procedure - Coordination between Company and Contractor FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-11400-0340
Interpendency Schedule FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-11400-0930
Procedure - Tag Numbering FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-11400-1050
Interface Intedependency Schedule - Final Design Information
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-12249-0030
Equipment List FC 1st
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-15200-0030
Quality Control Requirements to Vendor FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-15200-0130
Quality Requirement - Pressure Casting FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-16100-0110
Construction Execution Plan FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-16310-0140
Procedure - Area Handover FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-16310-0150
Procedure - Area Handover Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-16310-0160
Procedure - Area Handover FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-16700-0030
Procedure - Field Inspection Plan FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-17200-0010
Procedure - Pre-commissionings FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-17200-0020
Procedure - Pre-commissionings Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-A1-17200-0030
Procedure - Pre-commissionings FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B0-12236-0003
Cause and Effect FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0050
P&ID FC w/Hold - I/C PR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0051
P&ID FC w/Hold - GOSP
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0055
P&ID FC w/Hold Issued - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0060
P&ID FC w/o Hold - I/C PR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0061
P&ID FC w/o Hold - GOSP
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0062
P&ID FC w/o Hold - Gas Compression
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0063
P&ID FC w/o Hold - Crude Storage and Shipping & Flare
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0064
P&ID FC w/o Hold - Hot Oil
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0065
P&ID FC w/o Hold Issued - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0150
P&ID FC w/Hold - Gas Compression
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0250
P&ID FC w/Hold - Crude Storage and Shipping & Flare
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0260
P&ID FC w/Hold - Hot Oil
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0350
P&ID FC w/Hold - Utility
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12251-0360
P&ID FC w/o Hold - Utility
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B2-12264-0030
Overall Relief Load Summary FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12430-0030
HAZOP comments Followup PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12430-0050
HAZOP comments Followup PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12431-0030
Procedure - HAZOP/SIL FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12431-0040
HAZOP Study Report FR 1st
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12431-0050
HAZOP Study Report Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12431-0060
HAZOP Study Report FC Completion
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12431-160 Vendor
HAZOP Study Report 1st FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12431-170 Vendor
HAZOP Study Report Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B4-12431-180 Vendor
HAZOP Study Report FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12253-0040
Fire P&ID FC w/Hold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12253-0050
Fire P&ID FC w/o Hold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12411-0003
Loss Prevention Philosophy FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12413-0200
Fire Hazardous Zone Map FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12414-0003
Fire & Gas Detection Philosophy FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12414-0030
Fire Detection Location Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12414-0060
Cause & Effect Diagram - Fire & Gas Detection System FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12414-0130
Block Wiring Diagram - F&G Detection System FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12422-0060
Electrical Area Classification Dwgs FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12423-0030
Overall Emergency Escape Route Drawing - FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12423-0060
Emergency Escape Route Drawing FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12424-0170
Building Risk Assessment Report Update FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12431-0010
Vendor HAZOP PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12431-0020
Vendor HAZOP comments Follow-up PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12431-0030
Vendor HAZOP PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12431-0040
Vendor HAZOP comments Follow-up PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12432-0110
SIL Classification Report FR 1st
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12432-0120
SIL Classification Report Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12432-0130
SIL Classification Report FC Completion
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12443-0120
Noise Study Report Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12443-0130
Noise Study Report FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12445-0110
AIV Study Report FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12445-0120
AIV Study Report Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B5-12445-0130
AIV Study Report FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-B8-12200-0030
Basic Engineering Design Data (BEDD) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-11E00-0020
Design Review 60%
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-11E00-0025
Design Review (60%) followup
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-11E00-0030
Design Review 90%
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-11E00-0035
Design Review (90%) followup
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0310
3D Model - 60% Model Internal Review Priority-1 (PKG-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0312
3D Model - 60% Model Review Priority-1 (PKG-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0370
3D Model - Modeling for 90% Model Review
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0380
3D Model - 90% Model Review
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DA-13602-0400
3D Model - Close
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13605-0030
Critiacl Line List Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13605-0040
Critical Line List FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-A110B
Data Sheets/Req. - PVC Pipes and Piping Components (216A-110) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-A115C
Data Sheets/Req. - Grooved Mechanical Coupling Joints (216A-115) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G201C
Data Sheets/Req. - Piping Items - Strainer (216G-201) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G202C
Data Sheets/Req. - Piping Items - Static Mixer (216G-202) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G203B
Data Sheets/Req. - Piping Items - Desuperheater (216G-203) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G203C
Data Sheets/Req. - Piping Items - Desuperheater (216G-203) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G206C
Data Sheets/Req. - Piping Items - Power Trap (216G-206) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G223B
Data Sheets/Req. - Piping Items - Mixing Tee (216G-223) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G223C
Data Sheets/Req. - Piping Items - Mixing Tee (216G-223) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G302C
Data Sheets/Req. - Piping Items - MOV Ball (216G-302) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G303C
Data Sheets/Req. - Piping Items - MOV Butterfly (216G-303) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G307C
Data Sheets/Req. - Piping Items - Axial Disc Check Valve (216G-307) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G321C
Data Sheets/Req. - Piping Items - Integral DBBV (216G-321) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G322C
Data Sheets/Req. - Piping Items - Auto Drain Valve (216G-322) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G501C
Data Sheets/Req. - Piping Items - PRV (216G-501) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G504A
Data Sheets/Req. - Piping Items - RO (216G-504) FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G505C
Data Sheets/Req. - Piping Items - LG (216G-505) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G506B
Data Sheets/Req. - Piping Items - SG (216G-506) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G506C
Data Sheets/Req. - Piping Items - SG (216G-506) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G601A
Data Sheets/Req. - Piping Items - Sample Cooler (216G-601) FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G601B
Data Sheets/Req. - Piping Items - Sample Cooler (216G-601) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G601C
Data Sheets/Req. - Piping Items - Sample Cooler (216G-601) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G603A
Data Sheets/Req. - Piping Items - Shower & Eye Washer (216G-603) FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G603B
Data Sheets/Req. - Piping Items - Shower & Eye Washer (216G-603) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G603C
Data Sheets/Req. - Piping Items - Shower & Eye Washer (216G-603) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G611A
Data Sheets/Req. - Piping Items - Flex Metal Tube (216G-611) FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G611B
Data Sheets/Req. - Piping Items - Flex Metal Tube (216G-611) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G611C
Data Sheets/Req. - Piping Items - Flex Metal Tube (216G-611) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G612A
Data Sheets/Req. - Piping Items - Hose & Hose Coupling (216G-612) FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G612B
Data Sheets/Req. - Piping Items - Hose & Hose Coupling (216G-612) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G612C
Data Sheets/Req. - Piping Items - Hose & Hose Coupling (216G-612) FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G619A
Data Sheets/Req. - Piping Items - Spray Sheild (216G-619) FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13606-G619B
Data Sheets/Req. - Piping Items - Spray Sheild (216G-619) Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-13900-0030
Specification - Thermal Insulation FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DB-14700-0030
Procedure - Spare Parts FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13510-5013
R2151-501: Req./MDS - Filters FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13513-1132
R2151-301: Req./MDS FC - LPPT
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13513-1142
R2151-301: Req./MDS FC - Drums
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13520-5013
R2152-501: Req. - Platform & Ladder FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13581-1015
R2158-101: Req./MDS - Centrifugal Pumps FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13581-1022
R2158-102: Req./MDS - API 610 Heavy Duty Centrifugal Pumps FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13581-1043
R2158-104: Req./MDS - Positive Displacement Pumps FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13581-1053
R2158-105: Req./MDS - Submersible Pumps FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-135A0-2022
R215A-202: Req./MDS - Vacuum Deaerator Package FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-135A0-9012
R215A-901: Req./MDS - Chemical Injection Package FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13606-0030
MTO/RML - A/G Piping Materials 2.5th MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13606-0040
MTO/RML - A/G Piping Materials 4th MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13606-31601C
R3160-001: Req. - FBE Application for Piping and Piping Components FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-0040
R2171-101: Req. - PCS FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-3010
R2171-301: Req./Spec. - Power Distribution Panels FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-3011
R2171-301: Req./Spec. - Power Distribution Panels Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-3012
R2171-301: Req./Spec. - Power Distribution Panels FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-3022
R2171-302: Req./Spec. - Interposing Relay Panels FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-3032
R2171-302: Req./Spec. - Interposing Relay Panels Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-3042
R2171-302: Req./Spec. - Interposing Relay Panels FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-3062
R2171-401: Req./Spec. - Fire Detection System Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13710-3072
R2171-401: Req./Spec. - Fire Detection System FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13730-0120
R2173-101: Spec./Req. - Electronic Field Transmitters Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13730-0130
R2173-101: Spec./Req. - Electronic Field Transmitters FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13733-2042
R2173-204: Spec./Req. - Ultrasonic Flow Meter FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13733-2131
R2173-202: Major Vendor Documents Review - Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13733-2160
R2173-205: Spec./Req. - Coriolis Type Flow Meter FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13733-5012
R2173-501: Spec./Req. - Pressure Gauges Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13733-5013
R2173-501: Spec./Req. - Pressure Gauges FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13735-5022
R2173-502: Spec./Req. - Temperature Elements & Wells Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13735-5033
R2173-502: Spec./Req. - Temperature Elements & Wells FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13736-6071
R2173-602: Major Vendor Documents Review - Venturi Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13736-6101
R2173-601: Spec./Req. - Orifice Plates FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13740-1051
R2174-201: Spec./Req. - On-Off Valves FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13740-1061
R2174-201: Major Vendor Documents Review - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13740-2010
R2174-202: Major Vendor Documents Review - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13741-4031
R2174-101: Spec./Req. - Control Valves FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13741-4041
R2174-101: Major Vendor Documents Review - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13761-0120
R2176-101: Spec./Req. - Fire And Gas Alarm Devices Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13761-0130
R2176-101: Spec./Req. - Fire And Gas Alarm Devices FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13774-4130
R2177-401: Spec./Req. - Metering System FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13781-1051
R2178-103: Req. - Cable Transit FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13781-1061
R2178-103: Req. - Cable Transit Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13781-1071
R2178-103: Req. - Cable Transit FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13782-2021
R2178-2xx: Req. - Instrument Cable FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13782-2031
R2178-2xx: Req. - Instrument Cable Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13812-0319
R2180-131: DS/Req. - Junction Box FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13812-1270
R2180-101: DS/Req. - Electrical Misc. Item FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13812-1313
R2180-111: DS/Req. - Cable Gland FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13812-3000
R2181-121 Major Vendor Document Review - Diesel Generator
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13812-3240
R2182-221: DS/Req. - Local Distribution Panel & Motor Starter Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13812-3250
R2182-221: DS/Req. - Local Distribution Panel & Motor Starter FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13812-3340
R2181-212 DS/Req. - Indoor Dry Transformer FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13814-1200
R2181-501 DS/Req. - AC UPS/DC Charger FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13814-1290
R2181-801 DS/Req. - PSA FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13830-3300
R2183-211: Req. - Lighting FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13830-3930
R2183-231: Req. - LED light FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13860-3960
R2186-001: Req. - CCTV FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13880-1370
R2188-901: Req. - Electrical Heat Trace FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DC-13880-1390
R2188-901: Req. - Electrical Heat Trace FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-12310-0010
Vendor Operating Manual Input
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-13520-0130
Detail Dwgs - Equipment Platform & Ladder FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-13640-0010
Dwgs - Special Pipe Support 1st FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-13640-0020
Dwgs - Special Pipe Support Remaining FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21400-0031
R2140-002: TBE Issued - Pre-Engineered Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21400-0209
R2140-006: TBE Issued - HVAC Control Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21520-5012
R2152-501: TBE Issued - Equipment Platforms & Ladders
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21580-2144
R2158-104: TBE Issued - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216A0-1152-0
R216A-115: TBE Issued - Grooved Mechanical Coupling Joints Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216B0-0220
R216B-137: TBE Issued - Ball Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216B0-0250
R216B-142: TBE Issued - Dual Plate Check Valves (including Non-slam type)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216B0-0281
R216B-143: TBE Issued - Plug Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0212
R216G-201: TBE Issued - Strainers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0222
R216G-223: TBE Issued - Mixing Tees
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0223
R216G-202: TBE Issued - Static Mixers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0230
R216G-203: TBE Issued - Desuperheaters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0240
R216G-206: TBE Issued - Power Traps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0311
R216G-302: TBE Issued - Motor Operated Valves (Ball)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0330
R216G-321: TBE Issued - Modular Double Block/Isolation and Bleed Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0332
R216G-322: TBE Issued - Auto Drain Valve
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0333
R216G-303: TBE Issued - Motor Operated Valves (Butterfly)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0367
R216G-307: TBE Issued - Axial Disc Check Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0404
R216G-401: TBE Issued - Line Blanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0510
R216G-501: TBE Issued - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0516
R216G-504: TBE Issued - Restriction Orifices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0518
R216G-505: TBE Issued - Level Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0520
R216G-506: TBE Issued - Sight Glasses
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0522
R216G-508: TBE Issued - Buckling Pin Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0613
R216G-601: TBE Issued - Sample Coolers and Sampling Systems
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0622
R216G-603: TBE Issued - Emergency Showers and Eye Washers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0624
R216G-611: TBE Issued - Flexible Metal Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0626
R216G-612: TBE Issued - Hoses and Hose Couplings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0649
R216G-617: TBE Issued - Corrosion Coupons and Chemical Injections
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216G0-0652
R216G-619: TBE Issued - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-216Z0-31601-0
R3160-001: TBE Issued - FBE Application for Piping and Piping Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21710-3012
R2171-301: TBE Issued - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21710-3042
R2171-302: TBE Issued - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21710-3072
R2171-401: TBE Issued - Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21731-0112
R2173-101: TBE Issued - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21733-2045
R2173-204: TBE Issued - Ultrasonic Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21733-2111
R2173-202: TBE Issued - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21733-2141
R2173-205: TBE Issued - Coriolis Type Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21733-2143
R2173-208: TBE Issued - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21733-2146
R2173-302: TBE Issued - Radar Type Level Instruments (GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21733-2150
R2173-502: TBE Issued - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21733-2171
R2173-501: TBE Issued - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21736-6042
R2173-602: TBE Issued - Venturi Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21736-6081
R2173-601: TBE Issued - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21741-4031
R2174-101: TBE Issued - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21741-4051
R2174-201: TBE Issued - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21741-4081
R2174-202: TBE Issued - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21741-4111
R2174-401: TBE Issued - Pressure Regulators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21751-0112
R2175-101: TBE Issued - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21751-5012
R2175-501: TBE Issued - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21761-1012
R2176-101: TBE Issued - Fire And Gas Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21774-4012
R2177-401: TBE Issued - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-1021
R2178-102: TBE Issued - Conduit Pipe & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-1031
R2178-103: TBE Issued - Cable Transit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-2021
R2178-202: TBE Issued - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-203 R2178-
203: TBE Issued - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-2041
R2178-204: TBE Issued - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-3041
R2178-304 TBE Issued - Instrument Tube
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-3051-1
R2178-305: TBE Issued - Valve Manifold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-dd-21780-4011-2
R2178-401: TBE Issued - Air Pipe, Valve & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21780-6011-3
R2178-601: TBE Issued - Instrument Bulk Materials
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21800-0029
R2180-131: TBE Issued - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21800-1012
R2180-101: TBE Issued - Electrical Misc. Item
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21800-2301
R2180-111: TBE Issued - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21810-7013
R2181-701: TBE Issued - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21810-8090
R2181-212: TBE Issued - Indoor Dry Transformer
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21820-3200
R2182-211: TBE Issued - Local Control & Isolation Switch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21820-3500
R2182-221: TBE Issued - Local Distribution Panel & Motor Starter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21830-0220
R2183-211: TBE Issued - Lighting
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21830-0320
R2183-231: TBE Issued - LED light
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21860-0120
R2186-001: TBE Issued - CCTV
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DD-21880-6010
R2188-901: TBE Issued - Electrical Heat Trace
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13792-0050
A80/86/89/97: Instrument Loop Diagaram FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13792-0060
A80/86/89/97: Instrument Loop Diagaram Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13792-0070
A80/86/89/97: Instrument Loop Diagaram FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13792-1100
A81/82/83/84/85/86/87: Instrument Loop Diagaram FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13792-1110
A81/82/83/84/85/86/87: Instrument Loop Diagaram Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13792-1120
A81/82/83/84/85/86/87: Instrument Loop Diagaram FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13793-1400
A80/81/82/83/84/85/86/87/89: ESD Logic Diagaram FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13793-1410
A80/81/82/83/84/85/86/87/89: ESD Logic Diagaram Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13793-1420
A80/81/82/83/84/85/86/87/89: ESD Logic Diagaram FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13810-1380
A86: One Line Diagram FC - SS100
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13810-1410
A86: One Line Diagram FC - SS400
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13810-1440
A89: One Line Diagram FC - SS600
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DG-13810-1900
Electrical Load List 2nd for PO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DL-12411-0108
Fire Risk Area Maps FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DL-12412-0330
Fire Water Coverage Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DL-12412-340 Detail
Dwgs - Spray Nozzle Arrangement Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DL-12412-350 Detail
Dwgs - Spray Nozzle Arrangement FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DL-13156-0010
Duct Bank Location Plan FR (000)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13513-3010
R2151-301: Major Vendor Documents Review - Desalter / Dehydrator
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13531-0014
R2153-101: Major Vendor Documents Review - AFC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13532-0044
R2153-201: Major Vendor Documents Review - S&T H/Ex (Clad)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13532-3010
R2153-301: Major Vendor Documents Review - Electrical Heater
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13560-0015
R2156-101: Major Vendor Documents Review - Hot Oil Furnace
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13570-0015
R2157-201: Major Vendor Documents Review - Flare
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13581-0104
R2158-101: Major Vendor Documents Review - Centrifugal Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13581-0124
R2158-103: Major Vendor Documents Review for API 610 Centrifugal Pumps
(Vertiacal Type)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13581-0144
R2158-104: Major Vendor Documents Review for Non-API Centrifugal Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13581-1020
R2158-102: Major Vendor Documents Review - API 610 Heavy Duty Centrifugal
Pumps PKG2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13581-1030
R2158-102: Major Vendor Documents Review - API 610 Heavy Duty Centrifugal
Pumps PKG1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13581-1051
R2158-105: Major Vendor Documents Review - Submersible Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13582-0014
R2158-201: Major Vendor Documents Review - Centrifugal Compressor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13582-0200
R2158-202: Major Vendor Documents Review - Air Compressors
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-0014
R215A-101: Major Vendor Documents Review - TEG Regeneration Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-0034
R215A-104: Major Vendor Documents Review - Flare Gas Recovery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-0044
R215A-201: Major Vendor Documents Review - Drinking Water Treatment Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-0054
R215A-202: Major Vendor Documents Review - Vacuum Deaerator Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-0134
R215A-901: Major Vendor Documents Review - Chemical Injection Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-5010
R215A-501: Major Vendor Documents Review - Air Dryers Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-6010
R215A-601: Major Vendor Documents Review - Nitrogen Generation Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-6020
R215A-602: Major Vendor Documents Review - Liquid N2 Storage & Vaporization
Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-8010
R215A-801: Major Vendor Documents Review - Water Oil Separation (WOSEP)
Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-8020
R215A-802: Major Vendor Documents Review - Waste Water Treatment Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-8030
R215A-102: Major Vendor Documents Review - Desalter/Dehydrator Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135A0-8040
R215A-104: Major Vendor Documents Review - TEG Off-Gas Recovery Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-135Z0-0010
R215Z-001: Major Vendor Documents Review - Fire Fighting and Safety Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13606-0014
R216G-501: Major Vendor Documents Review - Pressure Relief Valve
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13751-0110
R2175-101: Major Vendor Documents Review - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13751-5010
R2175-501: Major Vendor Documents Review - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13774-4410
R2177-401: Major Vendor Documents Review - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13810-3110
R2181-311 Major Vendor Document Review - 230kV GIS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13812-2350
R2181-211 Major Vendor Document Review - Power Transformer and NGR / Shut
Reactors
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-DO-13812-3100
R2181-213 Major Vendor Document Review - 230kV Transformer & Shut Reactor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21400-0212
R2140-006: TBE Issued - HVAC Control Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21400-0213
R2140-006: PO Placed - HVAC Control Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21400-0320
R2140-002: RFQ Issued - Pre-Engineered Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21400-0330
R2140-002: TBE Issued - Pre-Engineered Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21400-0340
R2140-002: PO Placed - Pre-Engineered Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21520-5014
R2152-501: TBE Issued - Equipment Platforms & Ladders
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21520-5015
R2152-501: PO Placed - Equipment Platforms & Ladders
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21532-3031
R2153-301: PO Placed - Electrical Heater
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21580-2064
R2158-104: PO Placed - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21580-2114
R2158-101: PO Placed - Centrifugal Pumps Process
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21580-2134
R2158-104: TBE Issued - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21580-2244
R2158-105: PO Placed - Submersible Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-215A0-9210
R215A-801: PO Placed - Water Oil Separation (WOSEP) Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-215A0-9230
R215A-101: PO Placed - TEG Regeneration Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1012
R216A-101: PO for 2nd MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1013
R216A-101: PO for 2.5th MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1014
R216A-101: PO for 3rd MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1022
R216A-102: PO for 2nd MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1023
R216A-102: PO for 2.5th MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1024
R216A-102: PO for 3rd MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1053
R216A-105: PO for AG Pipes 2.5th MTO - CSS Pipes Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1054
R216A-105: PO for AG Pipes 3rd MTO - CSS Pipes Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1152-2
R216A-115: TBE Issued - Grooved Mechanical Coupling Joints Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216A0-1152-3
R216A-115: PO Placed - Grooved Mechanical Coupling Joints Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216B0-0201
R216B-137: TBE Issued - Ball Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216B0-0210
R216B-137: PO Placed - Ball Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216B0-0261
R216B-142: TBE Issued - Dual Plate Check Valves (including Non-slam type)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216B0-0270
R216B-142: PO Placed - Dual Plate Check Valves (including Non-slam type)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216B0-0282
R216B-143: TBE Issued - Plug Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216B0-0283
R216B-143: PO Placed - Plug Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216B0-0350
R216B-152: PO Placed - CCS Valves Internally FBE Lined
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216C0-1612
R216C-161: PO for Fittings 2nd MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216C0-1613
R216C-161: PO for Fittings 2.5th MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216C0-1614
R216C-161: PO for Fittings 3rd MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216C0-1633
R216C-163: PO for Fittings 2.5th MTO - SS & Nickel Alloy Buttwelding Fittings
Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216C0-1634
R216C-163: PO for Fittings 3rd MTO - SS & Nickel Alloy Buttwelding Fittings
Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216C0-1642
R216C-164: PO for Fittings 2nd MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216C0-1643
R216C-164: PO for Fittings 2.5th MTO- Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216C0-1644
R216C-164: PO for Fittings 3rd MTO- Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216D0-1712
R216D-171: PO Flanges 2nd MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216D0-1713
R216D-171: PO Flanges 2.5th MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216D0-1714
R216D-171: PO Flanges 3rd MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0212
R216G-201: TBE Issued - Strainers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0213
R216G-201: PO Placed - Strainers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0221
R216G-202: TBE Issued - Static Mixers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0222
R216G-202: PO Placed - Static Mixers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0224
R216G-223: RFQ Issued - Mixing Tees
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0225
R216G-223: TBE Issued - Mixing Tees
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0226
R216G-223: PO Placed - Mixing Tees
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0231
R216G-203: RFQ Issued - Desuperheaters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0232
R216G-203: TBE Issued - Desuperheaters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0233
R216G-203: PO Placed - Desuperheaters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0242
R216G-206: TBE Issued - Power Traps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0243
R216G-206: PO Placed - Power Traps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0313
R216G-302: TBE Issued - Motor Operated Valves (Ball)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0314
R216G-302: PO Placed - Motor Operated Valves (Ball)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0318
R216G-307: TBE Issued - Axial Disc Check Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0323
R216G-303: TBE Issued - Motor Operated Valves (Butterfly)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0330
R216G-321: TBE Issued - Modular Double Block/Isolation and Bleed Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0332
R216G-322: TBE Issued - Auto Drain Valve
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0333
R216G-303: PO Placed - Motor Operated Valves (Butterfly)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0334
R216G-321: PO Placed - Modular Double Block/Isolation and Bleed Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0335
R216G-322: PO Placed - Auto Drain Valve
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0404
R216G-401: TBE Issued - Line Blanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0408
R216G-401: PO Placed - Line Blanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0510
R216G-501: TBE Issued - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0512
R216G-501: PO Placed - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0515
R216G-504: RFQ Issued - Restriction Orifices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0516
R216G-504: TBE Issued - Restriction Orifices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0518
R216G-505: TBE Issued - Level Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0519
R216G-506: RFQ Issued - Sight Glasses
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0520
R216G-506: TBE Issued - Sight Glasses
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0522
R216G-508: TBE Issued - Buckling Pin Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0550
R216G-506: PO Placed - Sight Glasses
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0552
R216G-508: PO Placed - Buckling Pin Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0556
R216G-504: PO Placed - Restriction Orifices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0558
R216G-505: PO Placed - Level Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0610
R216G-601: RFQ Issued - Sample Coolers and Sampling Systems
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0613
R216G-601: TBE Issued - Sample Coolers and Sampling Systems
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0621
R216G-603: RFQ Issued - Emergency Showers and Eye Washers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0622
R216G-603: TBE Issued - Emergency Showers and Eye Washers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0623
R216G-611: RFQ Issued - Flexible Metal Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0624
R216G-611: TBE Issued - Flexible Metal Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0625
R216G-612: RFQ Issued - Hoses and Hose Couplings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0626
R216G-612: TBE Issued - Hoses and Hose Couplings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0630
R216G-603: PO Placed - Emergency Showers and Eye Washers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0631
