Project Name: Drain Channel - Haii Al-Bahar
Project Name: Drain Channel - Haii Al-Bahar
Project Name: Drain Channel - Haii Al-Bahar
SITE DIARY
SITE DIARY
Material Deliveries :one ton steel received and blocks of 4" Plants,Equipments and/off site :
-1320-No. Received Generator-1,Roller Compactor-1,Plate
Compactor-1,Vibrator-2,Mixer Machine-
1,Bending Machine-1, Grinder-1,Wood
Cutting Machine-1,Water Pump-2,Hilty-
1,Drill Machine-1
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
MEP Work:
Electrical GI box wall
Site Work : Block work is in progress in area A. piping and mechanical
Housekeeping is maintained. wall piping.
Inspection for Lintel Formwork & reinforcement in area A is completed.
Block work setting out in area C is started.
Concrete Work :
SITE DIARY
MEP Work:
Electrical GI box wall
Site Work : Block work is in progress in area A. piping and mechanical
Housekeeping is maintained. wall piping.
Block work setting out in area C is completed.
Concrete Work :
Concreting with 3Cu.M. of 30N-OPC for Lintel in area A is completed.
SITE DIARY
MEP Work:
Electrical GI box wall
Site Work : Block work is in progress in area A. piping and mechanical
Housekeeping is maintained. wall piping.
Concrete Work :
SITE DIARY
MEP Work:
Electrical GI box wall
Site Work : Block work is in progress in area A. piping and mechanical
Housekeeping is maintained. wall piping.
Concrete Work :
SITE DIARY
MEP Work:
Electrical GI box wall
Site Work : Block work is in progress in area A. piping and mechanical
Housekeeping is maintained. wall piping.
Concrete Work :
SITE DIARY
MEP Work:
Electrical GI box wall
Site Work : Block work completed at area A. piping and mechanical
Housekeeping is maintained. wall piping.
Concrete Work :
SITE DIARY
MEP Work:
Electrical GI box wall
Site Work : piping and mechanical
STOP WORKING DUE TO SECURITY REASON wall piping.
Concrete Work :
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and completing septic tank is in progress .
Block work in area C is in progress.
Reinforcement for 1st floor beams at area B is started .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and completing septic tank is in progress .
Block work in area C is in progress.
Reinforcement for 1st floor beams at area B is in progress .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and completing septic tank is in progress .
Block work in area C is in progress.
Reinforcement for 1st floor beams at area B is in progress .
Formwork for 1st floor beams at area A is started.
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and completing septic tank is in progress .
Block work in area C is in progress.
Reinforcement for 1st floor beams at area B is in progress .
Formwork for 1st floor beams at area A is in progress.
Concrete Work :
SITE DIARY
Site Work :
Reinforcement for 1st floor beams at area B is in progress .
Block work in area C is in progress.
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and completing septic tank is in progress .
Block work in area C is in progress.
Lintel formwork in area C is started .
Reinforcement for 1st floor beams at area B is in proress .
Formwork for 1st floor beams at area A is in progress .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and completing septic tank is in progress .
Block work in area C is in progress.
Lintel formwork in area C is in progress .
Lintel reinforcement in area C is started .
Reinforcement for 1st floor beams at area B is in progress .
Formwork for 1st floor beams at area A is in progress .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and completing septic tank is in progress .
Block work in area C is in progress.
Lintel formwork in area C is completed .
Lintel reinforcement in area C is completed .
Reinforcement for 1st floor beams at area B is completed .
Formwork for 1st floor beams at area B is in progress .
Formwork for 1st floor beams at area A is in progress .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and completing septic tank is in progress .
Block work in area C is in progress.
Formwork for 1st floor beams at area B is in progress.
Formwork for 1st floor beams at area A is in progress .
Concrete Work :
Concreting with 2Cu.M. of 30N-OPC for Lintel in area C is completed.
