Default Project..................................................4000078895-
2-2-3-1-E
Use scheduling options from......................................4000078895-
2-2-3-1-E
Projects:
4000078895-2-2-3-1-
E.............................................Connection of NEW 380 KV D/C OHTL for
BISHA-PV - Draft Baseline Rev0.1-12345 (Eslam)
Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................Yes
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as Total Float less than or equal to .0
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar
Advanced
--------
Calculate multiple float paths...................................No
Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................1115
# Not Started....................................................1115
# In Progress....................................................0
# Completed......................................................0
# Relationships..................................................2629
# Activities with Constraint.....................................0
Errors:
-------
Warnings:
---------
Activities without predecessors..................................1
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-MIGN-ICO1000
Contract Signature
Out-of-sequence activities.......................................0
Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................1115
Data Date........................................................02-Jan-25
Earliest Early Start Date........................................02-Jan-25
Latest Early Finish Date.........................................02-Apr-27
Exceptions:
-----------
Critical Activities..............................................128
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-00GN-PGS-1000
Project Organization Chart Submission
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-00GN-PGS-1020
Sub-Contractor Plan Submission
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-EDA1340
Approval of TRANSMISSION LINE ROUTE PLAN
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-EDA1350
Approval of PLAN AND PROFILE WITH SPOTTED STRUCTURES
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-EDS2050
Submission of TRANSMISSION LINE ROUTE PLAN
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-EDS2060
Submission of PLAN AND PROFILE WITH SPOTTED STRUCTURES
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1620
Submit & Approve FOUNDATION DESIGN Drawing & CALCULATIONS FOR TANGENT TOWER
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1630
Submit & Approve FOUNDATION DESIGN Drawing & CALCULATIONS FOR SMALL ANGLE
TOWER
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1640
Submit & Approve FOUNDATION DESIGN Drawing & CALCULATIONS FOR MEDIUM ANGLE
TOWER
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1650
Submit & Approve FOUNDATION DESIGN Drawing & CALCULATIONS FOR HEAVY ANGLE
TOWER
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1660
Submit & Approve FOUNDATION DESIGN Drawing & CALCULATIONS FOR ANCHOR TOWER
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1670
Submit & Approve FOUNDATION DESIGN Drawing & CALCULATIONS FOR DEAD END TOWER
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1680
Submit & Approve BORE HOLE LOCATIONS PLAN
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1890
Submit & Approve GEOTECHNICAL INVESTIGATION REPORT
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1900
Submit & Approve Tapographic survey
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-01EN-VDS1940
Submit & Approve FOUNDATION DESIGN Drawing & CALCULATIONS Transpostion TOWER
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3010
Auguring for Foundations (F1-F30)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3512
Foundations Ready for Tower Installation (F121-F150)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3522
Auguring for Foundations (F151-F180)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3532
Binding of Rebars (F151-F180)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3612
Auguring for Foundations (F181-F210)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3622
Binding of Rebars (F181-F210)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3702
Auguring for Foundations (F211-F240)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3712
Binding of Rebars (F211-F240)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3792
Auguring for Foundations (F241-F270)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3802
Binding of Rebars (F241-F270)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3882
Auguring for Foundations (F271-F300)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF3892
Binding of Rebars (F271-F300)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4062
Auguring for Foundations (F331-F360)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4072
Binding of Rebars (F331-F360)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4152
Auguring for Foundations (F361-F390)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4162
Binding of Rebars (F361-F390)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4242
Auguring for Foundations (F391-F420)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4252
Binding of Rebars (F391-F420)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4332
Auguring for Foundations (F301-F450)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4342
Binding of Rebars (F301-F450)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4422
Auguring for Foundations (F451-F480)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4432
Binding of Rebars (F451-F480)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4512
Auguring for Foundations (F481-F510)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4522
Binding of Rebars (F481-F510)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4602
Auguring for Foundations (F511-F540)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4612
Binding of Rebars (F511-F540)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4692
Auguring for Foundations (F541-F570)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4702
Binding of Rebars (F541-F570)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4782
Auguring for Foundations (F571-F600)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4792
Binding of Rebars (F571-F600)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4872
Auguring for Foundations (F601-F630)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4882
Binding of Rebars(F601-F630)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4962
Auguring for Foundations (F631-F660)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF4972
Binding of Rebars (F631-F660)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5052
Auguring for Foundations (F661-F690)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5062
Binding of Rebars (F661-F690)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5142
Auguring for Foundations (F691-F720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5152
Binding of Rebars (F691-F720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5182
Install Templates & Stubs Setting (F691-F720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5192