R216G-611: PO Placed - Flexible Metal Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0649
R216G-617: TBE Issued - Corrosion Coupons and Chemical Injections
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0650
R216G-617: PO Placed - Corrosion Coupons and Chemical Injections
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0651
R216G-619: RFQ Issued - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0652
R216G-619: TBE Issued - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0663
R216G-601: PO Placed - Sample Coolers and Sampling Systems
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216G0-0666
R216G-612: PO Placed - Hoses and Hose Couplings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216Z0-31601-2
R3160-001: TBE Issued - FBE Application for Piping and Piping Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-216Z0-31601-3
R3160-001: PO Placed - FBE Application for Piping and Piping Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3011
R2171-301: RFQ Issued - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3012
R2171-301: TBE Issued - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3013
R2171-301: PO Placed - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3032
R2171-302: RFQ Issued - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3042
R2171-302: TBE Issued - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3043
R2171-302: PO Placed - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3062
R2171-401: RFQ Issued- Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3072
R2171-401: TBE Issued - Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21710-3082
R2171-401: PO Placed- Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21731-0111
R2173-101: RFQ Issued - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21731-0112
R2173-101: TBE Issued - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21731-0113
R2173-101: PO Placed - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2043
R2173-204: TBE Issued - Ultrasonic Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2044
R2173-204: PO Placed - Ultrasonic Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2111
R2173-202: TBE Issued - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2112
R2173-202: PO Placed - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2141
R2173-205: TBE Issued - Coriolis Type Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2143
R2173-208: TBE Issued - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2144
R2173-208: PO Placed - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2146
R2173-302: RFQ Issued - Radar Type Level Instruments (GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-21466
R2173-302: TBE Issued - Radar Type Level Instruments (GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2147
R2173-302: PO Placed - Radar Type Level Instruments (GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2149
R2173-502: RFQ Issued - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2150
R2173-502: TBE Issued - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2151
R2173-205: PO Placed - Coriolis Type Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2157
R2173-502: PO Placed - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2170
R2173-501: RFQ Issued - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2171
R2173-501: TBE Issued - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21733-2180
R2173-501: PO Placed - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21736-6042
R2173-602: TBE Issued - Venturi Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21736-6051
R2173-602: PO Placed - Venturi Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21736-6081
R2173-601: TBE Issued - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21736-6091
R2173-601: PO Placed - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4021
R2174-101: RFQ Issued - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4031
R2174-101: TBE Issued - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4032
R2174-101: PO Placed - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4041
R2174-201: RFQ Issued - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4051
R2174-201: TBE Issued - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4052
R2174-201: PO Placed - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4071
R2174-202: RFQ Issued - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4081
R2174-202: TBE Issued - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4082
R2174-202: PO Placed - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4111
R2174-401: TBE Issued - Pressure Regulators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21741-4121
R2174-401: PO Placed - Pressure Regulators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21751-0111
R2175-101: RFQ Issued - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21751-0112
R2175-101: TBE Issued - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21751-0113
R2175-101: PO Placed - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21751-5012
R2175-501: TBE Issued - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21751-5013
R2175-501: PO Placed - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21761-1011
R2176-101: RFQ Issued - Fire And Gas Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21761-1012
R2176-101: TBE Issued - Fire And Gas Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21761-1013
R2176-101: PO Placed - Fire And Gas Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21774-4011
R2177-401: RFQ Issued - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21774-4012
R2177-401: TBE Issued - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21774-4013
R2177-401: PO Placed - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-1021-13
R2178-102: RFQ Issued - Conduit Pipe & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-1021-2
R2178-102: TBE Issued - Conduit Pipe & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-1021-3
R2178-102: PO Placed - Conduit Pipe & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-1031-2
R2178-103: RFQ Issued - Cable Transit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-1031-3
R2178-103: TBE Issued - Cable Transit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-1031-4
R2178-103: PO Placed - Cable Transit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2011-2
R2178-201: RFQ Issued - Instrument Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2011-3
R2178-201: TBE Issued - Instrument Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2021-2
R2178-202: RFQ Issued - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2021-3
R2178-202: TBE Issued - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2021-4
R2178-202: PO Placed - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-203-2
R2178-203: RFQ Issued - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-203-3
R2178-203: TBE Issued - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-203-4
R2178-203: PO Placed - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2041-2
R2178-204: RFQ Issued - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2041-3
R2178-204: TBE Issued - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-2041-4
R2178-204: PO Placed - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-3041-2
R2178-304: RFQ Issued - Instrument Tube
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-3041-3
R2178-304: TBE Issued - Instrument Tube
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-3041-4
R2178-304: PO Placed - Instrument Tube
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-3051-2
R2178-305: RFQ Issued - Valve Manifold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-3051-3
R2178-305: TBE Issued - Valve Manifold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-3051-4
R2178-305: PO Placed - Valve Manifold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-4011-2
R2178-401: RFQ Issued - Air Pipe, Valve & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-4011-3
R2178-401: TBE Issued - Air Pipe, Valve & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-4011-5
R2178-401: PO Placed - Air Pipe, Valve & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-6011-2
R2178-601: RFQ Issued - Instrument Bulk Materials
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-6011-3
R2178-601: TBE Issued - Instrument Bulk Materials
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21780-6011-4
R2178-601: PO Placed - Instrument Bulk Materials
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21800-0029
R2180-131: TBE Issued - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21800-0030
R2180-131: PO Placed- Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21800-1010
R2180-101: RFQ Issued - Electrical Misc. Item
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21800-1011
R2180-101: TBE Issued - Electrical Misc. Item
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21800-1012
R2180-101: PO Placed- Electrical Misc. Item
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21800-2301
R2180-111: TBE Issued - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21800-2401
R2180-111: PO Placed- Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21810-7012
R2181-701: RFQ Issued - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21810-7013
R2181-701: TBE Issued - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21810-7014
R2181-701: PO Placed - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21810-8030
R2181-801: PO Placed - PSA
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21810-8070
R2181-212: TBE Issued - Indoor Dry Transformer
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21810-8080
R2181-212: PO Placed - Indoor Dry Transformer
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21810-8090
R2181-501: PO Placed - AC UPS/DC Charger
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21820-3200
R2182-211: TBE Issued - Local Control & Isolation Switch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21820-3220
R2182-211: PO Placed- Local Control & Isolation Switch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21820-3400
R2182-221: RFQ Issued - Local Distribution Panel & Motor Starter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21820-3500
R2182-221: TBE Issued - Local Distribution Panel & Motor Starter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21820-3510
R2182-221: PO Placed- Local Distribution Panel & Motor Starter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21830-0220
R2183-211: TBE Issued - Lighting
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21830-0230
R2183-211: PO Placed - Lighting
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21830-0320
R2183-231: TBE Issued - LED light
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21830-0330
R2183-231: PO Placed - LED light
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21830-4200
R2183-101: PO Placed- Outdoor Distribution Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21860-0120
R2186-001: TBE Issued - Telecom System Equipment (CCTV)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21860-0121
R2186-001: PO Placed - Telecom System Equipment (CCTV)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21880-4000
R2188-901: RFQ Issued - Electrical Heat Trace
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EA-21880-6000
R2188-901: PO Placed - Electrical Heat Trace
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-0060
R2140-003: Vendor Design (NMR601) - HVAC Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-0070
R2140-003: Vendor Document (NMR602) - HVAC Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-0160
R2140-004: Vendor Design (NMR601) - HVAC Distribution Panel for Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-0220
R2140-006: Vendor Design (NMR601) - HVAC Control Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-0230
R2140-004: Vendor Document (NMR602) - HVAC Distribution Panel for Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-0280
R2140-006: Vendor Document(NMR602) - HVAC Control Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-0290
R2140-002: Vendor Design (NMR601) - Pre-Engineered Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-0300
R2140-002: Vendor Document (NMR602) - Pre-Engineered Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-2300
R2140-001: Vendor Design (NMR601) - Precast Concrete Materials for Building
Wall & Floor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21400-2400
R2140-001: Vendor Info. (NMR602) - Precast Concrete Materials for Building
Wall & Floor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21510-3010
R2151-301: Key Vendor Info. NMR601 Received - Desalter / Dehydrator
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21510-3011
R2151-301: Key Vendor Info. NMR601 Received - LPPT
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21510-3012
R2151-301: Key Vendor Info. NMR602 Received - Desalter / Dehydrator
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21510-3110
R2151-301: Key Vendor Info. NMR601 Received - Drums
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21510-3140
R2151-301: Key Vendor Info. NMR602 Received - LPPT
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21531-1011
R2153-101: Key Vendor Info. NMR601 Received - AFC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21531-1012
R2153-101: Key Vendor Info. NMR602 Received - AFC
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21531-5011
R2151-501: Key Vendor Info. NMR601 Received - Filters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21531-5012
R2151-501: Key Vendor Info. NMR602 Received - Filters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21532-2010
R2153-201: Key Vendor Info. NMR601 Received - S&T H/Ex (Clad)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21532-2011
R2153-201: Key Vendor Info. NMR602 Received - S&T H/Ex (Clad)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21532-3010
R2153-301: Key Vendor Info. NMR601 Received - Electrical Heater
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21532-3011
R2153-301: Key Vendor Info. NMR602 Received - Electrical Heater
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21532-3040
R2153-202: Key Vendor Info. NMR601 Received - S&T H/Ex (CS)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21532-3041
R2153-202: Key Vendor Info. NMR602 Received - S&T H/Ex (CS)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21550-0460
R2155-501: Key Vendor Info. NMR601 Received - OVHD Crane / Hoist
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21550-0461
R2155-501: Key Vendor Info. NMR602 Received - OVHD Crane / Hoist
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21560-0061
R2156-101: Key Vendor Info. NMR602 Received - Hot Oil Furnace
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21570-0060
R2157-201: Key Vendor Info. NMR601 Received - Flare & Burn Pit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21570-0061
R2157-201: Key Vendor Info. NMR602 Received - Flare & Burn Pit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1011
R2158-101: Key Vendor Info. NMR601 Received - Centrifugal Pumps Utility
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1012
R2158-101: Key Vendor Info. NMR602 Received - Centrifugal Pumps Utility
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1020
R2158-102: Key Vendor Info. NMR601 Received - WIP
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1028
R2158-102: Key Vendor Info. NMR602 Received - WIP
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1031
R2158-103: Key Vendor Info. NMR601 Received - High Speed Integrally Geared
Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1032
R2158-103: Key Vendor Info. NMR602 Received - High Speed Integrally Geared
Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1041
R2158-104: Key Vendor Info. NMR601 Received - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1042
R2158-104: Key Vendor Info. NMR602 Received - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1051
R2158-105: Key Vendor Info. NMR601 Received - Submersible Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1111
R2158-101: Key Vendor Info. NMR601 Received - Centrifugal Pumps Process
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1112
R2158-101: Key Vendor Info. NMR602 Received - Centrifugal Pumps Process
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1121
R2158-102: Key Vendor Info. NMR601 Received - Heavy Duty Centrifugal Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-1122
R2158-102: Key Vendor Info. NMR602 Received - Heavy Duty Centrifugal Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-2011
R2158-201: Key Vendor Info. NMR601 Received - API617 Centrifugal Compressor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-2012
R2158-201: Key Vendor Info. NMR602 Received - API617 Centrifugal Compressor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-2020
R2158-202: Key Vendor Info. NMR601 Received - Air Compressors
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21580-2021
R2158-202: Key Vendor Info. NMR602 Received - Air Compressors
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-1010
R215A-101: Key Vendor Info. NMR601 Received - TEG Regeneration Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-1011
R215A-101: Key Vendor Info. NMR602 Received - TEG Regeneration Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-1030
R215A-103: Key Vendor Info. NMR601 Received - Flare Gas Recovery Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-1031
R215A-103: Key Vendor Info. NMR602 Received - Flare Gas Recovery Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-2011
R215A-201: Key Vendor Info. NMR602 Received - Drinking Water Treatment
Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-2020
R215A-202: Key Vendor Info. NMR601 Received - Vacuum Deaerator Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-2021
R215A-202: Key Vendor Info. NMR602 Received - Vacuum Deaerator Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-5010
R215A-501: Key Vendor Info. NMR601 Received - Instrument/Utility Air Dryer
Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-5011
R215A-501: Key Vendor Info. NMR602 Received - Instrument/Utility Air Dryer
Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-6010
R215A-601: Key Vendor Info. NMR601 Received - Nitrogen Generation Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-6011
R215A-601: Key Vendor Info. NMR602 Received - Nitrogen Generation Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-6020
R215A-602: Key Vendor Info. NMR601 Received - Liquid N2 Storage &
Vaporization Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-6021
R215A-602: Key Vendor Info. NMR602 Received - Liquid N2 Storage &
Vaporization Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-8011
R215A-801: Key Vendor Info. NMR602 Received - Water Oil Separation (WOSEP)
Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-8020
R215A-802: Key Vendor Info. NMR601 Received - Waste Water Treatment Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-8021
R215A-802: Key Vendor Info. NMR602 Received - Waste Water Treatment Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-9001
R215A-801: Key Vendor Info. NMR601 Received - Water Oil Separation (WOSEP)
Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-9010
R215A-901: Key Vendor Info. NMR601 Received - Chemical Injection Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-9011
R215A-901: Key Vendor Info. NMR602 Received - Chemical Injection Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-9120
R215A-102: Key Vendor Info. NMR601 Received - Desalter/Dehydrator Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-9130
R215A-102: Key Vendor Info. NMR602 Received - Desalter/Dehydrator Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-9150
R215A-104: Key Vendor Info. NMR601 Received - TEG Off-Gas Recovery Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215A0-9160
R215A-104: Key Vendor Info. NMR602 Received - TEG Off-Gas Recovery Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215Z0-0010
R215Z-001: Key Vendor Info. NMR601 Received - Fire Fighting and Safety
Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-215Z0-0011
R215Z-001: Key Vendor Info. NMR602 Received - Fire Fighting and Safety
Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-216G0-0501A
R216G-501: Advance Info. - Pressure Relief Valves (Dimension only for 60%
Modeling)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-216G0-1501
R216G-501: Key Vendor Info. NMR601 Received - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-216G0-2501
R216G-501: Key Vendor Info. NMR602 Received - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21710-0011
R2171-101: Key Vendor Info. NMR601 Received - PCS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21710-0012
R2171-101: Key Vendor Info. NMR602 Received - PCS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21710-3010
R2171-301: Key Vendor Info. NMR601 Received - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21710-3011
R2171-301: Key Vendor Info. NMR602 Received - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21710-3030
R2171-401: Key Vendor Info. NMR601 Received - Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21710-3031
R2171-401: Key Vendor Info. NMR602 Received - Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21710-3040
R2171-302: Key Vendor Info. NMR601 Received - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21710-3041
R2171-302: Key Vendor Info. NMR602 Received - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21731-1010
R2173-101: Key Vendor Info. NMR601 Received - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21731-1011
R2173-101: Key Vendor Info. NMR602 Received - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2040
R2173-204: Key Vendor Info. NMR601 Received - Ultrasonic Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2041
R2173-204: Key Vendor Info. NMR602 Received - Ultrasonic Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2111
R2173-202: Key Vendor Info. NMR601 Received - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2112
R2173-202: Key Vendor Info. NMR602 Received - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2131
R2173-205: Key Vendor Info. NMR601 Received - Coriolis Type Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2141
R2173-205: Key Vendor Info. NMR602 Received - Coriolis Type Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2152
R2173-208: Key Vendor Info. Received - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2153
R2173-208: V-doc FC - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2155
R2173-302: Key Vendor Info. NMR601 Received -Radar Type Level Instruments
(GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2156
R2173-302: Key Vendor Info. NMR602 Received - Radar Type Level Instruments
(GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2158
R2173-502: Key Vendor Info. NMR 601 Received - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2159
R2173-502: Key Vendor Info. NMR 602 Received - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2170
R2173-501: Key Vendor Info. NMR 601 Received - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21733-2180
R2173-501: Key Vendor Info. NMR 602 Received - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21736-6021
R2173-602: Vendor Design (Dimension only for 60% Modeling)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21736-6022
R2173-602: Key Vendor Info. NMR601 Received - Venturi tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21736-6023
R2173-602: Key Vendor Info. NMR602 Received - Venturi tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21736-6051
R2173-601: Key Vendor Info. NMR601 Received - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21736-6061
R2173-601: Key Vendor Info. NMR602 Received - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-1021
R2174-201: Advance Info. - On-Off Valves (Dimension only for 60% Modeling)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4011
R2174-101: Advance Info. - Control Valves (Dimension only for 60% Modeling)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4012
R2174-101: Key Vendor Info. NMR601 Received - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4013
R2174-101: Key Vendor Info. NMR602 Received - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4023
R2174-202: Advance Info. - On-Off Valves (Dimension only for 60% Modeling)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4033
R2174-201: Key Vendor Info. NMR601 Received - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4034
R2174-201: Key Vendor Info. NMR602 Received - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4053
R2174-202: Key Vendor Info. NMR601 Received - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4054
R2174-202: Key Vendor Info. NMR 602 Received - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4083
R2174-401: Key Vendor Info. NMR601 Received - Pressure Regulators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21741-4084
R2174-401: Key Vendor Info. NMR602 Received - Pressure Regulators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21751-0110
R2175-101: Key Vendor Info. NMR601 Received - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21751-0111
R2175-101: Key Vendor Info. NMR602 Received - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21751-5010
R2175-501: Key Vendor Info. NMR601 Received - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21751-5011
R2175-501: Key Vendor Info. NMR602 Received - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21761-1010
R2176-101: Key Vendor Info. NMR601 Received - Fire Gas Detection Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21761-1011
R2176-101: Key Vendor Info. NMR602 Received - Fire Gas Detection Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21774-4010
R2177-401: Key Vendor Info. NMR601 Received - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21774-4011
R2177-401: Key Vendor Info. NMR602 Received - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-0160
R2181-211: Key Vendor Info. NMR601 Received - Transformers & NGR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-0161
R2181-211: Key Vendor Info. NMR602 Received - Transformers & NGR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-0360
R2181-213: Key Vendor Info. NMR601 Received - 230kV Transformer & Shut
Reactor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-0361
R2181-213: Key Vendor Info. NMR602 Received - 230kV Transformer & Shut
Reactor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-2130
R2181-311 Key Vendor Info. NMR601 Received - 230kV GIS and Receiving
Facilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-2131
R2181-311 Key Vendor Info. NMR602 Received - 230kV GIS and Receiving
Facilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-4410
R2181-411: Key Vendor Info. NMR601 Received - LV Switchgear and Controlgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-4411
R2181-411: Key Vendor Info. NMR602 Received - LV Switchgear and Controlgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-4480
R2181-431: Key Vendor Info. NMR601 Received - 4.16kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-4481
R2181-431: Key Vendor Info. NMR602 Received - 4.16kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-4500
R2181-441: Key Vendor Info. NMR601 Received - 13.8kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-4501
R2181-441: Key Vendor Info. NMR602 Received - 13.8kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-5010
R2181-501: Key Vendor Info. NMR601 Received - AC UPS/DC Charger
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-5011
R2181-501: Key Vendor Info. NMR602 Received - AC UPS/DC Charger
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-5020
R2181-121: Key Vendor Info. NMR601 Received - Diesel Generators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-5021
R2181-121: Key Vendor Info. NMR602 Received - Diesel Generators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-6010
R2181-611: Key Vendor Info. NMR601 Received - Cable Bus
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-6011
R2181-611: Key Vendor Info. NMR602 Received - Cable Bus
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-7010
R2181-701: Key Vendor Info. NMR601 Received - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-7011
R2181-701: Key Vendor Info. NMR602 Received - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-7022
R2181-801: Key Vendor Info. NMR601 Received - PSA
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-7023
R2181-801: Key Vendor Info. NMR602 Received - PSA
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-7042
R2181-212: Key Vendor Info. NMR601 Received - Indoor Dry Transformer
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-ED-21810-7052
R2181-212: Key Vendor Info. NMR602 Received - Indoor Dry Transformer
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21400-0001
R2140-001: Material Procurement & Fabrication - Precast Concrete Materials
for Building Wall & Floor - SS100 (B310)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21400-0002
R2140-001: 1st Delivery - Precast Concrete Materials for Building Wall &
Floor - SS100
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21400-0010
R2140-002: Material Procurement & Fabrication - Pre-Engineered Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21400-0090
R2140-003: Material Procurement & Fabrication 1st - HVAC Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21400-0170
R2140-004: Material Procurement & Fabrication - HVAC Distribution Panel for
Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21400-0250
R2140-006: Material Procurement & Fabrication - HVAC Control Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3011
R2151-301: Manufacturing - Desalter / Dehydrator (A340 - 2nd Batch) *Longest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3011A
R2151-301: Manufacturing - Desalter / Dehydrator (A240 - 1st Batch)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3011B
R2151-301: Manufacturing - Desalter / Dehydrator (A240 - 2nd Batch)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3011C
R2151-301: Manufacturing - Desalter / Dehydrator (A340 - 1st Batch)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3012
R2151-301: Manufacturing - LPPT (A220)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-30123
R2151-301: Manufacturing - LPPT (A320)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013
R2151-301: Manufacturing - Drums - ETA in NOV (B120) * Shortest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013A
R2151-301: Manufacturing - Drums - ETA in DEC (B120,C120)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013B
R2151-301: Manufacturing - Drums - ETA in JAN (A520,A530)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C
R2151-301: Manufacturing - Drums - ETA in FEB (A220,A320, A520,A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C1
A83-D-0007 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C2
A83-D-0012A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C3
A83-D-0012B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013C4
A83-D-0020 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013D
R2151-301: Manufacturing - Drums - ETA in MAR (A260,A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013E
R2151-301: Manufacturing - Drums - ETA in APR (A260,A430,A530,A540,A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013E1
A86-D-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3013E2
A86-D-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-3014
R2151-301: Manufacturing - WOSEP (B250)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011
R2151-501: Manufacturing and Delivery - Filters - 2nd Batch (A420 & A430) *
Longest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-A
A86-D-0002A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-B
A86-D-0002B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-C
A86-D-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-D
A86-D-0005A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-E
A86-D-0005B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-F
A86-D-0006A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-G
A86-D-0006B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-H
A86-D-0008A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-I
A86-D-0008B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-J
A86-D-0009A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011-K
A86-D-0009B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A
R2151-501: Manufacturing and Delivery - Filters - 1st Batch (A520, A550 &
B130)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A1
A83-D-0009 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A2
A83-D-0010A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A3
A83-D-0010B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A4
A83-D-0013A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A5
A83-D-0013B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A6
A83-D-0014A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A7
A83-D-0014B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A8
A83-D-0019A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5011A9
A83-D-0019B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021
R2151-301: Manufacturing - Drums - ETA in MAY (A530,A540,A550) * Longest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-A
A83-D-0102 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-B
A83-D-0103 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-C
A83-D-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-D
A83-D-0106 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-E
A83-D-0201 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-F
A83-D-0202 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-G
A83-D-0203 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-H
A83-D-0204 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-J
A83-D-0206 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-K
A83-D-0101 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-M
A83-D-0107 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-N
A83-D-0108 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-O
A83-D-0207 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-P
A83-D-0208 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Q
A83-D-0021 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-R
A83-D-0111 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-S
A83-D-0112 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-T
A83-D-0120 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-U
A83-D-0121 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-V
A83-D-0122 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-W
A83-D-0123 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-X
A83-D-0211 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Y
A83-D-0212 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021-Z
A83-D-0220 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZA
A83-D-0221 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZB
A83-D-0222 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21510-5021ZC
A83-D-0223 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21520-5016
R2152-501: Manufacturing - Equipment Platforms & Ladders
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079
R2153-101: Manufacturing and Delivery - AFC - 2nd Batch (A530 & A550) *
Longest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-A
A83-E-0107 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-B
A83-E-0112A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-C
A83-E-0112C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-D
A83-E-0112E/F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-E
A83-E-0112G/H - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-F
A83-E-0207 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-G
A83-E-0212A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-H
A83-E-0212C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-J
A83-E-0212E/F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079-K
A83-E-0212G/H - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079A
R2153-101: Manufacturing and Delivery - AFC - 1st Batch (A430)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079A1
A86-E-0001A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21531-0079A2
A86-E-0001C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2010
R2153-201: Manufacturing - S&T H/Ex (Clad) - 2nd Batch (A320 & A340) *
Longest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A
R2153-202: Manufacturing and Delivery - S&T H/Ex (CS) - 1st Batch (A540)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A1
A83-E-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A2
A83-E-0105 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A3
A83-E-0106 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A4
A83-E-0204 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A5
A83-E-0205 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-2031A6
A83-E-0206 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-3010
R2153-301: Manufacturing - Electrical Heater
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21532-32010A
R2153-201: Manufacturing - S&T H/Ex (Clad) - 1st Batch (A220 & A240)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21550-0470
R2155-501: Manufacturing - OVHD Crane / Hoist
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21560-0070A
R2156-101: Manufacturing - Hot Oil Furnace - 1st Batch (A86-F-0001A Floor
Panel)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21570-0070
R2157-201: Manufacturing - Flare & Burn Pit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1011
R2158-101: Manufacturing - Centrifugal Pumps Utility - 1st Batch (B120) *
Shortest
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1011A
R2158-101: Manufacturing - Centrifugal Pumps Utility - 2nd Batch (B120)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1020
R2158-102: Manufacturing - WIP - Last Pump
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1020A
R2158-102: Manufacturing - WIP - 1st Pump
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1020B
R2158-102: Manufacturing - WIP - 2nd Pump
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1020C
R2158-102: Manufacturing - WIP - 3rd Pump
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021
R2158-102: Manufacturing/Shipping - Heavy Duty Centrifugal Pumps (A430)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-A
A86-G-0002A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-B
A86-G-0002B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-C
A86-G-0002C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-D
A86-G-0003A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-E
A86-G-0003B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-F
A86-G-0004A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-G
A86-G-0004B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-H
A86-G-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-I
A86-G-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-J
A86-G-0001C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-K
A86-G-0001D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-L
A86-G-0001E - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021-M
A86-G-0001F - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1021A
R2158-102: Manufacturing/Shipping - Heavy Duty Centrifugal Pumps (A620)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1041
R2158-104: Manufacturing - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1051