SITE DIARY
Site Work : Excavation by poclain around the building for pipes trenches , manholes ,
car parking shed and septic tank is in progress and for sub- station is
started.
Block work in area C is in progress.
Formwork for 1st floor beams at area B is in progress.
Formwork for 1st floor beams at area A is in progress .
Concrete Work :
Concreting with 2Cu.M. of 30N-OPC for Sil in area A&C is completed.
SITE DIARY
Site Work : Excavation by poclain around the building for pipes and manholes , car
parking shed , sub-station and completing septic tank is hold because we
couldn't make gate pass for poclain driver because it is holiday today for
gate pass office .
Block work in area C is in progress.
Formwork for 1st floor beams at area B is in progress.
Formwork for 1st floor beams at area A is hold because we couldn't make
gate pass for carpenters because it is holiday today for gate pass office .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed , sub-station and septic tank is in progress .
Block work in area C is in progress.
Formwork for 1st floor beams at area B is in progress.
Formwork for 1st floor beams at area A is in progress .
Reinforcement for 1st floor beams at area A is started .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and septic tank is in progress and sub-station is hold because of
Kahramaah Company .
Block work in area C is in progress.
Formwork for 1st floor beams at area B is completed.
Formwork for 1st floor beams at area A is in progress .
Reinforcement for 1st floor beams at area A is in progress .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and septic tank is in progress and sub-station is hold because of
Kahramaah Company .
Block work in area C is in progress.
Formwork for 1st floor beams at area A is in progress .
Reinforcement for 1st floor beams at area A is in progress .
Concrete Work :
Concreting with 57 Cu.M. of 30N-OPC for first floor beams in area B is
completed.
Arr. Dep. QECE & other visitors comments
SITE DIARY
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed and septic tank is in progress and sub-station is hold because of
Kahramaah Company .
Block work in area C is in progress.
Formwork for 1st floor beams at area A is completed .
Reinforcement for 1st floor beams at area A is completed .
Formwork deshuttering ( sides only ) for 1st floor beams at area B is
completed .
Curing for 1st floor beams at area B with water .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Excavation by poclain around the building for pipes , manholes , car parking
shed is completed and septic tank is in progress and sub-station is hold
because of Kahramaah Company .
Block work in area C is completed.
Curing for 1st floor beams at area B with water .
Concrete Work : Concreting with 29 Cu.M. of 30N-OPC for first floor beams in area A is
completed.
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for septic tank and sub-station is hold because we
couldn't make gate pass for poclain driver because it is holiday today for
gate pass office and sub-station is hold also because of Kahramaah
Company .
SITE DIARY
Site Work : Excavation by poclain for septic tank is in progress and for sub-station is
hold because of Kahramaah Company .
Formwork for 1st floor beams at area C is started .
Curing for 1st floor beams at area B & area A with water .
Material arrangement and housekeeping at site.
Concrete Work :
. Other Comments/Information :
Indirect :
Project Manager-1,Site Manager-1,
Safety Officer-1,Site Engineer-1,Elec.
Engineer-1,Mech. Engineer-1,Foreman-
1,Mech. Foreman-1,Elec. Forman-2,
Surveyor-1,Ass.Surveyor-2
Direct: Mason-2, Steel Fixer-2 , Carpenter-11,
Labour-5,Plumber-2,Electricions-3
Weather :
Normal
SITE DIARY
Site Work : Excavation by poclain for septic tank is in progress and for sub-station is
hold because of Kahramaah Company .
Formwork for 1st floor beams at area C is in progress .
Curing for 1st floor beams at area B & area A with water .
Material arrangement and housekeeping at site.
Concrete Work :
. Other Comments/Information :
Indirect :
Project Manager-1,Site Manager-1,
Safety Officer-1,Site Engineer-1,Elec.