Concrete Pouring for Foundations (F691-F720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5202
Epoxy Coating / Concrete Curing (F691-F720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5212
Apply Paint to Foundations (F691-F720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5222
Foundations Ready for Tower Installation (F691-F720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5232
Auguring for Foundations (F721-F750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5242
Binding of Rebars (F721-F750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5272
Install Templates & Stubs Setting (F721-F750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5282
Concrete Pouring for Foundations (F721-F750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5292
Epoxy Coating / Concrete Curing (F721-F750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5302
Apply Paint to Foundations (F721-F750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-ETF5312
Foundations Ready for Tower Installation (F721-F750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-G3010 Survey
Works
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-G3020
GEOTECHNICAL INVESTIGATION Works
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-03CO-G3030
Construction of Access Road (T1-T150)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI4053
Temination of OHTL conductors & Communication LILO for ABHE-Bisha
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI4060
Power & Telecom Outage- Existing ABHE-KMH BSP for LILO
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI4063
Temination of OHTL conductors & Communication LILO for KMH-Bisha
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6530
Erection of Latticed-steel Towers (T691-T720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6540
Tower Ground Assembly (T691-T720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6550
Tower Bolt Tightening (T691-T720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6560
Grounding of Tower Structure (T691-T720)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6630
Erection of Latticed-steel Towers (T721-T750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6640
Tower Ground Assembly (T721-T750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6650
Tower Bolt Tightening (T721-T750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6660
Grounding of Tower Structure (T721-T750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6670
Installation of Insulator & Hardware (T721-T750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6680
Stringing of OPGW & Conductor (T721-T750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6690
Clipping , Sagging & Dead Ending (T721-T750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-04IN-ETI6700
Spacer Installation & Jumpering (T721-T750)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5000
Ground Resistance of Structure
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5009
OPGW Continuity Test
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5010
End to End Test
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5011
OTDR Test
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5040
Phasing Check
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5050
Phase Rotation Check
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5060
Continuity Test
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5070
Conductivity Test
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5080
Line to Line Mutual Inductance Measurement
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5090
Phase to Phase Susceptance Measurement
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5100
Insulation Test
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-05TS-ETT5110
Energization
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-Eng-V1000
Submittal Of Tower Stubs & Templates
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-Eng-V1010
Approval Of Tower Stubs & Templates
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-Eng-V1080
Submittal Of ACSR/AW Conductors
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-Eng-V1090
Approval Of ACSR/AW Conductors
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-MIGN-CO1060
Final Acceptance (FAC)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-MIGN-ICO1000
Contract Signature
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PLGN-LEL7030
Performance Acceptance Period (PAC)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PLGN-LEL7040
Final Acceptance Period (FAC)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PLGN-LEL7050
Technical Completion (TCC)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PPGN-GPG1000
Kick Off Meeting
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PPGN-GPG1080
Main & Alternate Supplier Submission
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PPGN-GPG1090
Main & Alternate Supplier Approval
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V1000
Purchase Order for Tower Stubs & Templates
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V1440
Purchase Order for Bare Overhead Line Conductors
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V3510
Release for Manufacturing of Tower Stubs & Templates (LOT 1)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V3520
Manufacturing of Tower Stubs & Templates (LOT 1)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V3590
Release for Manufacturing of Tower Stubs & Templates (LOT 2)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V3600
Manufacturing of Tower Stubs & Templates (LOT 2)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V3670
Release for Manufacturing of Tower Stubs & Templates (LOT 3)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V3680
Manufacturing of Tower Stubs & Templates (LOT 3)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V3750
Release for Manufacturing of Tower Stubs & Templates (LOT 4)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V3760
Manufacturing of Tower Stubs & Templates (LOT 4)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V5110
Release for Manufacturing of Tower Stubs & Templates (LOT 5)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V5120
Manufacturing of Tower Stubs & Templates (LOT 5)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V5130
Factory Acceptance Test of Tower Stubs & Templates (LOT 5)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V5140 FAT
Report Submission of Tower Stubs & Templates (LOT 5)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V5150 FAT
Report Approval of Tower Stubs & Templates (LOT 5)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V5160
Release of Shipment of Tower Stubs & Templates (LOT 5)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V5170
Delivery of Tower Stubs & Templates (LOT 5)
Project: 4000078895-2-2-3-1-E Activity: BIOHTL-PR-V5180
Request Material Inspection (RMI) of Tower Stubs & Templates (LOT 5)
Project: 4000078895-2-2-3-1-E Activity: BOHT-03CO-ECW3040
Construction of Structure Pads (T1-T150)
Project: 4000078895-2-2-3-1-E Activity: BOHT-06CL-ECO6060 NOC
Clearance from AMD & Issuing of energization permit