R2158-105: Manufacturing - Submersible Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112
R2158-101: Manufacturing - Centrifugal Pumps Process - 1st Batch
(A240,A340,A520,A530,A550 & A620)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112-1
A83-G-0020A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112-2
A83-G-0020B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A
R2158-101: Manufacturing - Centrifugal Pumps Process - 2nd Batch
(A220,A230,A240,A260,A320,A330,A340,A520,A530,A620&C110
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A1
A84-G-0091A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A2
A84-G-0091B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A3
A84-G-0092A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112A4
A84-G-0092B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AA
A84-G-0020A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AB
A84-G-0020B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AC
A84-G-0020C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AD
A84-G-0020D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AE
A84-G-0021A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AF
A84-G-0021B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AG
A84-G-0021C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1112AH
A84-G-0021D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1114
R2158-101: Manufacturing - Centrifugal Pumps Process - 3rd Batch
(A230,A260,A330,A420&C110)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-1
A83-G-0006A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-2
A83-G-0006B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-3
A83-G-0006C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-1122-6
A83-U-0010 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-2011
R2158-201: Manufacturing - API617 Centrifugal Compressor (ATM@A530)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-2011B
R2158-201: Manufacturing - API617 Centrifugal Compressor (HP@A530)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-2012B
R2158-201: Manufacturing - API617 Centrifugal Compressor (C3@A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21580-2020
R2158-202: Manufacturing - Air Compressors
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010
R215A-101: Manufacturing - TEG Regeneration Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-1
A83-C-0001 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-2
A83-D-0008 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-3
A83-E-0001 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-4
A83-U-0001-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1010-5
A83-U-0001-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-1030
R215A-103: Manufacturing - Flare Gas Recovery Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-2010
R215A-201: Manufacturing - Drinking Water Treatment Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-2020
R215A-202: Manufacturing - Vacuum Deaerator Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-5010
R215A-501: Manufacturing - Instrument/Utility Air Dryer Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-6010
R215A-601: Manufacturing - Nitrogen Generation Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-6020
R215A-602: Manufacturing - Liquid N2 Storage & Vaporization Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-8010
R215A-801: Manufacturing - Water Oil Separation (WOSEP) Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-8020
R215A-802: Manufacturing - Waste Water Treatment Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010
R215A-901: Manufacturing - Chemical Injection Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-1
A83-U-0005 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-2
A83-U-0006 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-3
A83-D-0031 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-4
A83-D-0032 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-5
A83-U-0003-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-6
A83-U-0003-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-7
A83-U-0003-SKID-3 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-8
A83-U-0003-SKID-4 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9010-9
A83-U-0004-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901010
A83-U-0004-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901011
A81-D-0018 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901012
A81-U-0003 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901013
A81-U-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901014
A81-U-0006 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901015
A81-U-0007 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901016
A84-D-0030 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901017
A84-D-0035 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901018
A84-U-0004 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-901019
A84-U-0005 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9020
R215A-102: Manufacturing - Desalter/Dehydrator internal - 1st Batch (GOSP-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9030
R215A-104: Manufacturing - TEG Off-Gas Recovery Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9030-1
A83-U-0002-SKID-1 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9030-2
A83-U-0002-SKID-2 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-215A0-9040
R215A-102: Manufacturing - Desalter/Dehydrator internal - Last Batch (GOSP-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1011
R216A-101: Manufacturing for 1st MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1012
R216A-101: Manufacturing for 2nd MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1013
R216A-101: Manufacturing for 2.5th MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1014
R216A-101: Manufacturing for 3rd MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1021
R216A-102: Manufacturing for 1st MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1022
R216A-102: Manufacturing for 2nd MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1023
R216A-102: Manufacturing for 2.5th MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1052
R216A-105: Manufacturing for 2nd MTO - CSS Pipes Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1053
R216A-105: Manufacturing for 2.5th MTO - CSS Pipes Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1054
R216A-105: Manufacturing for 3rd MTO - CSS Pipes Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1104
R216A-110: Manufacturing - PVC Pipes and Piping Components Incl. PVC Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1151
R216A-115: Manufacturing - Grooved Mechanical Coupling Joints Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-1161
R216A-116: Manufacturing - Weld Overlay Application for Piping Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216A0-116SF
R216A-116: Fabrication - Shop Spool for Weld Overlay Piping
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216B0-0137
R216B-137: Manufacturing - Ball Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216B0-0139
R216B-139: Manufacturing - Butterfly Valves (Resilient Lined)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216B0-0140
R216B-140: Manufacturing - Butterfly Valves (Eccentric Design)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216B0-0142
R216B-142: Manufacturing - Dual Plate Check Valves (including Non-slam type)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216B0-0143
R216B-143: Manufacturing - Plug Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216B0-0144
R216B-144: Manufacturing - Bronze Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216B0-0152
R216B-152: Manufacturing - CCS Valves Internally FBE Lined
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216B0-1311
R216B-131: Manufacturing - CCS and LTCS Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1611
R216C-161: Manufacturing for 1st MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1612
R216C-161: Manufacturing for 2nd MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1613
R216C-161: Manufacturing for 2.5th MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1614
R216C-161: Manufacturing for 3rd MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1632
R216C-163: Manufacturing for 2nd MTO - SS & Nickel Alloy Buttwelding Fittings
Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1633
R216C-163: Manufacturing for 2.5th MTO - SS & Nickel Alloy Buttwelding
Fittings Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1634
R216C-163: Manufacturing for 3rd MTO - SS & Nickel Alloy Buttwelding Fittings
Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1641
R216C-164: Manufacturing for 1st MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1642
R216C-164: Manufacturing for 2nd MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1643
R216C-164: Manufacturing for 2.5th MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216C0-1644
R216C-164: Manufacturing for 3rd MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216D0-1711
R216D-171: Manufacturing - Flanges 1st MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216D0-1712
R216D-171: Manufacturing - Flanges 2nd MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216D0-1713
R216D-171: Manufacturing - Flanges 2.5th MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216D0-1714
R216D-171: Manufacturing - Flanges 3rd MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216D0-1720
R216D-171: Manufacturing - Flanges w/ Weld Overlay
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216E0-0181
R216E-181: Manufacturing - Bolts and Nuts
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0202
R216G-202: Manufacturing - Static Mixers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0203
R216G-203: Manufacturing - Desuperheaters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0206
R216G-206: Manufacturing - Power Traps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0223
R216G-223: Manufacturing - Mixing Tees
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0302
R216G-302: Manufacturing - Motor Operated Valves (Ball)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0303
R216G-303: Manufacturing - Motor Operated Valves (Butterfly)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0307
R216G-307: Manufacturing - Axial Disc Check Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0321
R216G-321: Manufacturing - Modular Double Block/Isolation and Bleed Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0322
R216G-322: Manufacturing - Auto Drain Valve
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0401
R216G-401: Manufacturing - Line Blanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0501
R216G-501: Manufacturing - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0504
R216G-504: Manufacturing - Restriction Orifices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0505
R216G-505: Manufacturing - Level Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0506
R216G-506: Manufacturing - Sight Glasses
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0508
R216G-508: Manufacturing - Buckling Pin Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0601
R216G-601: Manufacturing - Sample Coolers and Sampling Systems
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0603
R216G-603: Manufacturing - Emergency Showers and Eye Washers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0611
R216G-611: Manufacturing - Flexible Metal Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0612
R216G-612: Manufacturing - Hoses and Hose Couplings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0617
R216G-617: Manufacturing - Corrosion Coupons and Chemical Injections
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216G0-0619
R216G-619: Manufacturing - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216K0-0705
R216K-705: Manufacturing - Vibration Isolation Pads
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-216K0-0801
R216K-801: Manufacturing - Plates for Piping Supports
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0050
R2171-101: PCS Design : Early Engineering
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0050M
R2171-101: Material Order & Delivery (BOM Batch-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0051
R2171-101: PDR Input - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0052
R2171-101: PDR Input - PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0060
R2171-101: PCS Design / Hardware Freeze (PDR Completion) - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0061
R2171-101: PCS Design / Hardware Freeze (PDR Completion) - PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0062
R2171-101: Cabinet Prototype Review & Freeze
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0069
R2171-101: Cabinet Integration & Staging
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0069A
R2171-101: Hardware FAT - PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0069B
R2171-101: Hardware FAT - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0070
R2171-101: CDR Input
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0080
R2171-101: PCS Design / Software Typicals & Freeze on Cloud
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0089
R2171-101: PCS Design / CDR Bulk Generation on Cloud
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0090
R2171-101: Software Freeze (CDR Completion) on Cloud
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0100
R2171-101: Software Test on Cloud
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0120
R2171-101: Software FAT on Cloud - PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0150
R2171-101: Software IFAT on Cloud - PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0220
R2171-101: Software FAT on Cloud - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-0230
R2171-101: Software IFAT on Cloud - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-3010
R2171-301: Manufacturing - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21710-3020
R2171-302: Manufacturing - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21731-0115
R2173-101: Manufacturing - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21733-2040
R2173-204: Manufacturing - Ultrasonic Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21733-2081
R2173-202: Manufacturing - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21733-2091
R2173-205: Manufacturing - Coriolis Type Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21733-2092
R2173-208: Manufacturing - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21733-2093
R2173-302: Manufacturing - Radar Type Level Instruments (GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21733-2094
R2173-502: Manufacturing - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21733-2104
R2173-501: Manufacturing - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21736-6021
R2173-602: Manufacturing - Venturi Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21736-6031
R2173-601: Manufacturing - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21741-1021
R2174-201: Manufacturing - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21741-4010
R2174-101: Manufacturing - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21741-4021
R2174-202: Manufacturing - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21741-4031
R2174-401: Manufacturing - Pressure Regulators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21751-5010
R2175-501: Manufacturing - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21761-0110
R2176-101: Manufacturing - Fire And Gas Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21774-0110
R2177-401: Manufacturing - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-1021
R2178-102: Manufacturing - Conduit Pipe & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-1031
R2178-103: Manufacturing - Cable Transit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-2012
R2178-201: Manufacturing for 2nd MTO - Instrument Cables
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-2013
R2178-201: Manufacturing for 3rd MTO - Instrument Cables
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-2021
R2178-202: Manufacturing for 1st MTO - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-2022
R2178-202: Manufacturing for 2nd MTO - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-2023
R2178-202: Manufacturing for 3rd MTO - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-2031
R2178-203: Manufacturing - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-2041
R2178-204: Manufacturing - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-3051
R2178-305: Manufacturing - Valve Manifold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-4011
R2178-401: Manufacturing - Air Pipe, Valve & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21780-6011
R2178-601: Manufacturing - Instrument Bulk Materials
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21800-0070
R2180-101: Manufacturing - Electrical Misc. Item
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21800-0072
R2180-131: Manufacturing - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21800-7001
R2180-111: Manufacturing - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-0170
R2181-211: Manufacturing - Transformers & NGR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-0370
R2181-213: Manufacturing - 230kV Transformer & Shut Reactor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-2130
R2181-311: Manufacturing - 230kV GIS and Receiving Facilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-5020
R2181-431: Manufacturing - 4.16kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-5030
R2181-441: Manufacturing - 13.8kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-6010
R2181-611: Manufacturing - Cable Bus
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-7010
R2181-701: Manufacturing - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-7020
R2181-801: Manufacturing - PSA
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21810-7030
R2181-212: Manufacturing - Indoor Dry Transformer
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21820-6013
R2182-601: Manufacturing for 3rd MTO - Power and Control Cables
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21820-7300
R2182-211: Manufacturing - Local Control & Isolation Switch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21820-7400
R2182-221: Manufacturing - Local Distribution Panel & Motor Starter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21820-7500
R2182-231: Manufacturing - Socket Outlet
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21830-0570
R2183-211: Manufacturing - Lighting
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21830-5700
R2183-231: Manufacturing - LED light
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21860-0010
R2186-001: Manufacturing - Telecom System Equipment (CCTV)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EE-21880-1000
R2188-901: Manufacturing - Electrical Heat Trace
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21520-5016
R2152-501: Shipping - Equipment Platforms & Ladders
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21532-3010
R2153-301: Shipping - Electrical Heater
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080
R2156-101: Shipping - Hot Oil Furnace - Last Batch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-1
A86-F-0001A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-2
A86-F-0001B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-3
A86-F-0001C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21560-0080-4
A86-F-0001D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1020
R2158-102: Shipping - WIP - Last Pump
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1020A
R2158-102: Shipping - WIP - 1st Pump
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1020B
R2158-102: Shipping - WIP - 2nd Pump
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1020C
R2158-102: Shipping - WIP - 3rd Pump
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031
R2158-103: Shipping - High Speed Integrally Geared Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-A
A83-G-0091A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-B
A83-G-0091B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-C
A83-G-0092A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-D
A83-G-0092B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-E
A83-G-0092C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-F
A83-G-0092D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-G
A83-G-0101A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-H
A83-G-0101B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-I
A83-G-0102A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-J
A83-G-0102B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-K
A83-G-0102C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-L
A83-G-0103A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-M
A83-G-0201A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-N
A83-G-0201B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-O
A83-G-0202A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-P
A83-G-0202B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-Q
A83-G-0202C - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-R
A83-G-0203A - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-S
A83-G-0203B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1031-T
A83-G-0103B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-1041
R2158-104: Shipping - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011
R2158-201: Shipping - API617 Centrifugal Compressor (ATM@A530)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-1
A83-K-0101 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-2
A83-K-0201 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-3
A83-E-0101A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-4
A83-E-0101C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-5
A83-E-0201A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011-6
A83-E-0201C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B
R2158-201: Shipping - API617 Centrifugal Compressor (HP@A530)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B1
A83-K-0102 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B2
A83-K-0202 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B3
A83-E-0102A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B4
A83-E-0103A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B5
A83-E-0103C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B6
A83-E-0202A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B7
A83-E-0203A/B - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2011B8
A83-E-0203C/D - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012
R2158-201: Shipping - API617 Centrifugal Compressor (Pipeline@A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012-1
A83-K-0104 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012-2
A83-K-0105 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012B
R2158-201: Shipping - API617 Centrifugal Compressor (C3@A550)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012B1
A83-K-0204 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2012B2
A83-K-0205 - Delivery
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21580-2020
R2158-202: Shipping - Air Compressors
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-215A0-2020
R215A-202: Shipping - Vacuum Deaerator Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-215A0-6010
R215A-601: Shipping - Nitrogen Generation Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-215A0-6020
R215A-602: Shipping - Liquid N2 Storage & Vaporization Package
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-215A0-8010
R215A-801: Shipping - Water Oil Separation (WOSEP) Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-215Z0-0080
R215Z-001: Shipping and all delivered on Site - Fire Fighting and Safety
Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-0115
R216A-115: Shipping - Grooved Mechanical Coupling Joints Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1011
R216A-101: Shipping for 1st MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1012
R216A-101: Shipping for 2nd MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1013
R216A-101: Shipping for 2.5th MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1014
R216A-101: Shipping for 3rd MTO - CS & LTCS Seamless Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1021
R216A-102: Shipping for 1st MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1022
R216A-102: Shipping for 2nd MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1023
R216A-102: Shipping for 2.5th MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1024
R216A-102: Shipping for 3rd MTO - CS & LTCS Welded Pipes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1052
R216A-105: Shipping for 2nd MTO - CSS Pipes Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1053
R216A-105: Shipping for 2.5th MTO - CSS Pipes Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216A0-1054
R216A-105: Shipping for 3rd MTO - CSS Pipes Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0135
R216B-135: Shipping - Forged Steel Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0137
R216B-137: Shipping - Ball Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0139
R216B-139: Shipping - Butterfly Valves (Resilient Lined)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0140
R216B-140: Shipping - Butterfly Valves (Eccentric Design)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0142
R216B-142: Shipping - Dual Plate Check Valves (including Non-slam type)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0143
R216B-143: Shipping - Plug Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0144
R216B-144: Shipping - Bronze Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216B0-0152
R216B-152: Shipping - CCS Valves Internally FBE Lined
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1611
R216C-161: Shipping for 1st MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1612
R216C-161: Shipping for 2nd MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1613
R216C-161: Shipping for 2.5th MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1614
R216C-161: Shipping for 3rd MTO - CS & LTCS Buttwelding Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1632
R216C-163: Shipping for 2nd MTO - SS & Nickel Alloy Buttwelding Fittings
Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1633
R216C-163: Shipping for 2.5th MTO - SS & Nickel Alloy Buttwelding Fittings
Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1634
R216C-163: Shipping for 3rd MTO - SS & Nickel Alloy Buttwelding Fittings
Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1641
R216C-164: Shipping for 1st MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1642
R216C-164: Shipping for 2nd MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1643
R216C-164: Shipping for 2.5th MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216C0-1644
R216C-164: Shipping for 3rd MTO - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216D0-1711
R216D-171: Shipping - Flanges 1st MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216D0-1712
R216D-171: Shipping - Flanges 2nd MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216D0-1713
R216D-171: Shipping - Flanges 2.5th MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216D0-1714
R216D-171: Shipping - Flanges 3rd MTO
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216D0-1720
R216D-171: Shipping - Flanges w/ Weld Overlay
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0201
R216G-201: Shipping - Strainers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0202
R216G-202: Shipping - Static Mixers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0203
R216G-203: Shipping - Desuperheaters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0206
R216G-206: Shipping - Power Traps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0223
R216G-223: Shipping - Mixing Tees
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0302
R216G-302: Shipping - Motor Operated Valves (Ball)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0303
R216G-303: Shipping - Motor Operated Valves (Butterfly)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0307
R216G-307: Shipping - Axial Disc Check Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0321
R216G-321: Shipping - Modular Double Block/Isolation and Bleed Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0401
R216G-401: Shipping - Line Blanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0504
R216G-504: Shipping - Restriction Orifices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0505
R216G-505: Shipping - Level Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0506
R216G-506: Shipping - Sight Glasses
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0508
R216G-508: Shipping - Buckling Pin Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0601
R216G-601: Shipping - Sample Coolers and Sampling Systems
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0603
R216G-603: Shipping - Emergency Showers and Eye Washers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0611
R216G-611: Shipping - Flexible Metal Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0612
R216G-612: Shipping - Hoses and Hose Couplings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0617
R216G-617: Shipping - Corrosion Coupons and Chemical Injections
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216G0-0619
R216G-619: Shipping - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0701
R216K-701: Shipping - Sliding Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0704
R216K-704: Shipping - Spring Supports, Struts, and Snubbers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0705
R216K-705: Shipping - Vibration Isolation Pads
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-216K0-0801
R216K-801: Shipping - Plates for Piping Supports
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0069-3
R2171-101: Marshalling Cabinet FOB (Ready on Site) - PKG-1 - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0069-4
R2171-101: Marshalling Cabinet FOB (Ready on Site) - PKG-2 - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0069-C
R2171-101: Marshalling Cabinet FOB (Ready on Site) - PKG-2 - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0070-3
R2171-101: Console & System Cabinet FOB (Ready on Site) - PKG-1 - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0070-4
R2171-101: Console & System Cabinet FOB (Ready on Site) - PKG-2 - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0070-C
R2171-101: Console FOB (Ready on Site) - PKG-2 - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0071-C
R2171-101: System Cabinet FOB (Ready on Site) - PKG-2 - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0149
R2171-101: Software Release to SAT - PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0170
R2171-101: Software Release after IFAT - PKG-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0229
R2171-101: Software Release to SAT - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-0250
R2171-101: Software Release after IFAT - PKG-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-3010
R2171-301: Shipping - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-3020
R2171-302: Shipping - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21710-3030
R2171-401: Shipping - Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21731-0110
R2173-101: Shipping - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2040
R2173-204: Shipping - Ultrasonic Type Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2081
R2173-202: Shipping - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2091
R2173-205: Shipping - Coriolis Type Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2092
R2173-208: Shipping - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2093
R2173-302: Shipping - Radar Type Level Instruments (GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2094
R2173-502: Shipping - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21733-2104
R2173-501: Shipping - Pressure Gauges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21736-6021
R2173-602: Shipping - Venturi Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21736-6031
R2173-601: Shipping - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21741-1021
R2174-201: Shipping - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21741-2020
R2174-202: Shipping - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21741-4011
R2174-101: Shipping - Control Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21741-4021
R2174-401: Shipping - Pressure Regulators
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21751-5010
R2175-501: Shipping - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21751-5020
R2175-101: Shipping - Analyzer System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21761-0110
R2176-101: Shipping - Fire And Gas Devices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21774-0110
R2177-401: Shipping - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-1021
R2178-102: Shipping - Conduit Pipe & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-1031
R2178-103: Shipping - Cable Transit
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-2013
R2178-201: Shipping for 3rd MTO - Instrument Cables
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-2021
R2178-202: Shipping for 1st MTO - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-2022
R2178-202: Shipping for 2nd MTO - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-2023
R2178-202: Shipping for 3rd MTO - Instrument Cable for Fiber Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-2031
R2178-203: Shipping - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-2041
R2178-204: Shipping - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-3041
R2178-304: Shipping - Instrument Tube
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-3051
R2178-305: Shipping - Valve Manifold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-3061
R2178-306: Shipping - Tube Fitting & Inst Tube
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-4011
R2178-401: Shipping - Air Pipe, Valve & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21780-6011
R2178-601: Shipping - Instrument Bulk Materials
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21800-0080
R2180-101: Shipping- Electrical Misc. Item
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21800-0085
R2180-131: Shipping - Junction Box
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21800-8101
R2180-111: Shipping - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-0380
R2181-213: Shipping - 230kV Transformer & Shut Reactor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-2130
R2181-311 Shipping - 230kV GIS and Receiving Facilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-4410
R2181-411: Shipping - LV Switchgear and Controlgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-5010
R2181-501: Shipping - AC UPS/DC Charger
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-5020
R2181-431: Shipping - 4.16kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-5030
R2181-441: Shipping - 13.8kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-6110
R2181-611: Shipping - Cable Bus
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-7010
R2181-701: Shipping - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-7020
R2181-801: Shipping - PSA
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21810-7030
R2181-212: Shipping - Indoor Dry Transformer
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21820-8700
R2182-211: Shipping - Local Control & Isolation Switch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21820-8900
R2182-221: Shipping - Local Distribution Panel & Motor Starter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21820-9100
R2182-231: Shipping - Socket Outlet
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21830-9300
*del(IK) R2183-101: Shipping- Outdoor Distribution Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21860-0010
R2186-001: Shipping - Telecom System Equipment (CCTV)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EF-21880-1010
R2188-901: Shipping - Electrical Heat Trace
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21300-0010
R2130-001: Complete sets of all NMRs Received - Shop Fabricated Structural
Steel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21400-0310
R2140-002: Complete sets of all NMRs Received - Pre-Engineered Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21400-2500
R2140-001: Complete sets of all NMRs Received - Precast Concrete Materials
for Building Wall & Floor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21400-2800
R2140-006: Complete sets of all NMRs Received - HVAC Control Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21510-3120
R2151-301: Complete sets of all NMRs Received - Drums
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21532-3020
R2153-301: Complete sets of all NMRs Received - Electrical Heater
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21580-1013
R2158-101: Complete sets of all NMRs Received - Centrifugal Pumps Utility
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21580-1113
R2158-101: Complete sets of all NMRs Received - Centrifugal Pumps Process
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21580-2050
R2158-105: Complete sets of all NMRs Received - Submersible Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21580-2060
R2158-104: Complete sets of all NMRs Received - Positive Displacement Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-215A0-9040
R215A-801: Complete sets of all NMRs Received - Water Oil Separation (WOSEP)
Internal
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216A0-101Z
R216A-101: Complete sets of all NMRs Received
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216A0-102Z
R216A-102: Complete sets of all NMRs Received
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216A0-105Z
R216A-105: Complete sets of all NMRs Received
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216A0-109Z
R216A-109: Complete sets of all NMRs Recieved for UG Pipes 1st MTO - GRP
Pipes and Piping Components
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216B0-0190
R216B-143: Complete sets of all NMRs Recieved - Plug Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216B0-0195
R216B-144: Complete sets of all NMRs Recieved - Bronze Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216B0-0210
R216B-152: Complete sets of all NMRs Recieved - CCS Valves Internally FBE
Lined
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216C0-161Z
R216C-161: Complete sets of all NMRs Recieved - CS & LTCS Buttwelding
Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216C0-163Z
R216C-163: Complete sets of all NMRs Recieved - SS & Nickel Alloy Buttwelding
Fittings Incl. DSS, SDSS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216C0-164Z
R216C-164: Complete sets of all NMRs Recieved - Forged Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216D0-171Z
R216D-171: Complete sets of all NMRs Recieved - Flanges
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0202
R216G-206: Complete sets of all NMRs Received - Power Traps
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0203
R216G-203: Complete sets of all NMRs Received - Desuperheaters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0222
R216G-202: Complete sets of all NMRs Received - Static Mixers
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0223
R216G-223: Complete sets of all NMRs Received - Mixing Tees