Engineer-1,Mech. Engineer-1,Foreman-
1,Mech. Foreman-1,Elec. Forman-2,
Surveyor-1,Ass.Surveyor-2
Direct: Mason-2, Steel Fixer-2 , Carpenter-10,
Labour-5,Plumber-2,Electricions-3
Weather :
Normal
SITE DIARY
Site Work : Excavation by poclain for septic tank is in progress and for sub-station is
hold because of Kahramaah Company .
Formwork for 1st floor beams at area C is in progress .
Reinforcement for 1st floor beams at area C is started .
Curing for 1st floor beams at area B & area A with water .
Material arrangement and housekeeping at site.
Concrete Work :
. Other Comments/Information :
Indirect :
Project Manager-1,Site Manager-1,
Safety Officer-1,Site Engineer-1,Elec.
Engineer-1,Mech. Engineer-1,Foreman-
1,Mech. Foreman-1,Elec. Forman-2,
Surveyor-1,Ass.Surveyor-2
Direct: Mason-2, Steel Fixer-10 , Carpenter-10,
Labour-5,Plumber-2,Electricions-3
Weather :
Normal
SITE DIARY
Site Work : Excavation by poclain for septic tank is in progress and for sub-station is
hold because of Kahramaah Company .
Formwork for 1st floor beams at area C is in progress .
Reinforcement for 1st floor beams at area C is in progress .
Curing for 1st floor beams at area A with water .
Material arrangement and housekeeping at site.
Concrete Work :
Material Deliveries : 1 ton of 8mm and 1 ton of 12mm Plants,Equipments and/off site :
straight reinforcement steel bars . Generator-1,Roller Compactor-1,Plate
Compactor-1,Vibrator-2,Mixer Machine-
1,Bending Machine-1, Grinder-1,Wood
Cutting Machine-1,Water Pump-2,Hilty-
1,Drill Machine-1
. Other Comments/Information :
Indirect :
Project Manager-1,Site Manager-1,
Safety Officer-1,Site Engineer-1,Elec.
Engineer-1,Mech. Engineer-1,Foreman-
1,Mech. Foreman-1,Elec. Forman-2,
Surveyor-1,Ass.Surveyor-2
Direct: Mason-2, Steel Fixer-10 , Carpenter-10,
Labour-5,Plumber-2,Electricions-3
Weather :
Normal
SITE DIARY
Site Work : Excavation by poclain for septic tank is completed and for sub-station is
hold because of Kahramaah Company .
Formwork for 1st floor beams at area C is completed .
Reinforcement for 1st floor beams at area C is completed .
Leveling for foundation level and plain concrete formwork for septic tank
are completed .
Curing for 1st floor beams at area A with water .
Material arrangement and housekeeping at site.
Concrete Work : Concreting with 29 Cu.M. of 30N-OPC for first floor beams in area C is
completed.
Concreting with 4 Cu.M. of 30N-OPC for plain concrete of septic tank is
completed .
Arr. Dep. QECE & other visitors comments
. Other Comments/Information :
Indirect :
Project Manager-1,Site Manager-1,
Safety Officer-1,Site Engineer-1,Elec.
Engineer-1,Mech. Engineer-1,Foreman-
1,Mech. Foreman-1,Elec. Forman-2,
Surveyor-1,Ass.Surveyor-2
Direct: Mason-2, Steel Fixer-10 , Carpenter-10,
Labour-5,Plumber-2,Electricions-3
Weather :
Normal
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for saokways and R.G is started and for sub-station
is hold because of Kahramaah Company .
Formwork deshuttering ( bottoms and jacks ) for 1st floor beams at area B
is completed .
Formwork deshuttering ( sides only ) for 1st floor beams at area C is
completed .
Formwork for ground floor outer lintels at area B is started .
Reinforcement for ground floor outer lintels at area B is started .
Leveling for foundation level and plain concrete formwork for manholes are
started .
Curing for 1st floor beams at area C with water .
Material arrangement and housekeeping at site.
Concrete Work :
. Other Comments/Information :
Indirect :
Project Manager-1,Site Manager-1,
Safety Officer-1,Site Engineer-1,Elec.
