Qualification_Year(s) Civil Engineer. Civil, (2000-2004)
Institution National Institute of Technology (N.I.T) XXXX
Qualification_Year(s) Structural Engineer. Civil, (2004-2006)
Institution Punjab Engineering College (P.E.C) Chandigarh
Qualification_Year(s) Chartered Engineer (C.E)
Institution The Institution of Engineers (India)

EMPLOYMENT HISTORY

Position_Year(s) Senior Engineer (civil) 2012-Present


Employer Idom India Pvt. Ltd

Position_year(s) Deputy Manager (civil / structural) 2010-2012


Employer Sravanthi Infratech Pvt. Ltd

Position_Year(s) Project Manager (civil / structural) 2008-2010


Employer Tarini Infrastructure Pvt. Ltd

Position_Year(s) Engineer (civil / structural) 2007-2008


Employer Samsung Engineering India Pvt. Ltd

Position_Year(s) Engineer (civil / structural) 2006-2007


Employer Consulting Engineering Services (C.E.S) India Pvt. Ltd

MAJOR PROJECTS

Client_Year(s) SIRDARYA, FEB 2021- PRESENT


Project Engineering of CCPP in Uzbekistan
Position Project Coordinator
Duties - Detailed structural Analysis & preparation drawings of GT building, pipe racks & miscellaneous
equipment’s inside the GT building.

Client_Year(s) MATALA, SEP 2020- FEB 2021


Project Engineering of Substation in Zambia
Position Project Engineer
Duties -Detailed structural Analysis of various steel gantry towers in substation and preparation of drawings of
their structures and foundations. Analysis of transformer tower foundations.

Client_Year(s) ADAHI, MAY 2020-JULY 2020


Project Engineering of Slaughterhouse Building in Saudi Arabia
Position Project Engineer
Duties -Detailed structural Analysis of various precast slaughterhouse buildings, foundations and preparation of
drawings of their structures and foundations.

CV Yashu Handa 1/5


Client_Year(s) DUBAL CCPP, NOV 2019- MAY 2020
Project Engineering of Dubal Combined Cycle Plant in Dubai
Position Project Engineer
Duties -Detailed structural Analysis & preparation drawings of ST Transformer, GT Transformer, Main
Electrical control building, fuel gas shelter and other miscellaneous structures and foundations.

Client_Year(s) JEBEL ALI CCPP PHASE-III, SEP 2019- NOV 2019


Project Engineering of Dubal Combined Cycle Plant in Dubai
Position Project Engineer
Duties -Detailed for steel structure Connection calculations for all the buildings and shelters as per European
standards

Client_Year(s) REDES CCPP, Tunisia 2018-2019


Project Engineering of Redes Combined Cycle Plant in Tunisia
Position Project Engineer
Duties -Detailed structural Analysis, connection calculations & preparation of steel drawings for shelters includ-
ing Electrochlorination building, Sea water pumping station, service water pumping station etc.

Client_Year(s) ALBA, 2017-2018


Project Engineering of ALBA line-6 expansion Combined Cycle Plant in Bahrain
Position Project Engineer
Duties -Detailed design and calculations of pipe racks and their foundations

Client_Year(s) HUSSIEN, 2016-2017


Project Engineering of 970 MW Combined Cycle Plant in Jordan
Position Project Engineer
Duties -Detailed design and calculations of warehouse building, water pump shelter, waste water neutralization
shelter, air compressed shelter, GTG auxiliary equipment’s foundation, etc.

Client_Year(s) Al Toukhi, 2015-2016


Project Engineering of HAIL-2 Combined Cycle Plant in Saudi Arabia
Position Project Engineer
Duties - Detailed design and calculations of GT GSU transformer, oil forwarding pump shelter, acid and soda
storage tanks and pumps building, air compressed shelter, CCW pump shelter, chemical bulk storage
shelter, chemical dosing shelter, warehouse building, underground irrigation tank, pits, etc.

Client_Year(s) Duro Felguera, 2014-2015


Project Engineering of 1262.2 MW Combined Cycle Plant in Algeria
Position Project Engineer
Duties - Bolted Connection design of beam- column joints
- Detailed Design and calculation of hazardous waste building superstructure & its foundation

CV Yashu Handa 2/5


Client_Year(s) Bemco, 2012-2013
Project Engineering of 3700 MW Combined Cycle Plant in Saudi Arabia
Position Project Engineer
Duties - Detailed Design and calculation of Lab building structure & its foundation
- Detailed Design and calculation of pipe rack superstructure & its foundation