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0307
R216G-307: Complete sets of all NMRs Received - Axial Disc Check Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0312
R216G-312: Complete sets of all NMRs Received - PIV, Valves with Position
Indicator
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0321
R216G-321: Complete sets of all NMRs Received - Modular Double
Block/Isolation and Bleed Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0322
R216G-322: Complete sets of all NMRs Received - Auto Drain Valve
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0401
R216G-401: Complete sets of all NMRs Received - Line Blanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0501
R216G-501: Complete sets of all NMRs Received - Pressure Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0508
R216G-508: Complete sets of all NMRs Received - Buckling Pin Relief Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0516
R216G-504: Complete sets of all NMRs Received - Restriction Orifices
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0601
R216G-601: Complete sets of all NMRs Received - Sample Coolers and Sampling
Systems
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0611
R216G-611: Complete sets of all NMRs Received - Flexible Metal Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216G0-0619
R216G-619: Complete sets of all NMRs Received - Spray Shields
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-216K0-0801
R216K-801: Complete sets of all NMRs Received - Plates for Piping Supports
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21710-0013
R2171-101: Complete sets of all NMRs Received - PCS
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21710-3012
R2171-301: Complete sets of all NMRs Received - Power Distribution Panels
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21710-3032
R2171-401: Complete sets of all NMRs Received - Fire Detection System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21710-3050
R2171-302: Complete sets of all NMRs Received - Interposing Relay Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21731-1012
R2173-101: Complete sets of all NMRs Received - Electronic Field Transmitters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21733-2042
R2173-204: Complete sets of all NMRs Received - Ultrasonic Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21733-2121
R2173-202: Complete sets of all NMRs Received - Flow Instrument
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21733-2151
R2173-205: Complete sets of all NMRs Received - Coriolis Type Flow Meter
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21733-2154
R2173-208: Complete sets of all NMRs Received - Magnetic Flow Meters
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21733-2157
R2173-302: Complete sets of all NMRs Received - Radar Type Level Instruments
(GWR / Non-Contact)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21733-2160
R2173-502: Complete sets of all NMRs Received - Temperature Elements & Wells
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21736-6031
R2173-602: Complete sets of all NMRs Received - Venturi Tubes
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21736-6071
R2173-601: Complete sets of all NMRs Received - Orifice Plates
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21741-4043
R2174-201: Complete sets of all NMRs Received - On-Off Valves
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21751-5012
R2175-501: Complete sets of all NMRs Received - Corrosion Monitoring System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21774-4020
R2177-401: Complete sets of all NMRs Received - Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21780-102Z
R2178-102: Complete sets of all NMRs Received - Conduit Pipe & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21780-202Z
R2178-202: Complete sets of all NMRs Received - Instrument Cable for Fiber
Optic Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21780-2034
R2178-201: Complete sets of all NMRs Received - Instrument Cable
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21780-204Z
R2178-204: Complete sets of all NMRs Received - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21780-305Z
R2178-305: Complete sets of all NMRs Received - Valve Manifold
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21780-401Z
R2178-401: Complete sets of all NMRs Received - Air Pipe, Valve & Fittings
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21780-601Z
R2178-601: Complete sets of all NMRs Received - Instrument Bulk Materials
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21800-1010
R2180-101: Complete sets of all NMRs Received - Electrical Misc. Item
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21800-8201
R2180-111: Complete sets of all NMRs Received - Cable Gland
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-4420
R2181-211: Complete sets of all NMRs Received - Transformers & NGR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-4440
R2181-311 Complete sets of all NMRs Received - 230kV GIS and Receiving
Facilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-4450
R2181-411: Complete sets of all NMRs Received - LV Switchgear and Controlgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-4490
R2181-431: Complete sets of all NMRs Received - 4.16kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-4510
R2181-441: Complete sets of all NMRs Received - 13.8kV Switchgear
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-5012
R2181-501: Complete sets of all NMRs Received - AC UPS/DC Charger
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-6012
R2181-611: Complete sets of all NMRs Received - Cable Bus
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-7012
R2181-701: Complete sets of all NMRs Received - Miscellaneous Panel
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-7032
R2181-801: Complete sets of all NMRs Received - PSA
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21810-7062
R2181-212: Complete sets of all NMRs Received - Indoor Dry Transformer
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-EZ-21820-8800
R2182-211: Complete sets of all NMRs Received - Local Control & Isolation
Switch
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GD-32000-0010
Subcontracting - Civil/Fdn, Building
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GD-32000-0020
Mobilization - Civil/Fdn, Building Subcontractor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GD-32000-0069
Subcontracting - Inquiry Package Preparation - Mechanical
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GD-32000-0080
Mobilization - Mechanical Subcontractor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GD-32000-6010
Subcontracting - Pipe Prefabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GD-321Z0-0030
SA/JGC Staff Site Office Ready (Partially)
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GE-32000-6020
Mobilization - Temporary Facility Subcontractor
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GF-21532-1022
R3154-101: Subcontractor Info. - GA for Utility Tanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GF-21532-1031
R3154-101: Subcontractor Info. - Loading Data for Process Tanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-GF-21532-1032
R3154-101: Subcontractor Info. - GA for Process Tanks
Project: CCC-Zuluf-L3-UPDT-01 Activity: 0000-HA-32110-0020
Temporary Facility Construction
Project: CCC-Zuluf-L3-UPDT-01 Activity: 1000-DC-13783-3011
R2178-3xx: Req. - Impulse and Sampling Piping Tubing FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: 1000-DC-13812-7020
R2181-701 DS/Req. - Miscellaneous Panel Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: 1000-DC-13812-7030
R2181-701 DS/Req. - Miscellaneous Panel FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DB-13784-1100
A000: Instrument Piping/Installation Detail FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DB-13784-1110
A000: Instrument Piping/Installation Detail Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DB-13784-1120
A000: Instrument Piping/Installation Detail FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DD-13630-0010
Piping Isometric Dwgs - U/G (Main ring) (A00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DD-13630-10 Piping
Isometric Dwgs - U/G (Area) (A00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DG-13832-0030
A000: Lighting Layout Plan & Diagram FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DG-13832-0050
A000: Lighting Layout Plan & Diagram FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13780-1130
A000: Instrument Points & Lines FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13780-1150
A000: Instrument Points & Lines FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13781-1110
A000: Instrument Cable Trench Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13781-1130
A000: Instrument Cable Trench Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13781-1140
A000: Instrument Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13782-1070
A000: Instrument Main Cable Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13782-1080
A000: Instrument Main Cable Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13782-1090
A000: Instrument Main Cable Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13784-1090
A000: Instrument Air Pipe Arrangement FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13784-1110
A000: Instrument Air Pipe Arrangement FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13826-1100
A000: Electrical Cable Route Plan FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13828-1160
A000: Electrical Cable Tray Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13828-1180
A000: Electrical Cable Tray Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13829-1160
A000: Electrical Cable Trench Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13829-1170
A000: Electrical Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13880-0030
A000: Electrical Heat Trace Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13880-0040
A000: Electrical Heat Trace Layout FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A000-DL-13880-0050
A000: Electrical Heat Trace Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31300-0010
A100: Pipe Rack Transport & Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31350-0010
A100: Pipe Rack Bridge (3 STRs)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31610-0010
A100: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31621-0010
A100: A/G Piping Hook Up Bridge Portion - Prep, Fit-up, Align, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31660-0010
A100: PWHT Shop Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31660-0020
A100: PWHT Field Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31671-0010
A100: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31671-0020
A100: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31682-0010
A100: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31784-0010
A100: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31791-0010
A100: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31792-0010
A100: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-317A2-0010
A100: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-317A3-0010
A100: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-317A4-0010
A100: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-317A5-0010
A100: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31828-0010
A100: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31830-0010
A100: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-3196H-0010
A100: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31A61-0010
A100: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31A63-0010
A100: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-HB-31AA0-0010
A100: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-J1-39200-0010
A100: Chemical Cleaning / Leak Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-J1-39200-0020
A100: Final Completion & Handover Activities to MC - Main Piperack
Project: CCC-Zuluf-L3-UPDT-01 Activity: A100-J3-39500-0010
A100: Final Walkdown Main Piperack
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-DD-13620-0010
Piping Isometric Dwgs - A/G Issued (A11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-EE-21310-0020
R2130-001: Fabrication (A11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31230-0010
A110: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31310-0010
A110: Pipe Rack (Pre-assembly) - Measure, Cut, Fit-up, Weld, Paint, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31621-0010
A110: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31629-0010
A110: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31641-0010
A110: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31642-0010
A110: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-31730-0010
A110: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-317B2-0010
A110: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A110-HB-317B3-0010
A110: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-DD-13231-3103
Fdn Dwgs FC - I/C P/R (A12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-DD-13620-0010
Piping Isometric Dwgs - A/G Issued (A12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-EE-21310-0020
R2130-001: Fabrication (A12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31171-0010
A120: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31280-0010
A120: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31310-0010
A120: Pipe Rack (Pre-assembly) - Measure, Cut, Fit-up, Weld, Paint, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31621-0010
A120: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31629-0010
A120: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31641-0010
A120: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31642-0010
A120: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31730-0010
A120: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-317B2-0010
A120: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-317B3-0010
A120: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A120-HB-31840-0010
A120: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-DD-13620-0010
Piping Isometric Dwgs - A/G Issued (A13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-EE-21310-0020
R2130-001: Fabrication (A13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-31280-0010
A130: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-31310-0010
A130: Pipe Rack (Pre-assembly) - Measure, Cut, Fit-up, Weld, Paint, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-31621-0010
A130: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-31629-0010
A130: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-31641-0010
A130: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-31642-0010
A130: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-31730-0010
A130: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-317B2-0010
A130: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A130-HB-317B3-0010
A130: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-DL-13780-1140
A200: Instrument Equipment Layout FR - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-DL-13780-1150
A200: Instrument Equipment Layout Cpy Rvw - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-DL-13780-1160
A200: Instrument Equipment Layout FC - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-DL-13780-1170
A200: Cable Tray Layout FR - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-DL-13780-1180
A200: Cable Tray Layout Cpy Rvw - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-DL-13780-1190
A200: Cable Tray Layout FC - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31154-0010
A200: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31411-3110
A200: PIB-1 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31411-5110
A200: OPERATION SHELTER-1-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31412-3110
A200: PIB-1 - Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31412-5110
A200: OPERATION SHELTER-1-Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31413-3110
A200: PIB-1 - Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31413-5110
A200: OPERATION SHELTER-1-Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31414-3110
A200: PIB-1 - Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31414-5110
A200: OPERATION SHELTER-1-Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31415-3110
A200: PIB-1 - HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31415-5110
A200: OPERATION SHELTER-1-HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31416-3110
A200: PIB-1 - Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31416-5110
A200: OPERATION SHELTER-1-Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31417-3110
A200: PIB-1 - Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31417-5110
A200: OPERATION SHELTER-1-Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31418-3110
A200: PIB-1 - Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31418-5110
A200: OPERATION SHELTER-1-Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31610-0010
A200: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31660-0010
A200: PWHT Shop Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31660-0020
A200: PWHT Field Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31671-0010
A200: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31671-0020
A200: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31682-0010
A200: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31783-0010
A200: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31784-0010
A200: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31791-0010
A200: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31792-0010
A200: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31793-0010
A200: SAT (PIB-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31793-0020
A200: Software Download after IFAT & Mini-SAT (PIB-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-317A2-0010
A200: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-317A3-0010
A200: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-317A4-0010
A200: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-317A5-0010
A200: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31821-0010
A200: Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31826-0010
A200: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31827-0010
A200: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31828-0010
A200: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31830-0010
A200: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31880-0010
A200: Elecrical Heat Tracing - Prep, Junction/Protection Boxes, Cable,
Connection, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-3195H-0010
A200: Hot Insulation (Equipment) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-3196H-0010
A200: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-3196H-0020
A200: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31A61-0010
A200: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31A63-0010
A200: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31AA0-0010
A200: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31B32-0010
A200: Fire Proofing LW Cement (Structure) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31B52-0010
A200: Fire Proofing LW Cement (Equipment) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-HB-31B62-0010
A200: Fire Proofing LW Cement (Piping) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-J1-39200-0010
A200: Chemical Cleaning / Leak Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-J1-39200-0020
A200: Final Completion & Handover Activities to MC - GOSP - 1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A200-J3-39500-0010
A200: Final Walkdown GOSP-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13231-3101
Fdn Dwgs FR - Unit P/R 1st (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13231-3111
Fdn Dwgs FR - Unit P/R 2nd (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R 1st (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R 1st (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13310-1130
Steel Str. Dwgs FR - Unit P/R 2nd (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13310-1140
Steel Str. Dwgs FC - Unit P/R 2nd (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DD-13620-0310
Piping Isometric Dwgs - A/G Issued (A20)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-DH-13602-3111
Piping Information - Unit P/R 2nd (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-EE-21310-0010
R2130-001: Material Procurement - Unit P/R 1st (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-EE-21310-0020
R2130-001: Fabrication - Unit P/R 1st (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-EE-21310-0110
R2130-001: Material Procurement - Unit P/R 2nd (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-EE-21310-0120
R2130-001: Fabrication - Unit P/R 2nd (A21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31174-0010
A210: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31310-0010
A210: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31610-0010
A210: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31621-0010
A210: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31629-0010
A210: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31641-0010
A210: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31642-0010
A210: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A210-HB-31840-0010
A210: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13170-0010
Detail Dwgs - Paving Plan FR (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13231-3701
Fdn Dwgs FR - Stanchion (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DH-13602-3600
Piping Information - Platform & Accessway (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DH-13602-3700
Piping Information - Stanchion (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-DH-13602-3800
Piping Information - Misc. Str. (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-EE-21370-0020
R2130-001: Fabrication - Stanchion (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31161-0010
A220: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31162-0010
A220: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31174-0010
A220: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31175-0010
A220: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31280-0010
A220: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31310-0010
A220: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31360-0010
A220: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31370-0010
A220: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31380-0010
A220: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31510-0010
A220: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31525-0010
A220: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31532-0010
A220: Heat Exchanger - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31581-0010
A220: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31621-0010
A220: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31623-0010
A220: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31629-0010
A220: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31629-0020
A220: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31631-0010
A220: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31632-0010
A220: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31641-0010
A220: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31642-0010
A220: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31730-0010
A220: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31750-0010
A220: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31761-0010
A220: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-317B2-0010
A220: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-317B3-0010
A220: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31822-0010
A220: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A220-HB-31840-0010
A220: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13151-0010
Detail Dwgs - Fdn Plan/Layout/Section FR (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13151-5401
Fdn Dwgs FR - Tank A81-D-1102 (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13170-1110
Detail Dwgs - Paving Plan FC (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3701
Fdn Dwgs FR - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3702
Fdn Dwgs FC - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3801
Fdn Dwgs FR - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3802
Fdn Dwgs FC - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3811
Fdn Dwgs FR - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13231-3812
Fdn Dwgs FC - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13380-0110
Steel Str. Dwgs FR - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13380-0120
Steel Str. Dwgs FC - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13410-0001
Room Size Fix - PIB-1 (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13411-0001
Fdn Dwgs FR - PIB-1 (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13411-0002
Fdn Dwgs Cpy Rvw - PIB-1 (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13411-0003
Fdn Dwgs FC - PIB-1 (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13411-0010
Detail Dwgs - Structural / Architectural FR - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13411-0020
Detail Dwgs - Structural / Architectural Cpy Rvw - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DD-13411-0030
Detail Dwgs - Structural / Architectural FC - PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DH-13602-3101
Piping Information - Unit P/R (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DH-13602-3600
Piping Information - Platform & Accessway (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DH-13602-3700
Piping Information - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DH-13602-3801
Piping Information - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-DH-13602-3802
Piping Information - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21370-0020
R2130-001: Fabrication - Stanchion (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21380-0020
R2130-001: Fabrication - Misc. Str. 1st (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21380-0110
R2130-001: Material Procurement - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21380-0120
R2130-001: Fabrication - Misc. Str. 2nd (A23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21400-0270
R2140-001: Material Procurement & Fabrication - Precast Concrete Materials
for Building Wall & Floor PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-EE-21400-0280
R2140-001: 1st Delivery - Precast Concrete Materials for Building Wall &
Floor PIB-1
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31161-0010
A230: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31162-0010
A230: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31174-0010
A230: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31280-0010
A230: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31310-0010
A230: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31360-0010
A230: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31370-0010
A230: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31380-0010
A230: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31532-0010
A230: Heat Exchanger - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31540-0010
A230: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31581-0010
A230: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31621-0010
A230: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31623-0010
A230: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31629-0010
A230: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31629-0020
A230: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31631-0010
A230: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31632-0010
A230: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31641-0010
A230: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31642-0010
A230: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31711-0010
A230: Marshalling Cabinets / PCS (PIB-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31718-0010
A230: Console & System Cabinets / PCS (PIB-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31730-0010
A230: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31750-0010
A230: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31761-0010
A230: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-317B2-0010
A230: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-317B3-0010
A230: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31814-0010
A230: MCC / UPS (PIB-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31822-0010
A230: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31840-0010
A230: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A230-HB-31871-0010
A230: Cathodic Protection - Excavate, Cables/Anodes, Connection, Backfill,
Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13170-1110
Detail Dwgs - Paving Plan FC (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3101
Fdn Dwgs FR - Unit P/R 1st (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3111
Fdn Dwgs FR - Unit P/R 2nd (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3701
Fdn Dwgs FR - Stanchion (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13232-5101
Fdn Dwgs FR - Static Eqpt (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13251-0010
Detail Dwgs - Pit FR (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R 1st (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R 1st (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13310-0210
Steel Str. Dwgs FR - Unit P/R 2nd (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13310-0220
Steel Str. Dwgs FC - Unit P/R 2nd (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-dd-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-dd-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DH-13602-3101
Piping Information - Unit P/R 1st (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DH-13602-3111
Piping Information - Unit P/R 2nd (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DH-13602-3600
Piping Information - Platform & Accessway (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DH-13602-3700
Piping Information - Stanchion (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-DH-13602-3800
Piping Information - Misc. Str. (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21310-0010
R2130-001: Material Procurement - Unit P/R 1st (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21310-0020
R2130-001: Fabrication - Unit P/R 1st (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21310-0110
R2130-001: Material Procurement - Unit P/R 2nd (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21310-0120
R2130-001: Fabrication - Unit P/R 2nd (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21370-0020
R2130-001: Fabrication - Stanchion (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31161-0010
A240: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31162-0010
A240: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31174-0010
A240: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31175-0010
A240: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31250-0010
A240: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31280-0010
A240: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31310-0010
A240: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31360-0010
A240: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31370-0010
A240: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31380-0010
A240: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31510-0010
A240: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31525-0010
A240: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31532-0010
A240: Heat Exchanger - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31581-0010
A240: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-315A1-0010
A240: Desalter / Dehydrator - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31621-0010
A240: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31623-0010
A240: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31629-0010
A240: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31629-0020
A240: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31631-0010
A240: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31632-0010
A240: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31641-0010
A240: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31642-0010
A240: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31730-0010
A240: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31750-0010
A240: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31761-0010
A240: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-317B2-0010
A240: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-317B3-0010
A240: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31822-0010
A240: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A240-HB-31840-0010
A240: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-DD-13310-3101
Steel Str. Dwgs FR - Unit P/R (A25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-DD-13310-3103
Steel Str. Dwgs FC - Unit P/R (A25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31174-0010
A250: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31280-0010
A250: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31310-0010
A250: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31621-0010
A250: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31629-0010
A250: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31631-0010
A250: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31632-0010
A250: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31641-0010
A250: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31642-0010
A250: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A250-HB-31840-0010
A250: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13231-3701
Fdn Dwgs FR - Stanchion (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13232-5101
Fdn Dwgs FR - Static Eqpt (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13320-0020
Steel Str. Dwgs FC - Eqpt Supp. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DH-13602-3201
Piping Information - Eqpt Supp. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DH-13602-3600
Piping Information - Platform & Accessway (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DH-13602-3700
Piping Information - Stanchion (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-DH-13602-3800
Piping Information - Misc. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-EE-21320-0010
R2130-001: Material Procurement - Eqpt Supp. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-EE-21370-0020
R2130-001: Fabrication - Stanchion (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A26)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31161-0010
A260: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31162-0010
A260: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31174-0010
A260: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31175-0010
A260: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31230-0010
A260: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31280-0010
A260: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31320-0010
A260: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31360-0010
A260: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31370-0010
A260: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31380-0010
A260: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31510-0010
A260: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31525-0010
A260: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31581-0010
A260: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-315A1-0010
A260: Flare Gas Recovery
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31623-0010
A260: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31629-0010
A260: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31629-0020
A260: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31641-0010
A260: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31642-0010
A260: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31822-0010
A260: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A260-HB-31840-0010
A260: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DC-13820-1410
A300: Cable and Conduit Schedule Layout SS200 FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DC-13820-1420
A300: Cable and Conduit Schedule Layout SS200 FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DC-13820-1430
A300: Cable and Conduit Schedule Layout SS200 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DG-13810-0280
A300: One Line Diagram FC - SS200
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DL-13780-0100
A300: Cable Tray Layout FR - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DL-13780-0110
A300: Cable Tray Layout Cpy Rvw - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DL-13780-1070
A300: Instrument Equipment Layout FR - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DL-13780-1080
A300: Instrument Equipment Layout Cpy Rvw - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DL-13780-1090
A300: Instrument Equipment Layout FC - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-DL-13810-0070
A300: Equipment Layout SS200 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31154-0010
A300: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31163-0010
A300: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31171-0010
A300: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31177-0010
A300: Marl Cap - Excavate, Marl Fill, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31179-0010
A300: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31411-1210
A300: SUBSTATION-200 - Building Foundation (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31411-3210
A300: PIB-2 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31411-5210
A300: OPERATION SHELTER-2-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31412-3210
A300: PIB-2 - Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31412-5210
A300: OPERATION SHELTER-2-Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31413-1210
A300: SUBSTATION-200 - Roof/Ext Wall (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31413-3210
A300: PIB-2 - Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31413-5210
A300: OPERATION SHELTER-2-Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31414-1210
A300: SUBSTATION-200 - Interior / Exterior Finish (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31414-3210
A300: PIB-2 - Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31414-5210
A300: OPERATION SHELTER-2-Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31415-1210
A300: SUBSTATION-200 - HVAC Work (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31415-3210
A300: PIB-2 - HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31415-5210
A300: OPERATION SHELTER-2-HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31416-1210
A300: SUBSTATION-200 - Plumbing / Drainage (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31416-3210
A300: PIB-2 - Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31417-1210
A300: SUBSTATION-200 - Buiding Electrical (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31417-3210