Engineer-1,Mech. Engineer-1,Foreman-
1,Mech. Foreman-1,Elec. Forman-2,
Surveyor-1,Ass.Surveyor-2
Direct: Mason-2, Steel Fixer-2 , Carpenter-10,
Labour-5,Plumber-2,Electricions-3
Weather :
Normal
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for saokways and R.G is in proress and for sub-
station is hold because of Kahramaah Company .
Formwork for ground floor outer lintels at area B is completed .
Reinforcement for ground floor outer lintels at area B is completed .
Leveling for foundation level and plain concrete formwork for manholes are
in progress .
Curing for 1st floor beams at area C with water .
Material arrangement and housekeeping at site.
Concrete Work :
. Other Comments/Information :
Indirect :
Project Manager-1,Site Manager-1,
Safety Officer-1,Site Engineer-1,Elec.
Engineer-1,Mech. Engineer-1,Foreman-
1,Mech. Foreman-1,Elec. Forman-2,
Surveyor-1,Ass.Surveyor-2
Direct: Mason-4, Steel Fixer-2 , Carpenter-2, Labour-
5,Plumber-2,Electricions-3
Weather :
Normal
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for saokways and R.G is in proress and for sub-
station is hold because of Kahramaah Company .
Leveling for foundation level and plain concrete formwork for manholes are
completed .
Curing for 1st floor beams at area C with water .
Primer paintinig for plain concrete of septic tank is completed .
Material arrangement and housekeeping at site.
Concrete Work :
Material Deliveries : 2 tons of 12mm and 4 tons of 16mm Plants,Equipments and/off site :
straight reinforcement steel bars and wire mesh A-252 Generator-1,Roller Compactor-1,Plate
(8mm) -100 Nos . Compactor-1,Vibrator-2,Mixer Machine-
1,Bending Machine-1, Grinder-1,Wood
Cutting Machine-1,Water Pump-2,Hilty-
1,Drill Machine-1
. Other Comments/Information :
Indirect :
Project Manager-1,Site Manager-1,
Safety Officer-1,Site Engineer-1,Elec.
Engineer-1,Mech. Engineer-1,Foreman-
1,Mech. Foreman-1,Elec. Forman-2,
Surveyor-1,Ass.Surveyor-2
Direct: Mason-2, Steel Fixer-2 , Carpenter-2, Labour-
5,Plumber-2,Electricions-3
Weather :
Normal
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for saokways is completed and for R.G is in proress
and for sub-station is hold because of Kahramaah Company .
Roof columns reinforcement at area A is started ( stirrups) .
Curing for 1st floor beams at area C with water .
Material arrangement and housekeeping at site.
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for R.G is in proress and for sub-station is hold
because of Kahramaah Company .
Roof columns reinforcement at area A is completed ( stirrups) .
Curing for 1st floor beams at area C with water .
Material arrangement and housekeeping at site.
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain for R.G is in proress and for sub-station is hold because
of Kahramaah Company .
Setting out of block work for ground floor at area B is started.
Material arrangement and housekeeping at site.
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for R.G is in proress and for sub-station is hold because
of Kahramaah Company .
Block work for ground floor at area B is in progress .
Shuttering for manholes reinforced footings is completed ( to be placed in its
proper positions) .
Water proofing for septic tank plain concrete with membrane sheets is completed
.
Material arrangement and housekeeping at site.
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for R.G is completed and for sub-station is hold because
of Kahramaah Company .
Block work for ground floor at area B is in progress .
Reinforcement for septic tank footing is in progress .
Formwork for septic tank reinforced footing is started .
Material arrangement and housekeeping at site.