Client_Year(s) Bemco – GS Joint venture, 2012-2014


Project Engineering of 1992 MW Combined Cycle Plant in Saudi Arabia
Position Project Engineer
Duties - Detailed Design and calculation of ASL pump shelter superstructure & its foundation
- Detailed Design and calculation of Gas filtration shelter superstructure & its foundation
- Detailed Design and calculation of Liquid fuel unloading shelter superstructure & its foundation
- Detailed Design and calculation of Oily separator shed superstructure & its foundation
- Detailed Design and calculation of STP shelter superstructure & its foundation
- Detailed Design and calculation of WSDS shelter superstructure & its foundation
- Design calculation of different support structures of Gas & water lines & their foundation

Client_Year(s) Sravanthi Energy Pvt Ltd, 2010-2012


Project Engineering of Kashipur CCPP (2x225 MW) (India)
Position Deputy Manager ( civil / structural)
Duties Complete review Engineering of the 225 MW phase#1 CCPP project including
– Checking of plot plan, layout drawings, structure / fabrication drawings, foundation drawings of STG
building, ECB building, ACC, HRSG, GT Exhaust, TG deck foundation, detailed calculation reports
– Site coordination for smooth & timely execution of the project
– Design Engineering of 225 MW Kashipur Phase#2 CCPP project including
– Detailed design & calculation of HRSG, GT exhaust & ACC foundation, pipe racks structures &
foundations

Client_Year(s) KPR chemicals Ltd, 2011-2012


Project Engineering of KPR CCPP (2x225 MW) (India)
Position Deputy Manager ( civil / structural)
Duties Design Engineering of 450 MW KPR CCPP project including
– Detailed design & calculation of ACC foundations
– Detailed design & calculation of Canteen Building & foundation
– Detailed design & calculation of GTG, HRSG, GT exhaust foundation
– Review of soil investigation report

Client_Year(s) Meridian hydropower Pvt Ltd, 2011-2012


Project Preparation of DPR for Kurhed SHP, Kunkali SHP (India)
Position Deputy Manager ( civil / structural)
Duties – Preparation of Detail project report including power potential studies, costing / financial analysis
– Preparation of general layout plans, L-sections, layout drawings of different components including
trench weir, intake structures, water conductor system, Forebay structure, penstock system & power
house

CV Yashu Handa 3/5


Client_Year(s) Sravanthi Energy Pvt Ltd, 2010-2011
Project Engineering of Rugti SHP(India)
Position Deputy Manager ( civil / structural)
Duties – Detailed planning & finalization of the layout of the project
– Detailed design & calculation of trench Weir, water conductor system, desalting chambers, forebay
structure
– Detailed design & calculation for steel penstock & its supports
– Detailed design & calculation of penstock bends & their anchor blocks
– Detailed design & calculation of power house building & foundation
– Detailed design & calculation of switchyard foundations

Client_Year(s) Tarini Infrastructure Pvt. Ltd, 2008-2010


Project Engineering of Damanganga Hydroelectric projects (India)
Position Manager ( civil / structural)
– Detailed planning & finalization of the layout of the project
Duties – Detailed design & calculation for steel penstock & its supports
– Detailed design & calculation of penstock bends & their anchor blocks
– Detailed design & calculation of power house building & foundation
– Detailed design & calculation of substation control room building, switchyard equipment
CT, PT ,LA foundations.
– Preparation of schedule of work for site works in coordination with site manager

Client_Year(s) Indian Oil Ltd. 2007-2008


Project Engineering of Panipat refinery (India)
Position Engineer ( civil / structural)
– Detailed design & calculation of compressor shelter superstructure
Duties – Detailed design & calculation of pipe support structures

Client_Year(s) Electicite de france, 2006-2007


Project Engineering of Kol Dam Hydroelectric project (4x200 MW) (India)
Position Engineer ( civil / structural)
– Detailed design & calculation Powerhouse superstructure & its foundation
Duties – Detailed design & calculation of scroll case foundation
– Design review of transmission line tower foundations & other structures of switchyard

Client_Year(s) Ambuthirtha power Pvt Ltd, 2006-2007


Project Mahatma Gandhi Hydro Electric tailrace scheme project (22 MW) (India)
Position Engineer ( civil / structural)
Duties – Detailed design & calculation of tower foundations & other structures of switchyard
– Detailed design & calculation of Intake structures & foundations, water conductor system

Client_Year(s) AT hydro pvt. Ltd, 2006-2007


Project Upper taraila hydroelectric project (India)
Position Engineer ( civil / structural)
Duties – Detailed design & calculation of earth retaining structures & foundations
– Detailed design & calculation of Penstock system

CV Yashu Handa 4/5


FURTHER TRAINING: STAAD Pro training programme

LANGUAGES
Language English, Hindi, Punjabi
Level Speaking: (excellent); Writing: (excellent)

I.T SKILLS:

– WINDOWS environment (Word, Excel,...)


– AUTOCAD
– STAAD Pro. (structural Analysis)
– STAAD Foundation (Foundation Analysis)
– SAP (Structural Analysis)
– HILTI (anchor bolts Analysis)
– Power Connect (Connection design)

CV Yashu Handa 5/5