A300: PIB-2 - Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31417-5210
A300: OPERATION SHELTER-2-Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31418-1210
A300: SUBSTATION-200 - Fire Protection (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31418-3210
A300: PIB-2 - Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31418-5210
A300: OPERATION SHELTER-2-Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31610-0010
A300: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31660-0010
A300: PWHT Shop Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31660-0020
A300: PWHT Field Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31671-0010
A300: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31671-0020
A300: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31682-0010
A300: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31683-0010
A300: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31783-0010
A300: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31784-0010
A300: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31791-0010
A300: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31792-0010
A300: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31793-0010
A300: SAT (PIB-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31793-0020
A300: Software Download after IFAT & Mini-SAT (PIB-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-317A2-0010
A300: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-317A3-0010
A300: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-317A4-0010
A300: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-317A5-0010
A300: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31821-0010
A300: Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31826-0010
A300: Electrical Main Feeder Cabling (A/G) - Prep, Cable Pulling, Megger
Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31826-0020
A300: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31827-0010
A300: Main Feeder Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31827-0020
A300: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31828-0010
A300: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31830-0010
A300: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-3195H-0010
A300: Hot Insulation (Equipment) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-3196H-0010
A300: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-3196H-0020
A300: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31A61-0010
A300: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31A63-0010
A300: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31AA0-0010
A300: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31B32-0010
A300: Fire Proofing LW Cement (Structure) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31B52-0010
A300: Fire Proofing LW Cement (Equipment) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-HB-31B62-0010
A300: Fire Proofing LW Cement (Piping) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-J1-39200-0010
A300: Chemical Cleaning / Leak Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-J1-39200-0020
A300: Final Completion & Handover Activities to MC - GOSP - 2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A300-J3-39500-0010
A300: Final Walkdown GOSP-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R (A31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R (A31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-DD-13620-0310
Piping Isometric Dwgs - A/G Issued (A30)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-DH-13602-3101
Piping Information - Unit P/R (A31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31174-0010
A310: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31230-0010
A310: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31310-0010
A310: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31610-0010
A310: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31621-0010
A310: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31629-0010
A310: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31641-0010
A310: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31642-0010
A310: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A310-HB-31840-0010
A310: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13161-0010
Piping Plan FR (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13170-0010
Detail Dwgs - Paving Plan FR (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13170-1110
Detail Dwgs - Paving Plan FC (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3701
Fdn Dwgs FR - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3702
Fdn Dwgs FC - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13232-5101
Fdn Dwgs FR - Static Eqpt (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13380-0110
Steel Str. Dwgs FR - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13380-0120
Steel Str. Dwgs FC - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13420-0001
Room Size Fix - SS200 (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13421-0010
Detail Dwgs - Structural / Architectural FR 1st - SS200
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13421-0020
Detail Dwgs - Structural / Architectural Cpy Rvw - SS200
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13421-0030
Detail Dwgs - Structural / Architectural FC 1st - SS200
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13421-0110
Fdn Dwgs FR - SS200 (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13421-0120
Fdn Dwgs Cpy Rvw - SS200 (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DD-13421-0130
Fdn Dwgs FC - SS200 (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DH-13602-3600
Piping Information - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DH-13602-3700
Piping Information - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-DH-13602-3800
Piping Information - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21370-0020
R2130-001: Fabrication - Stanchion (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21400-0001
R2140-001: Material Procurement & Fabrication - Precast Concrete Materials
for Building Wall & Floor - SS200
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-EE-21400-0002
R2140-001: 1st Delivery - Precast Concrete Materials for Building Wall &
Floor - SS200
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31161-0010
A320: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31162-0010
A320: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31174-0010
A320: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31175-0010
A320: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31230-0010
A320: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31280-0010
A320: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31310-0010
A320: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31360-0010
A320: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31370-0010
A320: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31380-0010
A320: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31510-0010
A320: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31525-0010
A320: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31532-0010
A320: Heat Exchanger - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31581-0010
A320: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31621-0010
A320: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31623-0010
A320: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31629-0010
A320: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31629-0020
A320: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31631-0010
A320: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31632-0010
A320: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31641-0010
A320: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31642-0010
A320: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31711-0010
A320: Instrument Panel (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31730-0010
A320: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31750-0010
A320: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31761-0010
A320: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-317B2-0010
A320: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-317B3-0010
A320: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31812-0010
A320: Transformer (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31814-0010
A320: SWGR / MCC (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31822-0010
A320: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A320-HB-31840-0010
A320: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13151-5401
Fdn Dwgs FR - Tank A81-D-1102 (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13170-0010
Detail Dwgs - Paving Plan FR (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13170-1110
Detail Dwgs - Paving Plan FC (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3701
Fdn Dwgs FR - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3702
Fdn Dwgs FC - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3801
Fdn Dwgs FR - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3802
Fdn Dwgs FC - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3803
Fdn Dwgs FR - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13231-3804
Fdn Dwgs FC - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13380-0110
Steel Str. Dwgs FR - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13380-0120
Steel Str. Dwgs FC - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13410-0001
Room Size Fix - PIB-2 (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13411-0001
Fdn Dwgs FR - PIB-2 (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13411-0002
Fdn Dwgs Cpy Rvw - PIB-2 (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13411-0003
Fdn Dwgs FC - PIB-2 (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13411-0010
Detail Dwgs - Structural / Architectural FR - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13411-0020
Detail Dwgs - Structural / Architectural Cpy Rvew - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DD-13411-0030
Detail Dwgs - Structural / Architectural FC - PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DH-13602-3101
Piping Information - Unit P/R (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DH-13602-3600
Piping Information - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DH-13602-3700
Piping Information - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DH-13602-3801
Piping Information - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-DH-13602-3802
Piping Information - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21370-0020
R2130-001: Fabrication - Stanchion (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21380-0020
R2130-001: Fabrication - Misc. Str. 1st (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21380-0110
R2130-001: Material Procurement - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21380-0120
R2130-001: Fabrication - Misc. Str. 2nd (A33)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21400-0270
R2140-001: Material Procurement & Fabrication - Precast Concrete Materials
for Building Wall & Floor PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-EE-21400-0280
R2140-001: 1st Delivery - Precast Concrete Materials for Building Wall &
Floor PIB-2
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31161-0010
A330: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31162-0010
A330: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31174-0010
A330: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31175-0010
A330: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31230-0010
A330: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31260-0010
A330: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31280-0010
A330: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31310-0010
A330: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31360-0010
A330: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31370-0010
A330: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31380-0010
A330: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31532-0010
A330: Heat Exchanger - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31540-0010
A330: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31581-0010
A330: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31621-0010
A330: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31623-0010
A330: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31629-0010
A330: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31629-0020
A330: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31631-0010
A330: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31632-0010
A330: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31641-0010
A330: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31642-0010
A330: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31711-0010
A330: Marshalling Cabinets / PCS (PIB-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31718-0010
A330: Console & System Cabinets / PCS (PIB-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31730-0010
A330: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31750-0010
A330: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31761-0010
A330: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-317B2-0010
A330: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-317B3-0010
A330: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31814-0010
A330: MCC / UPS (PIB-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31822-0010
A330: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31840-0010
A330: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A330-HB-31871-0010
A330: Cathodic Protection - Excavate, Cables/Anodes, Connection, Backfill,
Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13161-0010
Piping Plan FR (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13170-0010
Detail Dwgs - Paving Plan FR (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13170-1110
Detail Dwgs - Paving Plan FC (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3101
Fdn Dwgs FR - Unit P/R 1st (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3121
Fdn Dwgs FR - Unit P/R 2nd (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3701
Fdn Dwgs FR - Stanchion (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3702
Fdn Dwgs FC - Stanchion (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13232-5101
Fdn Dwgs FR - Static Eqpt (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13251-0010
Detail Dwgs - Pit FR (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R 1st (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R 1st (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13310-130 Steel
Str. Dwgs FR - Unit P/R 2nd (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13310-140 Steel
Str. Dwgs FC - Unit P/R 2nd (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13380-0110
Steel Str. Dwgs FR - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DD-13380-0120
Steel Str. Dwgs FC - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DH-13602-3101
Piping Information - Unit P/R 1st (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DH-13602-3111
Piping Information - Unit P/R 2nd (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DH-13602-3600
Piping Information - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DH-13602-3700
Piping Information - Stanchion (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-DH-13602-3800
Piping Information - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21310-0010
R2130-001: Material Procurement - Unit P/R 1st (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21310-0020
R2130-001: Fabrication - Unit P/R 1st (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21310-20 R2130-
001: Material Procurement - Unit P/R 2nd (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21310-30 R2130-
001: Fabrication - Unit P/R 2nd (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A3)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21370-0020
R2130-001: Fabrication - Stanchion (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A34)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31161-0010
A340: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31162-0010
A340: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31174-0010
A340: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31175-0010
A340: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31230-0010
A340: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31250-0010
A340: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31280-0010
A340: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31310-0010
A340: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31360-0010
A340: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31370-0010
A340: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31380-0010
A340: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31510-0010
A340: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31525-0010
A340: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31532-0010
A340: Heat Exchanger - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31581-0010
A340: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-315A1-0010
A340: Desalter / Dehydrator - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31621-0010
A340: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31623-0010
A340: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31629-0010
A340: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31629-0020
A340: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31631-0010
A340: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31632-0010
A340: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31641-0010
A340: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31642-0010
A340: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31730-0010
A340: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31750-0010
A340: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31761-0010
A340: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-317B2-0010
A340: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-317B3-0010
A340: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31822-0010
A340: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A340-HB-31840-0010
A340: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-DD-13620-0310
Piping Isometric Dwgs - A/G Issued (A40)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31163-0010
A400: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31171-0010
A400: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31177-0010
A400: Marl Cap - Excavate, Marl Fill, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31179-0010
A400: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-315D3-0010
A400: Fire Fighting Equipment - Prep, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31610-0010
A400: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31671-0010
A400: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31671-0020
A400: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31682-0010
A400: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31683-0010
A400: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31783-0010
A400: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31784-0010
A400: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31791-0010
A400: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31792-0010
A400: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-317A2-0010
A400: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-317A3-0010
A400: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-317A4-0010
A400: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-317A5-0010
A400: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31821-0010
A400: Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31826-0010
A400: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31827-0010
A400: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31828-0010
A400: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31830-0010
A400: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-3195H-0010
A400: Hot Insulation (Equipment) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-3196H-0010
A400: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-3196H-0020
A400: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31A61-0010
A400: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31A63-0010
A400: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31AA0-0010
A400: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31B52-0010
A400: Fire Proofing LW Cement (Equipment) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-HB-31B62-0010
A400: Fire Proofing LW Cement (Piping) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-J1-39200-0010
A400: Chemical Cleaning / Lube Oil Flushing / Leak Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-J1-39200-0020
A400: Final Completion & Handover Activities to MC - Hot Oil
Project: CCC-Zuluf-L3-UPDT-01 Activity: A400-J3-39500-0010
A400: Final Walkdown Hot Oil System
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A41)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R (A41)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R (A41)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A41)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A41)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31174-0010
A410: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31310-0010
A410: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31610-0010
A410: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31621-0010
A410: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31629-0010
A410: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31641-0010
A410: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31642-0010
A410: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31730-0010
A410: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31750-0010
A410: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31761-0010
A410: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-317B2-0010
A410: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-317B3-0010
A410: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A410-HB-31840-0010
A410: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13170-0010
Detail Dwgs - Paving Plan FR (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13232-5601
Fdn Dwgs FR - Hot Oil Furnce (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-DD-13272-0010
Detail Dwg - Dike FR (A42)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31161-0010
A420: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31162-0010
A420: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31174-0010
A420: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31175-0010
A420: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31270-0010
A420: Retaining Wall / Dike - Prep, Construction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31510-0010
A420: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31540-0010
A420: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31560-0010
A420: Hot Oil Furnace Erection
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31623-0010
A420: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31629-0010
A420: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31641-0010
A420: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31642-0010
A420: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31730-0010
A420: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31750-0010
A420: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31761-0010
A420: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-317B2-0010
A420: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-317B3-0010
A420: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31822-0010
A420: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31840-0010
A420: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A420-HB-31871-0010
A420: Cathodic Protection - Excavate, Cables/Anodes, Connection, Backfill,
Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13170-1110
Detail Dwgs - Paving Plan FC (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13231-3701
Fdn Dwgs FR - Stanchion (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13320-0110
Steel Str. Dwgs FR - Eqpt Supp. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DH-13602-3201
Piping Information - Eqpt Supp. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DH-13602-3600
Piping Information - Platform & Accessway (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DH-13602-3700
Piping Information - Stanchion (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-DH-13602-3800
Piping Information - Misc. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21370-0020
R2130-001: Fabrication - Stanchion (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A43)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31161-0010
A430: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31162-0010
A430: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31174-0010
A430: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31175-0010
A430: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31230-0010
A430: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31280-0010
A430: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31320-0010
A430: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31360-0010
A430: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31370-0010
A430: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31380-0010
A430: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31510-0010
A430: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31525-0010
A430: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31531-0010
A430: AFC - Prep, Erect, Align, Inspect, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31581-0010
A430: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31623-0010
A430: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31629-0010
A430: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31629-0020
A430: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31631-0010
A430: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31632-0010
A430: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31641-0010
A430: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31642-0010
A430: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31730-0010
A430: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31750-0010
A430: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31761-0010
A430: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-317B2-0010
A430: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-317B3-0010
A430: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31822-0010
A430: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A430-HB-31840-0010
A430: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DC-13820-1440
A500: Cable and Conduit Schedule Layout SS300 FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DC-13820-1450
A500: Cable and Conduit Schedule Layout SS300 FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DC-13820-1460
A500: Cable and Conduit Schedule Layout SS300 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DL-13780-0100
A500: Instrument Equipment Layout FR - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DL-13780-0110
A500: Instrument Equipment Layout Cpy Rvw - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DL-13780-0130
A500: Cable Tray Layout FR - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DL-13780-0140
A500: Cable Tray Layout Cpy Rvw - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-DL-13780-0150
A500: Cable Tray Layout FC - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31153-0010
A500: Trench For Cabling - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31154-0010
A500: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31156-0010
A500: Duct Bank - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31163-0010
A500: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31171-0010
A500: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31177-0010
A500: Marl Cap - Excavate, Marl Fill, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31179-0010
A500: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-315D3-0010
A500: Fire Fighting Equipment - Prep, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31610-0010
A500: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31660-0020
A500: PWHT Field Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31671-0020
A500: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31682-0010
A500: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31683-0010
A500: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31783-0010
A500: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31784-0010
A500: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31792-0010
A500: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31793-0010
A500: SAT (PIB-3)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-317A2-0010
A500: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-317A3-0020
A500: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-317A4-0020
A500: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-317A5-0010
A500: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31821-0010
A500: Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31826-0020
A500: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31827-0010
A500: Main Feeder Cable Term & Splice (U/G) - Incl Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31827-0020
A500: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31828-0010
A500: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31830-0010
A500: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31866-0010
A500: Communication Cabling - Prep, Lay & Dress, Continuity/Attenuation,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31880-0010
A500: Elecrical Heat Tracing - Prep, Junction/Protection Boxes, Cable,
Connection, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-3195C-0010
A500: Cold Insulation (Equipment) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-3195H-0010
A500: Hot Insulation (Equipment) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-3196C-0010
A500: Cold Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-3196C-0020
A500: Cold Insulation for Valve - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-3196H-0010
A500: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-3196H-0020
A500: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31A61-0010
A500: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31A63-0010
A500: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31AA0-0010
A500: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31B32-0010
A500: Fire Proofing LW Cement (Structure) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31B52-0010
A500: Fire Proofing LW Cement (Equipment) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-HB-31B62-0010
A500: Fire Proofing LW Cement (Piping) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-J1-39200-0010
A500: Chemical Cleaning / Leak Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-J1-39200-0020
A500: Final Completion & Handover Activities to MC - Gas Compression
Project: CCC-Zuluf-L3-UPDT-01 Activity: A500-J3-39500-0010
A500: Final Walkdown Gas Compression
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13231-3101
Fdn Dwgs FR - Unit P/R 1st (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13231-3104
Fdn Dwgs FR - Unit P/R 2nd (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13231-3701
Fdn Dwgs FR - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13231-3702
Fdn Dwgs FC - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13260-0010
Detail Dwgs - Pipe Sleeper FR (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13310-3101
Steel Str. Dwgs FR - Unit P/R 1st (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13310-3103
Steel Str. Dwgs FC - Unit P/R 1st (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DD-13620-0310
Piping Isometric Dwgs - A/G Issued (A50)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DH-13602-3102
Piping Information - Unit P/R 2nd (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DH-13602-3211
Piping Information - Pipe Sleeper (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-DH-13602-3700
Piping Information - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-EE-21310-0010
R2130-001: Material Procurement - Unit P/R 1st (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-EE-21310-0050
R2130-001: Fabrication - Unit P/R 2nd (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-EE-21370-0020
R2130-001: Fabrication - Stanchion (A51)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31174-0010
A510: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31300-0010
A510: Pipe Rack Transportation & Installation (A510)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31310-0005
A510: Pipe Rack (Stick Portion) - Measure, Cut, Fit-up, Weld, Paint, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31310-0010
A510: Pipe Rack (Pre-assembly) - Measure, Cut, Fit-up, Weld, Paint, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31350-0010
A510: Pipe Rack Bridge (A510)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31370-0010
A510: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31610-0010
A510: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31621-0010
A510: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31621-0020
A510: A/G Piping Hook Up Bridge Portion - Prep, Fit-up, Align, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31629-0010
A510: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31641-0010
A510: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31642-0010
A510: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A510-HB-31840-0010
A510: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13161-0010
Piping Plan FR (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13170-0010
Detail Dwgs - Paving Plan FR (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13170-1110
Detail Dwgs - Paving Plan FC (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3701
Fdn Dwgs FR - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3702
Fdn Dwgs FC - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3A01
Fdn Dwgs FR - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13251-0010
Detail Dwgs - Pit FR (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13380-0032
Steel Str. Dwgs FC - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-133A0-0010
Steel Str. Dwgs FR - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-133A0-0020
Steel Str. Dwgs FC - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13410-0001
Room Size Fix - SS300 (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13421-0010
Detail Dwgs - Structural / Architectural FR - SS300
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13421-0020
Detail Dwgs - Structural / Architectural Cpy Rvw - SS300
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13421-0030
Detail Dwgs - Structural / Architectural FC - SS300
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13421-0110
Fdn Dwgs FR - SS300 (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13421-0120
Fdn Dwgs Cpy Rvw - SS300 (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DD-13421-0130
Fdn Dwgs FC - SS300 (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DH-13602-3201
Piping Information - Eqpt Supp. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DH-13602-3700
Piping Information - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DH-13602-3800
Piping Information - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-DH-13602-3A01
Piping Information - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21370-0020
R2130-001: Fabrication - Stanchion (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-213A0-0010
R2130-001: Material Procurement - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (A52)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31161-0010
A520: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31162-0010
A520: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31174-0010
A520: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31175-0010
A520: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31230-0010
A520: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31280-0010
A520: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31320-0010
A520: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31360-0010
A520: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31370-0010
A520: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31380-0010
A520: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-313A0-0010
A520: Steel Shelter - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31510-0010
A520: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31525-0010
A520: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31581-0010
A520: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-315A1-0010
A520: TEG Generation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-315A2-0010
A520: TEG Off-Gas Recovery
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-315A9-0010
A520: Chemical Injection - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31623-0010
A520: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31629-0010
A520: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31631-0010
A520: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31632-0010
A520: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31641-0010
A520: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31642-0010
A520: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31730-0010
A520: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31750-0010
A520: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31761-0010
A520: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-317B2-0010
A520: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-317B3-0010
A520: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31812-0010
A520: Transformer (SS300)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31822-0010
A520: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A520-HB-31840-0010
A520: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13161-0010
Piping Plan FR (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13170-0010
Detail Dwgs - Paving Plan FR (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13170-1110
Detail Dwgs - Paving Plan FC (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3701
Fdn Dwgs FR - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3702
Fdn Dwgs FC - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13231-5863
Fdn Dwgs FC - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13260-0010
Detail Dwgs - Pipe Sleeper FR (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13310-3102
Steel Str. Dwgs FC - Unit P/R (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13320-0020
Steel Str. Dwgs FC - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13410-0001
Room Size Fix - PIB-3 (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13411-0001
Fdn Dwgs FR - PIB-3 (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13411-0002
Fdn Dwgs Cpy Rvw - PIB-3 (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13411-0003
Fdn Dwgs FC - PIB-3 (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13411-0010
Detail Dwgs - Structural / Architectural FR - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13411-0020
Detail Dwgs - Structural / Architectural Cpy Rvew - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DD-13411-0030