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
SITE DIARY
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
Material Deliveries : 1440 Nos of 8" hollow blocks are Plants,Equipments and/off site :
received . Generator-1,Roller Compactor-1,Plate
Compactor-1,Vibrator-2,Mixer Machine-
1,Bending Machine-1, Grinder-1,Wood Cutting
Machine-1,Water Pump-2,Hilty-1,Drill Machine-
1 , bobcat-1
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
Material Deliveries : 1650 Nos of 4" hollow blocks are Plants,Equipments and/off site :
received . Generator-1,Roller Compactor-1,Plate
Compactor-1,Vibrator-2,Mixer Machine-
1,Bending Machine-1, Grinder-1,Wood Cutting
Machine-1,Water Pump-2,Hilty-1,Drill Machine-
1 , bobcat-1
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
SITE DIARY
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
RFT for screed for ground floor hollow core slabs at area B is started .
Material arrangement and housekeeping at site.
# Working is stopped because of Windy sandy storm from 10:00 am to 12:00 .
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
Material Deliveries : 350 Nos of 6" hollow blocks . Plants,Equipments and/off site :
Generator-1,Roller Compactor-1,Plate
Compactor-1,Vibrator-2,Mixer Machine-
1,Bending Machine-1, Grinder-1,Wood Cutting
Machine-1,Water Pump-2,Hilty-1,Drill Machine-
1,
SITE DIARY
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
Coordinates marking for 1st floor columns at area B by surveyor is completed .
Formwork for 1st floor columns at area B is started .
Material arrangement and housekeeping at site.
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
Formwork for 1st floor columns at area B is in progress .
Erection of precast hollow core slabs at area C ( ground floor ) is completed .
Stirrups for parapet columns fixing at area C is completed .
Material arrangement and housekeeping at site.
Concrete Work :
SITE DIARY
Site Work : Excavation by poclain for sub-station is hold because of Kahramaah Company .
Formwork for 1st floor columns at area B is in progress .
Formwork for ground floor hollow core slabs ready mix concrete at area C is
started .
RFT for ground floor hollow core slabs ready mix concrete at area C is started .
Material arrangement and housekeeping at site.
# Work is stopped from 9:00am to 3:00pm because of windy sand storm .
Concrete Work :
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaa Company .
Formwork for drainage slabs at area D is completed .
RFT for drainage slabs at area D is completed .
Parapet block work at area C is in progress .
Material arrangement and housekeeping at site.
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Excavation by poclain for sub-station is hold because of Kahramaa Company .
Formwork for drainage slabs at area D is completed .
RFT for drainage slabs at area D is completed .
Parapet block work at area C is in progress .
Material arrangement and housekeeping at site.
Concrete Work : Concreting with 27 Cu.M. of 30N-SRC for septic tank walls is completed .
Concreting with 4 Cu.M. of 20N-OPC for 20 parapet columns at area A is
completed .
Concreting with 3.5 Cu.M. of 20N-OPC for A.Cs. footings at area A is completed.
Concreting
with 1.5 Cu.M. of 20N-OPC for drainage slab at area A is completed .
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
Concrete Work :
SITE DIARY
Concrete Work :
SITE DIARY
MEP Work:
Concrete Work :
SITE DIARY
MEP Work:
Concrete Work :
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
Site Work : Surface cleaning after sealer in area A and area B is started .
Housekeeping at site .
Beam work for F.F. is on hold .
Internal plaster work in area C is in progress .
Manholes walls reinforcement and shuttering are in progress .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after sealer in area A and area B is in progress .
Housekeeping at site .
Beam work for F.F. is on hold .
Internal plaster work in area C is in progress .
Manholes walls reinforcement and shuttering are in progress .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after sealer in area A and area B is in progress .
Housekeeping at site .
Beam work for F.F. is on hold .
Internal plaster work in area C is in progress .
Manholes walls reinforcement and shuttering are in progress .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after sealer in area A and area B is in progress .
Housekeeping at site .
Internal plaster work in area C is in progress .
Manholes walls reinforcement and shuttering are in progress .
Formwork for parapet columns at area C is started .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after sealer in area A and area B is in progress .
Housekeeping at site .
Internal plaster work in area C is in progress .
Manholes walls reinforcement and shuttering are completed .
Formwork for parapet columns at area C is in progress .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after sealer in area A and area B is completed .
Housekeeping at site .
Internal plaster work in area C is in progress .
Formwork for parapet columns at area C is completed .
Concrete Work : Concreting with 9 Cu.M. of 30N-SRC for manholes walls and 9 Cu.M. of 30N-OPC
for parapet columns at area C is completed .
Arr. Dep. QECE & other visitors comments
SITE DIARY
MEP Work:
Site Work : Filler 1st coat for internal painting at area A and area B is started .
Housekeeping at site .
Internal plaster work in area C is completed .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Filler 1st coat for internal painting at area A and area B is in progress .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Filler 1st coat for internal painting at area A and area B is completed .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after Filler 1st coat for internal painting at area A and area B is
started .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after Filler 1st coat for internal painting at area A and area B is in
proress .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after Filler 1st coat for internal painting at area A and area B is in
proress .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after Filler 1st coat for internal painting at area A and area B is
completed .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Filler 2nd coat for internal painting at area A and area B is started .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Filler 2nd coat for internal painting at area A and area B is in progress .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Filler 2nd coat for internal painting at area A and area B is completed .
Housekeeping at site .
Concrete Work :
SITE DIARY
MEP Work:
Site Work : Surface cleaning after Filler 2nd coat for internal painting at area A and area B is
started .
Housekeeping at site .
Sealer for internal painting at area C is completed .
Backfilling with fine sand and leveling up to sewage pipes bottom levels back side the
building is started
SITE DIARY
MEP Work:
Site Work : Surface cleaning after Filler 2nd coat for internal painting at area A and area B in
progress .
Housekeeping at site .
Surface cleaning after sealer for internal painting at area C is completed .
Filler 1st coat for internal painting at area C is started .
Backfilling with fine sand and leveling up to sewage pipes bottom levels back side the
building is completed .
SITE DIARY
MEP Work:
Site Work : Surface cleaning after Filler 2nd coat for internal painting at area A and area B is
completed .
Housekeeping at site .
Filler 1st coat for internal painting at area C is completed .
Sewage pipes installation back side the building is started .
False ceiling installation at areas A and B is in progress .
Formwork for roof beams at area D is started .
Reinforcement for roof beams at area D is started .
Internal plaster for parapet at areas A and C is completed .
Concrete Work :
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
Direct:
Carpenter-3, Labor-6
Carpenter-3, Labor-6
Royal Commission for Jubail & Yanbu
Royal Commission in Jubail
SITE DIARY
MEP Work:
Direct:
Carpenter-4, Steel fixer-1 , Mason-1, Labor-6
Carpenter-4, Steel fixer-1 , Mason-1, Labor-6
Royal Commission for Jubail & Yanbu
Royal Commission in Jubail
SITE DIARY
MEP Work:
Direct:
Carpenter-4, Steel fixer-1 , Mason-1, Labor-6
Carpenter-4, Steel fixer-1 , Mason-1, Labor-6
Royal Commission for Jubail & Yanbu
Royal Commission in Jubail
SITE DIARY
MEP Work:
Direct:
Carpenter-4, Steel fixer-1 , Mason-1, Labor-6
Carpenter-4, Steel fixer-1 , Mason-1, Labor-6
Royal Commission for Jubail & Yanbu
Royal Commission in Jubail
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
MEP Work:
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
SITE DIARY
Completed up to here
Royal Commission for Jubail & Yanbu
Royal Commission in Jubail
SITE DIARY
Site Work :
Jersey barriers surfacing for east side is in progress .
Kerbwall works are in progress .
Deck slab surface preparation prior to asphalt works is in progress .
Manpower : 9
PROJECT NAME : B14-T218
SITE DIARY
SITE DIARY
SITE DIARY
PROJECT NAME :
MEP Work:
Site Work :
Grouting Work :
SITE DIARY
MEP Work:
Site Work :
Concrete Work :
Direct:
Weather :