Detail Dwgs - Structural / Architectural FC - PIB-3
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DH-13602-3101
Piping Information - Unit P/R (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DH-13602-3201
Piping Information - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DH-13602-3211
Piping Information - Pipe Sleeper (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DH-13602-3600
Piping Information - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DH-13602-3700
Piping Information - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-DH-13602-3800
Piping Information - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21320-0010
R2130-001: Material Procurement - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21370-0020
R2130-001: Fabrication - Stanchion (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A53)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31161-0010
A530: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31162-0010
A530: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31174-0010
A530: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31175-0010
A530: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31230-0010
A530: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31250-0010
A530: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31260-0010
A530: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31310-0010
A530: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31320-0010
A530: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31360-0010
A530: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31370-0010
A530: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31380-0010
A530: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31510-0010
A530: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31525-0010
A530: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31531-0010
A530: AFC - Prep, Erect, Align, Inspect, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31581-0010
A530: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31582-0010
A530: ATM Compressor - Prep, Erect, Aux Equipt, Align, Interconns, Inspect,
Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31582-0110
A530: ATM Compressor - Lube Oil Flushing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31582-0210
A530: ATM Compressor - Final Alignment & Coupling Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31582-1010
A530: HP Compressor - Prep, Erect, Aux Equipt, Align, Interconns, Inspect,
Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31582-1110
A530: HP Compressor - Lube Oil Flushing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31582-1210
A530: HP Compressor - Final Alignment & Coupling Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31621-0010
A530: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31623-0010
A530: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31629-0010
A530: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31629-0020
A530: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31631-0010
A530: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31632-0010
A530: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31641-0010
A530: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31642-0010
A530: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31682-0010
A530: Test for A/G Piping (ATM Compressor Piping) - Prep, Test, Clean,
Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31682-1010
A530: Test for A/G Piping (HP Compressor Piping) - Prep, Test, Clean,
Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31711-0010
A530: Marshalling Cabinets / PCS (PIB-3)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31730-0010
A530: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31750-0010
A530: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31761-0010
A530: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31792-0010
A530: Loop Tests (around Compressor) - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-317B2-0010
A530: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-317B3-0010
A530: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31814-0010
A530: MCC / UPS (PIB-3)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31821-0010
A530: Motor Solo Run (for ATM Compressor) - Prep, Solo-Run Test, Inspect
Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31821-1010
A530: Motor Solo Run (for HP Compressor) - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31822-0010
A530: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A530-HB-31840-0010
A530: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13161-0010
Piping Plan FR (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13170-0010
Detail Dwgs - Paving Plan FR (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13170-1110
Detail Dwgs - Paving Plan FC (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13213-0010
Elevated Concrete Str. incl. Fdn Dwgs FR (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3701
Fdn Dwgs FR - Stanchion (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13231-3A01
Fdn Dwgs FR - Steel Shelter (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13232-5101
Fdn Dwgs FR - Static Eqpt (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13272-0010
Detail Dwg - Dike FR (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13310-3102
Steel Str. Dwgs FC - Unit P/R (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13320-0020
Steel Str. Dwgs FC - Eqpt Supp. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-133A0-0010
Steel Str. Dwgs FR - Steel Shelter (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DD-133A0-0020
Steel Str. Dwgs FC - Steel Shelter (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DH-13602-3101
Piping Information - Unit P/R (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DH-13602-3201
Piping Information - Eqpt Supp. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DH-13602-3600
Piping Information - Platform & Accessway (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DH-13602-3700
Piping Information - Stanchion (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DH-13602-3800
Piping Information - Misc. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-DH-13602-3A01
Piping Information - Steel Shelter (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21320-0010
R2130-001: Material Procurement - Eqpt Supp. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21370-0020
R2130-001: Fabrication - Stanchion (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-213A0-0010
R2130-001: Material Procurement - Steel Shelter (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (A54)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31151-0010
A540: Tank Foundation - Excavate, Construct, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31161-0010
A540: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31162-0010
A540: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31174-0010
A540: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31175-0010
A540: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31210-0010
A540: Elevated Structure incl Foundation - Founds, Erect, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31230-0010
A540: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31270-0010
A540: Retaining Wall / Dike - Prep, Construction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31280-0010
A540: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31310-0010
A540: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31320-0010
A540: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31360-0010
A540: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31370-0010
A540: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31510-0010
A540: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31525-0010
A540: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31532-0010
A540: Heat Exchanger - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31540-0010
A540: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31621-0010
A540: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31623-0010
A540: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31629-0010
A540: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31629-0020
A540: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31631-0010
A540: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31632-0010
A540: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31641-0010
A540: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31642-0010
A540: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31730-0010
A540: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31750-0010
A540: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31761-0010
A540: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-317B2-0010
A540: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-317B3-0010
A540: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31822-0010
A540: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A540-HB-31840-0010
A540: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13170-0010
Detail Dwgs - Paving Plan FR (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13170-1110
Detail Dwgs - Paving Plan FC (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13213-0010
Elevated Concrete Str. incl. Fdn Dwgs FR (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13231-3701
Fdn Dwgs FR - Stanchion 1st (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13231-3711
Fdn Dwgs FR - Stanchion 2nd (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13272-0010
Detail Dwg - Dike FR (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13320-0030
Steel Str. Dwgs FR - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13320-0040
Steel Str. Dwgs FC - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13370-0010
Steel Str. Dwgs FR - Stanchion 1st (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13370-0020
Steel Str. Dwgs FC - Stanchion 1st (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13370-0110
Steel Str. Dwgs FR - Stanchion 2nd (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13370-0120
Steel Str. Dwgs FC - Stanchion 2nd (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DH-13602-3201
Piping Information - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DH-13602-3600
Piping Information - Platform & Accessway (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DH-13602-3701
Piping Information - Stanchion 1st (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DH-13602-3702
Piping Information - Stanchion 2nd (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-DH-13602-3800
Piping Information - Misc. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21310-0020
R2130-001: Fabrication - Unit P/R (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21320-0110
R2130-001: Material Procurement - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21320-0120
R2130-001: Fabrication - Eqpt Supp. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21370-0010
R2130-001: Material Procurement - Stanchion 1st (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21370-0020
R2130-001: Fabrication - Stanchion 1st (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21370-0110
R2130-001: Material Procurement - Stanchion 2nd (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21370-0120
R2130-001: Fabrication - Stanchion 2nd (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A55)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31161-0010
A550: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31162-0010
A550: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31174-0010
A550: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31175-0010
A550: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31210-0010
A550: Elevated Structure incl Foundation - Founds, Erect, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31230-0010
A550: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31270-0010
A550: Retaining Wall / Dike - Prep, Construction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31280-0010
A550: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31310-0010
A550: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31320-0010
A550: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31360-0010
A550: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31370-0010
A550: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31380-0010
A550: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31510-0010
A550: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31525-0010
A550: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31531-0010
A550: AFC - Prep, Erect, Align, Inspect, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31532-0010
A550: Heat Exchanger - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31581-0010
A550: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31582-0210
A550: Pipeline Compressor - Final Alignment & Coupling Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31582-1010
A550: C3 Compressor - Prep, Erect, Aux Equipt, Align, Interconns, Inspect,
Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31582-1210
A550: C3 Compressor - Final Alignment & Coupling Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31621-0010
A550: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31623-0010
A550: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31629-0010
A550: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31629-0020
A550: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31631-0010
A550: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31632-0010
A550: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31641-0010
A550: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31642-0010
A550: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31730-0010
A550: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31750-0010
A550: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31761-0010
A550: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31792-0010
A550: Loop Tests (around Compressor) - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-317B2-0010
A550: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-317B3-0010
A550: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31821-0010
A550: Motor Solo Run (for Pipeline Compressor) - Prep, Solo-Run Test, Inspect
Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31821-1010
A550: Motor Solo Run (for C3 Compressor) - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31822-0010
A550: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A550-HB-31840-0010
A550: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-DD-13620-0310
Piping Isometric Dwgs - A/G Issued (A60)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31154-0010
A600: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31156-0010
A600: Duct Bank - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31163-0010
A600: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31171-0010
A600: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31177-0010
A600: Marl Cap - Excavate, Marl Fill, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31179-0010
A600: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-315D3-0010
A600: Fire Fighting Equipment - Prep, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31610-0010
A600: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31660-0020
A600: PWHT Field Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31671-0010
A600: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31671-0020
A600: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31682-0010
A600: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31683-0010
A600: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31783-0010
A600: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31784-0010
A600: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31791-0010
A600: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31792-0010
A600: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-317A2-0010
A600: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-317A3-0010
A600: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-317A4-0010
A600: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-317A5-0010
A600: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31821-0010
A600: Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31826-0010
A600: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31827-0010
A600: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31828-0010
A600: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31830-0010
A600: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-3196H-0010
A600: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-3196H-0020
A600: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31A61-0010
A600: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31A63-0010
A600: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-HB-31AA0-0010
A600: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-J1-39200-0010
A600: Chemical Cleaning / Leak Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-J1-39200-0020
A600: Final Completion & Handover Activities to MC - Crude Storage & Shipping
Project: CCC-Zuluf-L3-UPDT-01 Activity: A600-J3-39500-0010
A600: Final Walkdown Crude Storage & Shipping
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3101
Fdn Dwgs FR - Unit P/R (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3260
Fdn Dwgs FR - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3261
Fdn Dwgs FC - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3701
Fdn Dwgs FR - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13231-3702
Fdn Dwgs FC - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13260-0010
Detail Dwgs - Pipe Sleeper FR (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13310-0110
Steel Str. Dwgs FR - Unit P/R (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13310-0130
Steel Str. Dwgs FC - Unit P/R (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DH-13602-3101
Piping Information - Unit P/R (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DH-13602-3700
Piping Information - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-DH-13602-3800
Piping Information - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21310-3101
R2130-001: Material Procurement - Unit P/R (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21370-0020
R2130-001: Fabrication - Stanchion (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A61)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31174-0010
A610: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31230-0010
A610: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31260-0010
A610: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31310-0010
A610: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31320-0010
A610: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31370-0010
A610: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31380-0010
A610: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31610-0010
A610: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31621-0010
A610: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31629-0010
A610: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31641-0010
A610: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31642-0010
A610: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A610-HB-31840-0010
A610: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13170-0010
Detail Dwgs - Paving Plan FR (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13170-1110
Detail Dwgs - Paving Plan FC (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3271
Fdn Dwgs FR - Eqpt Supp, Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3701
Fdn Dwgs FR - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3702
Fdn Dwgs FC - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13260-0010
Detail Dwgs - Pipe Sleeper FR (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp, Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13320-0020
Steel Str. Dwgs FC - Eqpt Supp, Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DH-13602-3231
Piping Information - Eqpt Supp, Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DH-13602-3600
Piping Information - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DH-13602-3700
Piping Information - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-DH-13602-3800
Piping Information - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21310-0010
R2130-001: Material Procurement - Eqpt Supp, Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21370-0010
R2130-001: Material Procurement - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21370-0020
R2130-001: Fabrication - Stanchion (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A62)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31161-0010
A620: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31162-0010
A620: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31174-0010
A620: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31175-0010
A620: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31230-0010
A620: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31250-0010
A620: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31260-0010
A620: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31280-0010
A620: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31360-0010
A620: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31370-0010
A620: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31380-0010
A620: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31581-0010
A620: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31581-0110
A620: Crude Shipping Pumps - Lube Oil Flushing
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31623-0010
A620: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31629-0010
A620: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31629-0020
A620: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31631-0010
A620: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31632-0010
A620: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31641-0010
A620: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31642-0010
A620: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31730-0010
A620: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31761-0010
A620: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-317B2-0010
A620: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-317B3-0010
A620: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31822-0010
A620: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A620-HB-31840-0010
A620: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13151-0110
Detail Dwgs - Fdn Plan/Layout/Section FR 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13151-5411
Fdn Dwgs FR - Tank A84-D-0120A/B (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13152-0030
Detail Dwgs - Grading/Paving/Earthwork Earth Dike FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13170-0010
Detail Dwgs - Paving Plan FR (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13170-1110
Detail Dwgs - Paving Plan FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3701
Fdn Dwgs FR - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3702
Fdn Dwgs FC - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3711
Fdn Dwgs FR - Stanchion 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3712
Fdn Dwgs FC - Stanchion 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3A01
Fdn Dwgs FR - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13260-0010
Detail Dwgs - Pipe Sleeper FR (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13272-0010
Detail Dwg - Dike FR (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13272-0030
Detail Dwg - Dike FC (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13370-0020
Steel Str. Dwgs FC - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13370-0110
Steel Str. Dwgs FR - Stanchion 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13370-0120
Steel Str. Dwgs FC - Stanchion 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-133A0-0010
Steel Str. Dwgs FR - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DD-133A0-0020
Steel Str. Dwgs FC - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DH-13602-3600
Piping Information - Platform & Accessway (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DH-13602-3701
Piping Information - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DH-13602-3702
Piping Information - Stanchion 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DH-13602-3800
Piping Information - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-DH-13602-3A01
Piping Information - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21370-0010
R2130-001: Material Procurement - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21370-0020
R2130-001: Fabrication - Stanchion 1st (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21370-0120
R2130-001: Fabrication - Stanchion 2nd (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-213A0-0010
R2130-001: Material Procurement - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (A63)
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31152-0010
A630: Earth Dike - Prep, Construct, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31161-0010
A630: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31162-0010
A630: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31174-0010
A630: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31175-0010
A630: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31230-0010
A630: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31260-0010
A630: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31270-0010
A630: Retaining Wall / Dike - Prep, Construction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31280-0010
A630: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31370-0010
A630: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31380-0010
A630: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-313A0-0010
A630: Steel Shelter - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31540-0010
A630: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31581-0010
A630: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-315A9-0010
A630: Chemical Injection - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31623-0010
A630: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31629-0010
A630: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31629-0020
A630: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31631-0010
A630: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31632-0010
A630: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31641-0010
A630: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31642-0010
A630: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31730-0010
A630: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31761-0010
A630: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-317B2-0010
A630: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-317B3-0010
A630: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31822-0010
A630: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31840-0010
A630: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: A630-HB-31871-0010
A630: Cathodic Protection - Excavate, Cables/Anodes, Connection, Backfill,
Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DD-13630-0010
Piping Isometric Dwgs - U/G (Main ring) (B00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DD-13630-10 Piping
Isometric Dwgs - U/G (Area) (B00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DG-13832-0030
B000: Lighting Layout Plan & Diagram FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DG-13832-0040
B000: Lighting Layout Plan & Diagram FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DG-13832-0050
B000: Lighting Layout Plan & Diagram FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13780-1130
B000: Instrument Piping/Installation Detail FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13780-1140
B000: Instrument Piping/Installation Detail Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13780-1150
B000: Instrument Piping/Installation Detail FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13780-1160
B000: Instrument Points & Lines FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13780-1170
B000: Instrument Points & Lines Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13780-1180
B000: Instrument Points & Lines FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13781-1130
B000: Instrument Cable Trench Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13781-1140
B000: Instrument Cable Trench Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13781-1150
B000: Instrument Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13782-1100
B000: Instrument Main Cable Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13782-1110
B000: Instrument Main Cable Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13782-1120
B000: Instrument Main Cable Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13784-1130
B000: Instrument Air Pipe Arrangement FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13784-1140
B000: Instrument Air Pipe Arrangement Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13784-1150
B000: Instrument Air Pipe Arrangement FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13826-0080
B000: Electrical Cable Route Plan FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13828-0030
B000: Electrical Cable Tray Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13828-0040
B000: Electrical Cable Tray Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13828-0050
B000: Electrical Cable Tray Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13829-0060
B000: Electrical Cable Trench Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13829-0070
B000: Electrical Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13841-0050
B000: Grounding Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13870-1020
B000: Cathodic Protection System Layout FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B000-DL-13870-1030
B000: Cathodic Protection System Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-DC-13820-0470
B100: Cable and Conduit Schedule Layout SS400 FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-DC-13820-0480
B100: Cable and Conduit Schedule Layout SS400 FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-DC-13820-0490
B100: Cable and Conduit Schedule Layout SS400 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-DL-13810-1520
B100: Equipment Layout SS400 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31153-0010
B100: Trench For Cabling - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31154-0010
B100: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31156-0010
B100: Duct Bank - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31163-0010
B100: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31171-0010
B100: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31177-0010
B100: Marl Cap - Excavate, Marl Fill, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31179-0010
B100: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31411-1410
B100: SUBSTATION-400 - Building Foundation (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31411-4110
B100: Line Maintenance Building 1-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31411-4210
B100: Line Maintenance Building 2-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31411-4310
B100: Line Maintenance Building 3-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31411-5410
B100: OPERATION SHELTER-4-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31411-6110
B100: EMERGENCY GENERATOR BUILDING-Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31412-4110
B100: Line Maintenance Building 1-Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31412-4210
B100: Line Maintenance Building 2-Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31412-4310
B100: Line Maintenance Building 3-Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31412-5410
B100: OPERATION SHELTER-4-Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31413-1410
B100: SUBSTATION-400 - Roof/Ext Wall (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31413-4110
B100: Line Maintenance Building 1-Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31413-4210
B100: Line Maintenance Building 2-Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31413-4310
B100: Line Maintenance Building 3-Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31413-5410
B100: OPERATION SHELTER-4-Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31413-6110
B100: EMERGENCY GENERATOR BUILDING-Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31414-1410
B100: SUBSTATION-400 - Interior / Exterior Finish (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31414-4110
B100: Line Maintenance Building 1-Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31414-4210
B100: Line Maintenance Building 2-Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31414-4310
B100: Line Maintenance Building 3-Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31414-5410
B100: OPERATION SHELTER-4-Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31414-6110
B100: EMERGENCY GENERATOR BUILDING-Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31415-1410
B100: SUBSTATION-400 - HVAC Work (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31415-4110
B100: Line Maintenance Building 1-HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31415-4210
B100: Line Maintenance Building 2-HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31415-4310
B100: Line Maintenance Building 3-HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31415-5410
B100: OPERATION SHELTER-4-HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31415-6110
B100: EMERGENCY GENERATOR BUILDING-HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31416-1410
B100: SUBSTATION-400 - Plumbing / Drainage (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31416-4110
B100: Line Maintenance Building 1-Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31416-4210
B100: Line Maintenance Building 2-Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31416-4310
B100: Line Maintenance Building 3-Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31416-5410
B100: OPERATION SHELTER-4-Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31416-6110
B100: EMERGENCY GENERATOR BUILDING-Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31417-1410
B100: SUBSTATION-400 - Buiding Electrical (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31417-4110
B100: Line Maintenance Building 1-Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31417-4210
B100: Line Maintenance Building 2-Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31417-4310
B100: Line Maintenance Building 3-Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31417-5410
B100: OPERATION SHELTER-4-Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31417-6110
B100: EMERGENCY GENERATOR BUILDING-Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31418-1410
B100: SUBSTATION-400 - Fire Protection (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31418-4110
B100: Line Maintenance Building 1-Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31418-4210
B100: Line Maintenance Building 2-Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31418-4310
B100: Line Maintenance Building 3-Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31418-5410
B100: OPERATION SHELTER-4-Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31418-6110
B100: EMERGENCY GENERATOR BUILDING-Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-315D3-0010
B100: Fire Fighting Equipment - Prep, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31610-0010
B100: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31671-0010
B100: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31671-0020
B100: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31682-0010
B100: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31683-0010
B100: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31783-0010
B100: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31784-0010
B100: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31791-0010
B100: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31792-0010
B100: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-317A2-0010
B100: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-317A3-0010
B100: Instrument Main Cabling (U/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-317A3-0020
B100: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-317A4-0010
B100: Instrument Cable Termination (U/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-317A4-0020
B100: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-317A5-0010
B100: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31821-0010
B100: Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31826-0010
B100: Electrical Main Feeder Cabling (U/G) - Excavate, Base, Cable Lay,
Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31826-0020
B100: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31827-0010
B100: Main Feeder Cable Term & Splice (U/G) - Incl Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31827-0020
B100: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31828-0010
B100: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31830-0010
B100: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31866-0010
B100: Communication Cabling - Prep, Lay & Dress, Continuity/Attenuation,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-3195C-0010
B100: Cold Insulation (Equipment) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-3196C-0010
B100: Cold Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-3196C-0020
B100: Cold Insulation for Valve - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-3196H-0010
B100: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-3196H-0020
B100: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31A61-0010
B100: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31A63-0010
B100: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-HB-31AA0-0010
B100: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-J1-39200-0010
B100: Chemical Cleaning / Leak Test (B10)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-J1-39200-0020
B100: Final Completion & Handover Activities to MC - Utilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: B100-J3-39500-0010
B100: Final Walkdown Utilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-DD-13260-0010
Detail Dwgs - Pipe Sleeper FR (B11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-DD-13260-0030
Detail Dwgs - Pipe Sleeper FC (B11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-EE-21310-0020
R2130-001: Fabrication - Unit P/R (B11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31174-0010
B110: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31175-0010
B110: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31230-0010
B110: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31260-0010
B110: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31280-0010
B110: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31310-0010
B110: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31610-0010
B110: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31621-0010
B110: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31629-0010
B110: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31641-0010
B110: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31642-0010
B110: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B110-HB-31840-0010
B110: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13170-0010
Detail Dwgs - Paving Plan FR (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13231-3701
Fdn Dwgs FR - Stanchion (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13231-3702
Fdn Dwgs FC - Stanchion (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13231-3A01
Fdn Dwgs FR - Steel Shelter (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13251-0010
Detail Dwgs - Pit FR (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-133A0-0010
Steel Str. Dwgs FR - Steel Shelter (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-133A0-0020
Steel Str. Dwgs FC - Steel Shelter (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DH-13602-3600
Piping Information - Platform & Accessway (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DH-13602-3700
Piping Information - Stanchion (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DH-13602-3800
Piping Information - Misc. Str. (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-DH-13602-3A01
Piping Information - Steel Shelter (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-EE-21370-0010
R2130-001: Material Procurement - Stanchion (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-EE-21370-0020
R2130-001: Fabrication - Stanchion (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-EE-213A0-0010
R2130-001: Material Procurement - Steel Shelter (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (B12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31151-0010
B120: Tank Foundation - Excavate, Construct, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31161-0010
B120: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31162-0010
B120: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31174-0010
B120: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31175-0010
B120: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31230-0010
B120: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31250-0010
B120: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31280-0010
B120: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31360-0010
B120: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31370-0010
B120: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31380-0010
B120: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-313A0-0010
B120: Steel Shelter - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31510-0010
B120: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31525-0010
B120: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31540-0010
B120: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31581-0010
B120: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31582-0010
B120: Air Compressor - Prep, Erect, Aux Equipt, Align, Interconns, Inspect,
Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31582-0110
B120: Air Compressor - Lube Oil Flushing
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-315A2-0010
B120: Vaccum Deaerator
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-315A5-0010
B120: Instrument Air Dryer
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-315A6-0010
B120: Nitrogen Generation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-315A6-0020
B120: Liquid N2 Storage & Vaporization
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-315A9-0010
B120: Chemical Injection - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31623-0010
B120: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31629-0010
B120: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31629-0020
B120: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31631-0010
B120: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31632-0010
B120: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31641-0010
B120: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31642-0010
B120: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31730-0010
B120: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31750-0010
B120: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31761-0010
B120: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-317B2-0010
B120: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-317B3-0010
B120: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31822-0010
B120: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31840-0010
B120: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B120-HB-31871-0010
B120: Cathodic Protection - Excavate, Cables/Anodes, Connection, Backfill,
Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13170-0010
Detail Dwgs - Paving Plan FR (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3103
Fdn Dwgs FC - Unit P/R (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3701
Fdn Dwgs FR - Stanchion (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3702
Fdn Dwgs FC - Stanchion (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3821
Fdn Dwgs FR - Misc. Str. 2nd (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3822
Fdn Dwgs FC - Misc. Str. 2nd (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3A01
Fdn Dwgs FR - Steel Shelter (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13232-5101
Fdn Dwgs FR - Static Eqpt (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13232-5103
Fdn Dwgs FC - Static Eqpt (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13232-5803
Fdn Dwgs FC - Rotating Eqpt (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13310-0730
Steel Str. Dwgs FC - Unit P/R (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13380-0110
Steel Str. Dwgs FR - Misc. Str. 2nd (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13380-0120
Steel Str. Dwgs FC - Misc. Str. 2nd (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-133A0-0010
Steel Str. Dwgs FR - Steel Shelter (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-133A0-0020
Steel Str. Dwgs FC - Steel Shelter (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DD-13620-0010
Piping Isometric Dwgs - A/G Issued (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DH-13602-3600
Piping Information - Platform & Accessway (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DH-13602-3700
Piping Information - Stanchion (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DH-13602-3802
Piping Information - Misc. Str. 2nd (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-DH-13602-3A01
Piping Information - Steel Shelter (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-21310-0020
R2130-001: Fabrication - Unit P/R (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-21370-0010
R2130-001: Material Procurement - Stanchion (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-21370-0020
R2130-001: Fabrication - Stanchion (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-21380-0110
R2130-001: Material Procurement - Misc. Str. 2nd (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-21380-0120
R2130-001: Fabrication - Misc. Str. 2nd (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-213A0-0010
R2130-001: Material Procurement - Steel Shelter (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (B13)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31151-0010
B130: Tank Foundation - Excavate, Construct, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31161-0010
B130: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31162-0010
B130: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31174-0010
B130: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31175-0010
B130: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31230-0010
B130: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31280-0010
B130: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31310-0010
B130: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31360-0010
B130: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31370-0010
B130: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31380-0010
B130: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-313A0-0010
B130: Steel Shelter - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31510-0010
B130: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31540-0010
B130: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-315A2-0010
B130: Drinking Water Treatment
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-315A9-0010
B130: Chemical Injection - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31621-0010
B130: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31623-0010
B130: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31629-0010
B130: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31629-0020
B130: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31631-0010
B130: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31632-0010
B130: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31641-0010
B130: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31642-0010
B130: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31730-0010
B130: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31750-0010
B130: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31761-0010
B130: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-317B2-0010
B130: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-317B3-0010
B130: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31822-0010
B130: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31840-0010
B130: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B130-HB-31871-0010
B130: Cathodic Protection - Excavate, Cables/Anodes, Connection, Backfill,
Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13161-0030
Piping Plan FC (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13162-0110
Detail Dwgs - Manhole/Box (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13176-0010
Detail Dwgs - Paving Plan FR (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13231-3822
Fdn Dwgs FC - Unit P/R (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13421-0001
Room Size Fix - SS400 (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13421-0010
Detail Dwgs - Structural / Architectural FR 1st - SS400
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13421-0020
Detail Dwgs - Structural / Architectural Cpy Rvw - SS400
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13421-0030
Detail Dwgs - Structural / Architectural FC 1st - SS400
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13421-0110
Fdn Dwgs FR - SS400 (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13421-0120
Fdn Dwgs Cpy Rvw - SS400 (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13421-0130
Fdn Dwgs FC - SS400 (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DH-13602-3600
Piping Information - Platform & Accessway (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DH-13602-3700
Piping Information - Stanchion (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-DH-13602-3800
Piping Information - Misc. Str. (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-EE-21370-0010
R2130-001: Material Procurement - Stanchion (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-EE-21370-0020
R2130-001: Fabrication - Stanchion (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (B14)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-EE-21400-0001
R2140-001: Material Procurement & Fabrication - Precast Concrete Materials
for Building Wall & Floor - SS400
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-EE-21400-0002
R2140-001: 1st Delivery - Precast Concrete Materials for Building Wall &
Floor - SS400
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31161-0010
B140: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31162-0010
B140: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31230-0010
B140: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31250-0010
B140: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31360-0010
B140: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31380-0010
B140: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31550-4110
B140:Overhead Crane (LMB-1)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31550-4210
B140:Overhead Crane (LMB-2)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31550-4310
B140:Overhead Crane (LMB-3)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31629-0010
B140: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31631-0010
B140: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31632-0010
B140: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31710-0010
B140: Instrument Panel (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31730-0010
B140: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31761-0010
B140: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-317B2-0010
B140: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-317B3-0010
B140: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31811-0010
B140: Power Generator
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31812-0010
B140: Transformer (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31814-0010
B140: SWGR / MCC (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B140-HB-31822-0010
B140: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DC-13820-0500
B200: Cable and Conduit Schedule Layout SS600 FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DC-13820-0510
B200: Cable and Conduit Schedule Layout SS600 FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DC-13820-0520
B200: Cable and Conduit Schedule Layout SS600 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DL-13780-1130
B200: Instrument Equipment Layout FR - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DL-13780-1140
B200: Instrument Equipment Layout Cpy Rvw - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DL-13780-1150
B200: Instrument Equipment Layout FC - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DL-13780-1160
B200: Cable Tray Layout FR - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DL-13780-1170
B200: Cable Tray Layout Cpy Rvw - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DL-13780-1180
B200: Cable Tray Layout FC - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-DL-13810-0550
B200: Equipment Layout SS600 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31153-0010
B200: Trench For Cabling - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31156-0010
B200: Duct Bank - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31163-0010
B200: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31171-0010
B200: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31177-0010
B200: Marl Cap - Excavate, Marl Fill, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31179-0010
B200: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31411-1610
B200: SUBSTATION-600 - Building Foundation (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31411-3410
B200: PIB-4 - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31412-3410
B200: PIB-4 - Superstructure
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31413-1610
B200: SUBSTATION-600 - Roof/Ext Wall (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31413-3410
B200: PIB-4 - Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31414-1610
B200: SUBSTATION-600 - Interior / Exterior Finish (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31414-3410
B200: PIB-4 - Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31415-1610
B200: SUBSTATION-600 - HVAC Work (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31415-3410
B200: PIB-4 - HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31416-1610
B200: SUBSTATION-600 - Plumbing / Drainage (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31416-3410
B200: PIB-4 - Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31417-1610
B200: SUBSTATION-600 - Buiding Electrical (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31417-3410
B200: PIB-4 - Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31418-1610
B200: SUBSTATION-600 - Fire Protection (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31418-3410
B200: PIB-4 - Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31610-0010
B200: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31660-0010
B200: PWHT Shop Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31660-0020
B200: PWHT Field Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31671-0010
B200: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31671-0020
B200: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31682-0010
B200: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31683-0010
B200: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31783-0010
B200: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31784-0010
B200: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31791-0010
B200: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31792-0010
B200: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31793-0010
B200: SAT (PIB-4)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31793-0020
B200: Software Download after IFAT & Mini-SAT (PIB-4)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-317A2-0010
B200: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-317A3-0020
B200: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-317A4-0020
B200: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-317A5-0010
B200: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31821-0010
B200: Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31826-0010
B200: Electrical Main Feeder Cabling (U/G) - Excavate, Base, Cable Lay,
Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31826-0020
B200: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31827-0010
B200: Main Feeder Cable Term & Splice (U/G) - Incl Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31827-0020
B200: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31828-0010
B200: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31830-0010
B200: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31866-0010
B200: Communication Cabling - Prep, Lay & Dress, Continuity/Attenuation,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-3195H-0010
B200: Hot Insulation (Equipment) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-3196H-0010
B200: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-3196H-0020
B200: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31A61-0010
B200: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31A63-0010
B200: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31AA0-0010
B200: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-HB-31B32-0010
B200: Fire Proofing LW Cement (Structure) - Prep, Mesh/Formwork, Casting,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-J1-39200-0010
B200: Chemical Cleaning / Leak Test (WIP)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-J1-39200-0020
B250: Chemical Cleaning / Leak Test (WOSEP)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-J1-39200-0030
B200: Final Completion & Handover Activities to MC - WIP
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-J3-39500-0010
B200: Final Walkdown WIP
Project: CCC-Zuluf-L3-UPDT-01 Activity: B200-J3-39500-0020
B250: Final Walkdown WOSEP & Disposal Water Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-DD-13231-3111
Fdn Dwgs FR - Unit P/R 2nd (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-DD-13310-0810
Steel Str. Dwgs FR - Unit P/R 1st (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-DD-13310-0830
Steel Str. Dwgs FC - Unit P/R 1st (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-DD-13310-1830
Steel Str. Dwgs FR - Unit P/R 2nd (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-DD-13310-1840
Steel Str. Dwgs FC - Unit P/R 2nd (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-EE-21310-0010
R2130-001: Material Procurement - Unit P/R 1st (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-EE-21310-0020
R2130-001: Fabrication - Unit P/R 1st (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-EE-21310-0110
R2130-001: Material Procurement - Unit P/R 2nd (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-EE-21310-0120
R2130-001: Fabrication - Unit P/R 2nd (B21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31174-0010
B210: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31280-0010
B210: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31310-0010
B210: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31610-0010
B210: Piping Prefabrication (for Pipe Rack) - Cut, Bevel, Fit-up, Weld,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31621-0010
B210: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31629-0010
B210: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31641-0010
B210: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31642-0010
B210: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31761-0010
B210: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B210-HB-31840-0010
B210: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13170-0010
Detail Dwgs - Paving Plan FR (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3101
Fdn Dwgs FR - Unit P/R (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3121
Fdn Dwgs FR - Eqpt Supp. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3701
Fdn Dwgs FR - Stanchion (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13310-0710
Steel Str. Dwgs FR - Unit P/R (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13310-0730
Steel Str. Dwgs FC - Unit P/R (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13320-0020
Steel Str. Dwgs FC - Eqpt Supp. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13410-0001
Room Size Fix - PIB-4 (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13411-0010
Detail Dwgs - Structural / Architectural FR - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13411-0020
Detail Dwgs - Structural / Architectural Cpy Rvw - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13411-0030
Detail Dwgs - Structural / Architectural FC - PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13411-0130
Fdn Dwgs FC - PIB-4 (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13420-0001
Room Size Fix - SS600 (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13421-0010
Detail Dwgs - Structural / Architectural FR 1st - SS600
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13421-0020
Detail Dwgs - Structural / Architectural Cpy Rvw - SS600
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13421-0030
Detail Dwgs - Structural / Architectural FC 1st - SS600
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13421-0110
Fdn Dwgs FR - SS600 (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13421-0120
Fdn Dwgs Cpy Rvw - SS600 (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13421-0130
Fdn Dwgs FC - SS600 (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DD-13620-0510
Piping Isometric Dwgs - A/G Issued (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DH-13602-3111
Piping Information - Eqpt Supp. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DH-13602-3600
Piping Information - Platform & Accessway (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DH-13602-3700
Piping Information - Stanchion (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-DH-13602-3800
Piping Information - Misc. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21310-0020
R2130-001: Fabrication - Unit P/R (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21310-0110
R2130-001: Material Procurement - Eqpt Supp. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21310-0120
R2130-001: Fabrication - Eqpt Supp. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21370-0010
R2130-001: Material Procurement - Stanchion (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21370-0020
R2130-001: Fabrication - Stanchion (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (B22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21400-0001
R2140-001: Material Procurement & Fabrication - Precast Concrete Materials
for Building Wall & Floor - SS600
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21400-0002
R2140-001: 1st Delivery - Precast Concrete Materials for Building Wall &
Floor - SS600
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21400-0270
R2140-001: Material Procurement & Fabrication - Precast Concrete Materials
for Building Wall & Floor PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-EE-21400-0280
R2140-001: 1st Delivery - Precast Concrete Materials for Building Wall &
Floor PIB-4
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31161-0010
B220: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31162-0010
B220: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31174-0010
B220: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31175-0010
B220: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31280-0010
B220: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31310-0010
B220: Pipe Rack & Cable Rack
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31360-0010
B220: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31370-0010
B220: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31380-0010
B220: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31581-0010
B220: Pumps (WIP) - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31581-0110
B220: Pump (WIP) - Lube Oil Flushing
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31581-0210
B220: Pump (WIP) - Final Alignment & Coupling Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31621-0010
B220: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31623-0010
B220: A/G Piping Around Equipment (before WIP) - Prep, Erect, Weld, Valves,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31623-0110
B220: A/G Piping Around Equipment (after WIP) - Prep, Erect, Weld, Valves,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31629-0010
B220: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31629-0020
B220: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31631-0010
B220: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31632-0010
B220: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31641-0010
B220: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31642-0010
B220: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31711-0010
B220: Marshalling Cabinets / PCS (PIB-4)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31711-0020
B220: Instrument Panel (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31718-0010
B220: Console & System Cabinets / PCS (PIB-4)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31730-0010
B220: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31750-0010
B220: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31761-0010
B220: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-317B2-0010
B220: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-317B3-0010
B220: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31812-0010
B220: Transformer (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31814-0010
B220: SWGR / MCC (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31814-0020
B220: MCC / UPS (PIB-4)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31821-0010
B220: Motor Solo Run (WIP) - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31822-0010
B220: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B220-HB-31840-0010
B220: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13170-0010
Detail Dwgs - Paving Plan FR (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13231-3101
Fdn Dwgs FR - Unit P/R (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13310-0710
Steel Str. Dwgs FR - Unit P/R (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13310-0730
Steel Str. Dwgs FC - Unit P/R (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13320-0020
Steel Str. Dwgs FC - Eqpt Supp. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DH-13602-3101
Piping Information - Unit P/R (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DH-13602-3201
Piping Information - Eqpt Supp. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DH-13602-3600
Piping Information - Platform & Accessway (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-DH-13602-3800
Piping Information - Misc. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-EE-21310-0020
R2130-001: Fabrication - Unit P/R (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-EE-21320-0010
R2130-001: Material Procurement - Eqpt Supp. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (B23)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31174-0010
B230: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31230-0010
B230: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31280-0010
B230: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31320-0010
B230: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31360-0010
B230: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31380-0010
B230: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31623-0010
B230: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31629-0010
B230: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31629-0020
B230: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31631-0010
B230: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31632-0010
B230: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31641-0010
B230: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31642-0010
B230: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31730-0010
B230: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31750-0010
B230: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31761-0010
B230: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31770-0010
B230: Metering System
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-317B2-0010
B230: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-317B3-0010
B230: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31822-0010
B230: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B230-HB-31840-0010
B230: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13170-0010
Detail Dwgs - Paving Plan FR (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3101
Fdn Dwgs FR - Unit P/R (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3262
Fdn Dwgs FC - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3701
Fdn Dwgs FR - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3702
Fdn Dwgs FC - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3A01
Fdn Dwgs FR - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13231-3A03
Fdn Dwgs FC - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13272-0010
Detail Dwg - Dike FR (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13310-0810
Steel Str. Dwgs FR - Unit P/R (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13310-0830
Steel Str. Dwgs FC - Unit P/R (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-133A0-0010
Steel Str. Dwgs FR - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-133A0-0020
Steel Str. Dwgs FC - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DH-13602-3101
Piping Information - Unit P/R (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DH-13602-3600
Piping Information - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DH-13602-3700
Piping Information - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DH-13602-3800
Piping Information - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-DH-13602-3A01
Piping Information - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-21310-0010
R2130-001: Material Procurement - Unit P/R (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-21310-0020
R2130-001: Fabrication - Unit P/R (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-21370-0010
R2130-001: Material Procurement - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-21370-0020
R2130-001: Fabrication - Stanchion (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-213A0-0010
R2130-001: Material Procurement - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (B24)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31151-0010
B240: Tank Foundation - Excavate, Construct, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31161-0010
B240: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31162-0010
B240: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31174-0010
B240: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31175-0010
B240: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31230-0010
B240: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31250-0010
B240: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31270-0010
B240: Retaining Wall / Dike - Prep, Construction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31280-0010
B240: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31310-0010
B240:Pipe Rack (Bridge)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31360-0010
B240: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31370-0010
B240: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31380-0010
B240: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-313A0-0010
B240: Steel Shelter - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31540-0010
B240: Storage Tank - Base, Wall Plates, Roof, Connections, Hydrotest, Clean,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-315A9-0010
B240: Chemical Injection - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31623-0010
B240: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31629-0010
B240: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31629-0020
B240: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31631-0010
B240: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31632-0010
B240: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31641-0010
B240: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31642-0010
B240: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31730-0010
B240: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31761-0010
B240: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-317B2-0010
B240: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-317B3-0010
B240: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31822-0010
B240: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B240-HB-31840-0010
B240: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13151-0010
Detail Dwgs - Fdn Plan/Layout/Section FR (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13170-0010
Detail Dwgs - Paving Plan FR (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3701
Fdn Dwgs FR - Stanchion (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13231-3A01
Fdn Dwgs FR - Steel Shelter (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13232-5101
Fdn Dwgs FR - Static Eqpt (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13232-5801
Fdn Dwgs FR - Rotating Eqpt (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13272-0010
Detail Dwg - Dike FR (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13320-0020
Steel Str. Dwgs FC - Eqpt Supp. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-133A0-0010
Steel Str. Dwgs FR - Steel Shelter (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-133A0-0020
Steel Str. Dwgs FC - Steel Shelter (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DH-13602-3201
Piping Information - Eqpt Supp. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DH-13602-3600
Piping Information - Platform & Accessway (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DH-13602-3700
Piping Information - Stanchion (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DH-13602-3800
Piping Information - Misc. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-DH-13602-3A01
Piping Information - Steel Shelter (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-21320-0010
R2130-001: Material Procurement - Eqpt Supp. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-21370-0010
R2130-001: Material Procurement - Stanchion (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-21370-0020
R2130-001: Fabrication - Stanchion (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-213A0-0010
R2130-001: Material Procurement - Steel Shelter (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-EE-213A0-0020
R2130-001: Fabrication - Steel Shelter (B25)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31161-0010
B250: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31162-0010
B250: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31174-0010
B250: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31175-0010
B250: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31230-0010
B250: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31270-0010
B250: Retaining Wall / Dike - Prep, Construction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31320-0010
B250: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31360-0010
B250: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31370-0010
B250: Stanchion - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31380-0010
B250: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-313A0-0010
B250: Steel Shelter - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31510-0010
B250: Vessels - Prep, Erect, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31525-0010
B250: Platform - Place, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31581-0010
B250: Pumps (WOSEP) - Prep, Erect, Grout, Align/Piping Connection, Motor
Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31581-0110
B250: Pump (WOSEP) - Lube Oil Flushing
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-315A8-0010
B250: Water Oil Separator
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-315A9-0010
B250: Chemical Injection - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31623-0010
B250: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31629-0010
B250: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31629-0020
B250: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31631-0010
B250: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31632-0010
B250: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31641-0010
B250: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31642-0010
B250: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31682-0010
B250: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31730-0010
B250: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31750-0010
B250: Analyzer - Supports, Installation, Connections, Calibration, Inspect &
Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31761-0010
B250: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31783-0010
B250: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31784-0010
B250: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31792-0010
B250: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-317B2-0010
B250: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-317B3-0010
B250: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31821-10 B250:
Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31822-0010
B250: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31840-0010
B250: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-3196H-0010
B250: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-3196H-0020
B250: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31A63-0010
B250: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-HB-31AA0-0010
B250: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B250-J1-39200-0040
B250: Final Completion & Handover Activities to MC - WOSEP & Disposal Water
Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DC-13820-0530
B300: Cable and Conduit Schedule Layout SS100 FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DC-13820-0540
B300: Cable and Conduit Schedule Layout SS100 FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DC-138200-550
B300: Cable and Conduit Schedule Layout SS100 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DL-13780-1160
B300: Instrument Equipment Layout FR - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DL-13780-1170
B300: Instrument Equipment Layout Cpy Rvw - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DL-13780-1180
B300: Instrument Equipment Layout FC - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DL-13780-1190
B300: Cable Tray Layout FR - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DL-13780-2100
B300: Cable Tray Layout Cpy Rvw - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DL-13780-2110
B300: Cable Tray Layout FC - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-DL-13810-1080
B300: Equipment Layout SS100 FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31153-0010
B300: Trench For Cabling - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31163-0010
B300: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31171-0010
B300: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31179-0010
B300: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31411-1110
B300: SUBSTATION-100 - Building Foundation (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31411-2110
B300: CCB - Building Foundation
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31412-1110
B300: SUBSTATION-100 - Superstructure (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31412-2110
B300: CCB - Superstructure incl. Roof/Ext Wall
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31413-1110
B300: SUBSTATION-100 - Roof/Ext Wall (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31414-1110
B300: SUBSTATION-100 - Interior / Exterior Finish (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31414-2110
B300: CCB - Interior / Exterior Finish
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31415-1110
B300: SUBSTATION-100 - HVAC Work (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31415-2110
B300: CCB - HVAC Work
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31416-1110
B300: SUBSTATION-100 - Plumbing / Drainage (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31416-2110
B300: CCB - Plumbing / Drainage
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31417-1110
B300: SUBSTATION-100 - Buiding Electrical (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31417-2110
B300: CCB - Buiding Electrical
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31418-1110
B300: SUBSTATION-100 - Fire Protection (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31418-2110
B300: CCB - Fire Protection
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31791-0010
B300: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31792-0010
B300: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31793-0010
B300: SAT (CCB)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31793-0020
B300: Software Download after IFAT & Mini-SAT (CCB)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-317A3-0010
B300: Instrument Main Cabling (U/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-317A4-0010
B300: Instrument Cable Termination (U/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-317A5-0010
B300: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31826-0010
B300: Electrical Main Feeder Cabling (U/G) - Excavate, Base, Cable Lay,
Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31826-0020
B300: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31827-0010
B300: Main Feeder Cable Term & Splice (U/G) - Incl Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31827-0020
B300: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31828-0010
B300: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31830-0010
B300: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B300-HB-31866-0010
B300: Communication Cabling - Prep, Lay & Dress, Continuity/Attenuation,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13170-0010
Detail Dwgs - Paving Plan FR (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13181-0010
Detail Dwgs - Fence and Gate FR (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13231-3201
Fdn Dwgs FR - Eqpt Supp. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13231-3701
Fdn Dwgs FR - Stanchion (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13320-0010
Steel Str. Dwgs FR - Eqpt Supp. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13320-0020
Steel Str. Dwgs FC - Eqpt Supp. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13416-1330
Detail Dwgs - Plumbing Layout 1st FC - SS100
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DH-13602-3201
Piping Information - Eqpt Supp. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DH-13602-3600
Piping Information - Platform & Accessway (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DH-13602-3700
Piping Information - Stanchion (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-DH-13602-3800
Piping Information - Misc. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-EE-21320-0010
R2130-001: Material Procurement - Eqpt Supp. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-EE-21320-0020
R2130-001: Fabrication - Eqpt Supp. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-EE-21370-0010
R2130-001: Material Procurement - Stanchion (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-EE-21370-0020
R2130-001: Fabrication - Stanchion (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (B31)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31161-0010
B310: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31162-0010
B310: Manhole - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31230-0010
B310: Foundations (Gantry Tower ) (RC) - Excavate, Formwork/Rebar, Concrete,
Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31280-0010
B310: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31320-0010
B310: Equipment Support Structure - Erect, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31360-0010
B310: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31380-0010
B310: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31550-0010
B310: Overhead Crane (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31711-0010
B310: Instrument Panel (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31730-0010
B310: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31761-0010
B310: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-317B2-0010
B310: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-317B3-0010
B310: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31812-0010
B310: Shunt Reactor (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31813-0010
B310: GIS (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31813-0020
B310: Gantry Tower (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B310-HB-31814-0010
B310: SWGR / MCC (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13170-0010
Detail Dwgs - Paving Plan FR (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13251-0010
Detail Dwgs - Pit FR (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13410-0001
Room Size Fix - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13410-0002
Fdn Size Fix - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13411-0003
Fdn Dwgs FC - CCB (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13411-0020
Detail Dwgs - Building Cpy Rvw - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13411-0030
Detail Dwgs - Building FC - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13416-0020
Detail Dwgs - Plumbing Layout Cpy Rvw - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DD-13416-1330
Detail Dwgs - Plumbing Layout FC - CCB
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DH-13602-3600
Piping Information - Platform & Accessway (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DH-13602-3700
Piping Information - Stanchion (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-DH-13602-3800
Piping Information - Misc. Str. (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-EE-21370-0010
R2130-001: Material Procurement - Stanchion (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-EE-21370-0020
R2130-001: Fabrication - Stanchion (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (B32)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31161-0010
B320: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31174-0010
B320: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31280-0010
B320: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31360-0010
B320: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31380-0010
B320: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31711-0010
B320: Marshalling Cabinets / PCS (CCB)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31718-0010
B320: Console & System Cabinets / PCS (CCB)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31730-0010
B320: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31761-0010
B320: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-317B2-0010
B320: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-317B3-0010
B320: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31814-0010
B320: MCC / UPS (CCB)
Project: CCC-Zuluf-L3-UPDT-01 Activity: B320-HB-31840-0010
B320: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DD-13630-0010
Piping Isometric Dwgs - U/G (C00)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DG-13832-0030
C000: Lighting Layout Plan & Diagram FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DG-13832-0040
C000: Lighting Layout Plan & Diagram FR Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DG-13832-0050
C000: Lighting Layout Plan & Diagram FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13780-0190
C000: Instrument Points & Lines FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13780-0200
C000: Instrument Points & Lines Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13780-0210
C000: Instrument Points & Lines FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13781-0160
C000: Instrument Cable Trench Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13781-0170
C000: Instrument Cable Trench Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13781-0180
C000: Instrument Cable Trench Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13784-0160
C000: Instrument Air Pipe Arrangement FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13784-0170
C000: Instrument Air Pipe Arrangement Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13784-0180
C000: Instrument Air Pipe Arrangement FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13826-0120
C000: Electrical Cable Route Plan FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13828-0060
C000: Electrical Cable Tray Layout FR
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13828-0070
C000: Electrical Cable Tray Layout Cpy Rvw
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13828-0080
C000: Electrical Cable Tray Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: C000-DL-13841-0050
C000: Grounding Layout FC
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (C10)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31153-0010
C100: Trench For Cabling - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31154-0010
C100: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31155-0010
C100: Evap Pond - Excavate, Level, Bunds, Lining, Fencing, Piping/Valves,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31163-0010
C100: Open Ditch - Excavate, Formwork/Rebar, Concrete, Fencing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31171-0010
C100: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31177-0010
C100: Marl Cap - Excavate, Marl Fill, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31179-0010
C100: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31610-0010
C100: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31660-0010
C100: PWHT Shop Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31660-0020
C100: PWHT Field Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31671-0010
C100: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31671-0020
C100: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31682-0010
C100: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31683-0010
C100: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31783-0010
C100: Pressure Piping (Instrs) - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31784-0010
C100: Air Piping & Tubing - Prep, Supports, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31791-0010
C100: Instrument Calibration - Prep, Calibration, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31792-0010
C100: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-317A2-0010
C100: Instrument Main Cable Tray - Supports Fab & Erect, Install, Grounding,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-317A3-0020
C100: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-317A4-0020
C100: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-317A5-0010
C100: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31821-0010
C100: Motor Solo Run - Prep, Solo-Run Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31826-0010
C100: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31827-0010
C100: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31828-0010
C100: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31830-0010
C100: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31866-0010
C100: Communication Cabling - Prep, Lay & Dress, Continuity/Attenuation,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-3196H-0010
C100: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-3196H-0020
C100: Hot Insulation for Valves - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31A61-0010
C100: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31A63-0010
C100: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-HB-31AA0-0010
C100: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-J1-39200-0010
C100: Chemical Cleaning/Lube Oil Flushing/Leak Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C100-J1-39200-0020
C100: Final Completion & Handover Activities to MC - Flare
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13155-0010
Detail Dwgs - Burn Pit FR (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13161-0010
Piping Plan FR (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13170-0010
Detail Dwgs - Paving Plan FR (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13181-0010
Detail Dwgs - Fence and Gate FR (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3101
Fdn Dwgs FR - Unit P/R 1st (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3121
Fdn Dwgs FR - Unit P/R 2nd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3131
Fdn Dwgs FR - Unit P/R 3rd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3701
Fdn Dwgs FR - Stanchion (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13232-5101
Fdn Dwgs FR - Flare (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13250-0010
Detail Dwgs - Pit & Pond FR (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13310-0400
Steel Str. Dwgs FR - Unit P/R 1st (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13310-0420
Steel Str. Dwgs FC - Unit P/R 1st (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13310-2420
Steel Str. Dwgs FR - Unit P/R 2nd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13310-2430
Steel Str. Dwgs FC - Unit P/R 2nd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13310-3440
Steel Str. Dwgs FR - Unit P/R 3rd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13310-3450
Steel Str. Dwgs FC - Unit P/R 3rd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DH-13602-3600
Piping Information - Platform & Accessway (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DH-13602-3700
Piping Information - Stanchion (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DH-13602-3800
Piping Information - Misc. Str. (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DH-13602-4150
Piping Information - Unit P/R 1st (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DH-13602-4160
Piping Information - Unit P/R 2nd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-DH-13602-4170
Piping Information - Unit P/R 3rd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21310-3213
R2130-001: Material Procurement - Unit P/R 1st (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21310-3223
R2130-001: Fabrication - Unit P/R 1st (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21310-3293
R2130-001: Material Procurement - Unit P/R 2nd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21310-3303
R2130-001: Fabrication - Unit P/R 2nd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21310-3313
R2130-001: Material Procurement - Unit P/R 3rd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21310-3323
R2130-001: Fabrication - Unit P/R 3rd (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21370-0010
R2130-001: Material Procurement - Stanchion (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21370-0020
R2130-001: Fabrication - Stanchion (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (C11)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31161-0010
C110: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31175-0010
C110: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31230-0010
C110: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31250-0010
C110: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31280-0010
C110: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31310-0010
C110: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31360-0010
C110: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31380-0010
C110: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31570-0010
C110: Flare Stack & Burn Pit
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31581-0010
C110: Pumps - Prep, Erect, Grout, Align/Piping Connection, Motor Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31583-0010
C110: Blower & Fan
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31621-0010
C110: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31623-0010
C110: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31629-0010
C110: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31629-0020
C110: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31631-0010
C110: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31632-0010
C110: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31641-0010
C110: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31642-0010
C110: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31822-0010
C110: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C110-HB-31840-0010
C110: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13155-0010
Detail Dwgs - Pit & Pond FR (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13170-0010
Detail Dwgs - Paving Plan FR (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3101
Fdn Dwgs FR - Unit P/R 1st (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3111
Fdn Dwgs FR - Unit P/R 2nd (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3602
Fdn Dwgs FC - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3701
Fdn Dwgs FR - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3702
Fdn Dwgs FC - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13231-3802
Fdn Dwgs FC - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13232-5811
Fdn Dwgs FR - Rotating Eqpt (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13232-5A01
Fdn Dwgs FR - Packaged Eqpt (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13232-5A03
Fdn Dwgs FC - Packaged Eqpt (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13251-0010
Detail Dwgs - Pit & Pond FR (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13260-0010
Detail Dwgs - Pipe Sleeper FR (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13310-0010
Steel Str. Dwgs FR - Unit P/R 1st (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13310-0030
Steel Str. Dwgs FC - Unit P/R 1st (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13310-0050
Steel Str. Dwgs FR - Unit P/R 2nd (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13310-0060
Steel Str. Dwgs FC - Unit P/R 2nd (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DH-13602-3101
Piping Information - Unit P/R 1st (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DH-13602-3111
Piping Information - Unit P/R 2nd (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DH-13602-3600
Piping Information - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DH-13602-3700
Piping Information - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-DH-13602-3800
Piping Information - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21310-3101
R2130-001: Material Procurement - Unit P/R 1st (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21310-3103
R2130-001: Fabrication - Unit P/R 1st (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21310-3123
R2130-001: Material Procurement - Unit P/R 2nd (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21310-3133
R2130-001: Fabrication - Unit P/R 2nd (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21360-0010
R2130-001: Material Procurement - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21360-0020
R2130-001: Fabrication - Platform & Accessway (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21370-0010
R2130-001: Material Procurement - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21370-0020
R2130-001: Fabrication - Stanchion (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (C12)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31161-0010
C120: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31175-0010
C120: Concrete Paving - Excavate, Formwork/Rebar, Casting, Complete, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31230-0010
C120: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31250-0010
C120: Pit & Pond - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31260-0010
C120: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31280-0010
C120: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31310-0010
C120: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31360-0010
C120: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31380-0010
C120: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-315A8-0010
C120: Waste Water Treatment
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31621-0010
C120: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31623-0010
C120: A/G Piping Around Equipment - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31629-0010
C120: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31629-0020
C120: Field Epoxy Lining
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31631-0010
C120: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31632-0010
C120: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31641-0010
C120: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31642-0010
C120: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31730-0010
C120: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31761-0010
C120: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-317B2-0010
C120: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-317B3-0010
C120: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31822-0010
C120: Local Equipment - Prep, install, Level/Align, Grout, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C120-HB-31840-0010
C120: Grounding - Trenching, Pits, Cable Laying, Joints/Welds, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31153-0010
C200: Trench For Cabling - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31154-0010
C200: Trench For Piping - Excavate, Backfill, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31155-0010
C200: Evap Pond - Excavate, Level, Bunds, Lining, Fencing, Piping/Valves,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31156-0010
C200: Duct Bank - Excavate, Formwork/Rebar, Concrete, Backfill, Inspect CCC
Scope ?
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31171-0010
C200: Asphalt Road - Prep, Base, Asphalting, Compaction, Markings, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31177-0010
C200: Marl Cap - Excavate, Marl Fill, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31179-0010
C200: Traffic Signs - Prep, Base, Install, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31180-0010
C200: Fence & Gate - Precast, Install, Grade Beam, Backfill, Paint, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31610-0010
C200: Piping Prefabrication - Cut, Bevel, Fit-up, Weld, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31660-0010
C200: PWHT Shop Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31660-0020
C200: PWHT Field Weld
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31671-0010
C200: RT For Shop Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31671-0020
C200: RT For Field Welding
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31682-0010
C200: Test for A/G Piping - Prep, Test, Clean, Reinstate, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31683-0010
C200: Test for U/G Piping - Prep, Test, Inspect Check
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31792-0010
C200: Loop Tests - Verification, Testing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-317A3-0020
C200: Instrument Main Cabling (A/G) - Prep, Laying, Megger Test, Tagging,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-317A4-0020
C200: Instrument Cable Termination (A/G) - Prep, Terminate, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-317A5-0010
C200: Junction Box - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31826-0020
C200: Electrical Area Cabling (A/G) - Prep, Cable Pulling, Megger Tests,
Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31827-0020
C200: Electrical Cable Termination (A/G) - Prep, Terminate, Inspection &
Testing
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31828-0010
C200: Electrical Cable Tray - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31830-0010
C200: Lighting Fixtures - Prep, Erection, Connections, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-3196H-0010
C200: Hot Insulation (Piping) - Prep, Insulation, Signage, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31A61-0010
C200: Piping Paint at Shop - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31A63-0010
C200: Piping Painting (Field) - Clean, Prime, Finish, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-HB-31AA0-0010
C200: Identification Mark - Application, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-J1-39200-0010
C200: Chemical Cleaning/Lube Oil Flushing/Leak Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C200-J3-39500-0010
C200: Final Walkdown Flare, Flare Gas Recovery & Closed Drain System
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13155-0010
Detail Dwgs - Pit & Pond FR (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13170-0010
Detail Dwgs - Paving Plan FR (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13181-0010
Detail Dwgs - Fence and Gate FR (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13231-3101
Fdn Dwgs FR - Unit P/R (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13231-3701
Fdn Dwgs FR - Stanchion (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13240-0010
Detail Dwgs - Culvert FR (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13260-0010
Detail Dwgs - Pipe Sleeper FR (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13310-0010
Steel Str. Dwgs FR - Unit P/R (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13310-0030
Steel Str. Dwgs FC - Unit P/R (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DD-13620-0110
Piping Isometric Dwgs - A/G Issued (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DH-13602-3101
Piping Information - Unit P/R (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DH-13602-3600
Piping Information - Platform & Accessway (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DH-13602-3700
Piping Information - Stanchion (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-DH-13602-3800
Piping Information - Misc. Str. (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-EE-21310-3101
R2130-001: Material Procurement - Unit P/R (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-EE-21310-3103
R2130-001: Fabrication - Unit P/R (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-EE-21370-0010
R2130-001: Material Procurement - Stanchion (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-EE-21370-0020
R2130-001: Fabrication - Stanchion (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (C21)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31161-0010
C210: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31174-0010
C210: Asphalt Paving - Prep, Base, Asphalting, Compaction, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31230-0010
C210: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31240-0010
C210: Concrete Culvert
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31260-0010
C210: Pipe Sleepers - Prep, Place, inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31280-0010
C210: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31310-0010
C210: Pipe Rack - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31360-0010
C210: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31380-0010
C210: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31621-0010
C210: A/G Piping Install'n On Pipe Rack - Prep, Erect, Weld, Valves, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31629-0010
C210: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31631-0010
C210: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31632-0010
C210: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31641-0010
C210: Pipe Support Fabrication
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31642-0010
C210: Pipe Support Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31730-0010
C210: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-31761-0010
C210: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-317B2-0010
C210: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C210-HB-317B3-0010
C210: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13155-0010
Detail Dwgs - Pit & Pond FR (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13181-0010
Detail Dwgs - Fence and Gate FR (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13231-3601
Fdn Dwgs FR - Platform & Accessway (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13231-3701
Fdn Dwgs FR - Stanchion (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13231-3801
Fdn Dwgs FR - Misc. Str. (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13360-0010
Steel Str. Dwgs FR - Platform & Accessway (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13360-0020
Steel Str. Dwgs FC - Platform & Accessway (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13370-0010
Steel Str. Dwgs FR - Stanchion (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13370-0020
Steel Str. Dwgs FC - Stanchion (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13380-0010
Steel Str. Dwgs FR - Misc. Str. (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DD-13380-0020
Steel Str. Dwgs FC - Misc. Str. (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DH-13602-3600
Piping Information - Platform & Accessway (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DH-13602-3700
Piping Information - Stanchion (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-DH-13602-3800
Piping Information - Misc. Str. (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-EE-21370-0010
R2130-001: Material Procurement - Stanchion (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-EE-21370-0020
R2130-001: Fabrication - Stanchion (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-EE-21380-0010
R2130-001: Material Procurement - Misc. Str. (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-EE-21380-0020
R2130-001: Fabrication - Misc. Str. (C22)
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31161-0010
C220: Sewer Piping - Excavate, M/H, Install, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31230-0010
C220: Foundations (RC) - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31280-0010
C220: Misc Foundations - Excavate, Formwork/Rebar, Concrete, Backfill,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31360-0010
C220: Platform & Access Way - Place, Align, Bolting/Welding, Finishing,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31380-0010
C220: Misc. Structure - Erect, Align, Bolting/Welding, Finishing, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31629-0010
C220: FBE Spool Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31631-0010
C220: U/G Piping - CS w/ Lining - Excavate, M/H, Install, Backfill, Test,
Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31632-0010
C220: U/G Piping - GRE - Excavate, Lay, Joint, Backfill, Test, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31730-0010
C220: Local Instrument - Prep, Calibration, Install, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-31761-0010
C220: Fire & Gas Alarm Devices - Prep, Install, Connect, Inspect & Test
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-317B2-0010
C220: Branch Cable Way - Supports, Installation, Grounding, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: C220-HB-317B3-0010
C220: Branch Cabling - Prep, Cable Pulling, Megger Tests, Tagging, Inspect
Project: CCC-Zuluf-L3-UPDT-01 Activity: E200-HB-31230-0010
D000/E200 : Civil Works
Project: CCC-Zuluf-L3-UPDT-01 Activity: E300-DD-13231-3101
Fdn Dwgs FR - Unit P/R (E30)
Project: CCC-Zuluf-L3-UPDT-01 Activity: E300-DD-13310-0010
Steel Str. Dwgs FR - Unit P/R (E30)
Project: CCC-Zuluf-L3-UPDT-01 Activity: E300-DH-13602-3101
Piping Information - Unit P/R (E30)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1070 Place
POs for All Engineered Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1080 Place
All Purchase Orders
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1090
Complete PCS Integrated Factory Acceptance Test (IFAT)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1100
Complete Spare Part Data Packages
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1140
Complete Installation 50% of Piperack (Weight)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1150
Complete Installation of Vessels
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1160
Energization of Substation 200 (SS200)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1170
Energization of Substation 300 (SS300)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1180 PIB-1
Building ready for PCS equipment installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1190 PIB-2
Building ready for PCS equipment installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1200 PIB-3
Building ready for PCS equipment installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1220 PMCC
GOSP - 1
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1230 PMCC
GOSP - 2
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1235 GC-1b
- Construction Subcontract Formal Approval for CCC
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1240 PMCC
Gas Compression
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1250 PMCC
Crude Storage & Shipping
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1260 PMCC
WOSEP & Disposal Water Pumps
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1270 PMCC
Flare, Flare Gas Recovery & Closed Drain System
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1280 PMCC
Hot Oil System
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1290 PMCC
Main Piperack
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1300 Final
Mechanical Completion - PKG1 - IK
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1310
Complete As-Built Drawings - PKG1 - IK
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1320
Complete Project Record Books - PKG1 - IK
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG1-M1-1330
Project Completion and Demobilization
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1070 Place
POs for All Engineered Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1090
Complete PCS Integrated Factory Acceptance Test (IFAT)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1150
Complete Installation 50% of Piperack (Weight)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1160
Complete Installation of Vessels and Tanks Installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1170
Energization of Substation 400 (SS400)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1180
Energization of Substation 100 (SS100)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1190
Energization of Substation 600 (SS600)
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1200 CCB
Building ready for PCS equipment installation
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1210
Complete PIBs PCS SAT
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1220 PMCC
Utilities
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1230 PMCC
WIP
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1240 Final
Mechanical Completion - PKG2 - IK
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1250
Complete As-Built Drawings
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1260
Complete Project Record Books
Project: CCC-Zuluf-L3-UPDT-01 Activity: IK-PKG2-M1-1270
Project Completion and Demobilization
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1050
Complete 60% Design Review (Including CAD Model)
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1060 Issue
FC Drawings for all Substations and PIBs
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1070
Complete Preliminary Design Review (PDR) for PCS
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1110
Complete FINAL DESIGN Review (90% Progress)
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1120
Complete E-walkthrough and Final 3D Model Review
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1130 Issue
all FC drawings and documents
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1150 Final
Mechanical Completion - PKG1 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1160
Complete As-Built Drawings - PKG1 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1170
Complete Project Record Books - PKG1 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1180
Project Completion and Demobilization - PKG1 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1250 Place
POs for All Engineered Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1260 Place
All Purchase Orders
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1270
Complete PCS Integrated Factory Acceptance Test (IFAT)
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG1-M1-1280
Complete Spare Part Data Packages
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1040
Complete 60% Design Review (Including CAD Model)
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1050 Issue
FC Drawings for all Substations and PIBs
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1060
Complete Preliminary Design Review (PDR) for PCS
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1070 Issue
FC Drawings for U/G Piping
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1100
Complete FINAL DESIGN Review (90% Progress)
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1110
Complete E-walkthrough and Final 3D Model Review
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1120 Issue
all FC drawings and documents
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1140 Final
Mechanical Completion - PKG2 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1150
Complete As-Built Drawings
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1160
Complete Project Record Books
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1170
Project Completion and Demobilization - PKG2 - OOK
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1240 Place
POs for All Engineered Equipment
Project: CCC-Zuluf-L3-UPDT-01 Activity: OOK-PKG2-M1-1260
Complete PCS Integrated Factory Acceptance Test (IFAT)