EP WELLS DAILY OPERATIONS REPORT Report 9 26/10/2023

Company PDO
Well Type Development
Well / Wellbore / Well ID MARMUL-1209 / Hole 01 / 27538
WBS No / API No / Hole Type C.AA.MRP.DD.01.WEL.27538 / MM-1209 / V
Event Summary
Event Type Drilling +Completion Event Start Date 18/10/2023 Days on Location 7.33
Objective Drill - New Well Original Spud Date 20/10/2023 Days Since Spud 6.92
Est. Days 6.98 Days To Release 3.00
Contractor Weatherford oil tool Middle East Ltd Next Location name MARMUL AK_F_E9SPOT_P135_P
Work Unit PDO Rig 157 Next Location Readiness 75%
Local Phone No. Satellite Phone No.
Rig Activity ID DR461 Number of Musta’ed 1
Engagement’s
Well Control Risk Category Low Risk Well

Well Status
Team Lead (TL) MU55321 - Haitham Maskari Measured Depth(m) 843.00
Sr. Well Engineer (SWE) MU55321 - Haitham Maskari TVD(m) 842.76
Ops Well Engineer (WE) MU57346 - Said Waheibi 24 Hr Progress(m)
PDO Site Supervisor MUCL925 - Qasim Alriyami Hole size(in) 8.500
Assist Site Supervisor (ADSV) MUCM732 - Ibrahim al Balushi Depth Ref/Grd Elev/Water Depth(m) DFE: 281.87 / 275.77
Rig Manager/ Tool Pusher & Night DSV Hareesh / Ibrahim Operation Geologist (PG) MU54220 - Mohamed
Harthi
Production Chemist MU53343 - Nasser Maskari Production Technologist (PT) MU60309 - Al Mutasim
Amri
Onsite Crew One / Crew Two Crew A / Crew C Petrophysicist (PP) MU63020 - Qusay Al
Sinani
THF Datum
Rig Operating Rate(hr) 0.00 Last Casing MD 9.625in@208.80m
Rig Zero Rate(hr) 0.00 Next Casing MD 7.000in@841.00m
Rig Reduced Rate(hr) 6.00 Current Fluid Density(kPa/m)
Actual cost to date/AFE 0/ LOT/FIT EMW(kPa/m)
Actual divided by AFE Lithology
Daily Cost 0 Formation
Days Ahd(-) Bhnd(+)(50/50) 4.33 Formation top MD
Cumulative NPT(hr/%) 56.75/32.24 A Annulus Pressure(kPa) 0.00
Daily NPT(hr/%) 0/0 B Annulus Pressure(kPa) 0.00
Tubing Pressure(kPa) 0.00

HSE Summary
Last Incident Date Days Last Incident Date Days KPI's

LWC OHI TRCF


RWC NII LWCF
MTC HPI Safety Cards - Safe 6
FAC GOAL ZERO DAYS 17/09/2023 39 Safety Card - Unsafe 6
SSE% 0

Wells Process Safety


Days Since Last
Equip Per T&D Bar PDO Rig 157
eWCAT Status Last BOP function test 12/10/2023 14
JSA's/Toolbox Talks Last BOP Test 12/10/2023 14
Drills Report attached N Next BOP Test 02/11/2023
BOP Test Charts attached N Last BOP Accumulator Test 12/10/2023

Check Comply Confirm Tool (eCCC)


Area Percentage Area Percentage

26/10/2023 11:11:01AM Report Version: 4.1.1210 Generated from data in EDM/OpenWells/PROFILE 1


EP WELLS DAILY OPERATIONS REPORT Report 9 26/10/2023
Well MARMUL-1209
Wellbore Hole 01

HSE Drills
Drill Type Crew Drill Date Days Drill Frequency Comments
Since Duration (days)
Last (min)
BOP Drill (Trip Drill) Crew A 22/10/2023 4 1.50 7 Good response from crew. Finding: -
Improvement in response time.
Choke Drill Crew A 04/10/2023 22 2.00 0 - Good response from crew
Confined Space Rescue Drill Crew A 04/10/2023 22 20.00 365 The response of the crew was good. Findings: -
The knowledge of the crew need improvement. -
Winch need to be greased.
Evacuation from Height Crew A 04/10/2023 22 20.00 365 - Good Response from the crew and use of
stretcher
H2S Drill Crew A 18/10/2023 8 2.00 14 - Good response from crew
Kick Drill (Pit Drill) Crew A 22/10/2023 4 3.00 7 Good response from crew. Findings: - Need to
expline more about WPS Drills
Man lost Drill Crew A 04/10/2023 22 10.00 365 Findings: - Need to improve the communcation.
Rig Fire Drill Crew A 18/10/2023 8 6.00 14 - Discuss the proper position of fire team
members. - Discuss the types of fire & the proper
type of extinguisher.
Spill Drill Crew A 04/10/2023 22 10.00 365 - Rig crew members follow up procedure.
Stretcher Drill Crew A 04/10/2023 22 3.00 120 - Good response from crew
Strip Drill Crew A 04/10/2023 22 2.00 0 - Good response from crew
Camp Fire Drill Crew A 04/10/2023 22 5.00 30 - Discuss about the different types of emergency
alarms for better understanding.
Camp Stretcher Drill Crew A 04/10/2023 22 3.00 90 - Good response from crew
BOP Drill (Trip Drill) Crew C 22/10/2023 4 2.50 7 Good response from crew.
Choke Drill Crew C 04/10/2023 22 2.00 0 - Good response from crew
Confined Space Rescue Drill Crew C 04/10/2023 22 15.00 365 The response of the crew was good. Findings: -
The knowledge of the crew need improvement. -
Winch need to be greased.
Evacuation from Height Crew C 04/10/2023 22 20.00 365 Good response from crew
H2S Drill Crew C 17/10/2023 9 3.00 14 Findings: - Secondary assembly point was not
clean & tidy after Rig move.
Kick Drill (Pit Drill) Crew C 22/10/2023 4 2.50 7 - Good response from crew
Man lost Drill Crew C 04/10/2023 22 10.00 365 Findings: - Need to improve the communcation
Rig Fire Drill Crew C 17/10/2023 9 4.00 14 - Good response from crew. - Discuss the types of
fire & the proper type of extinguisher.
Spill Drill Crew C 04/10/2023 22 7.00 365 - Improvement observed on drill response. - Rig
crew members follow up procedure.
Stretcher Drill Crew C 04/10/2023 22 4.00 120 - Good response from crew. - Good knowledge
about how to fix the scoop stretcher.
Strip Drill Crew C 04/10/2023 22 3.00 0 - Good response from crew
Camp Fire Drill Crew C 04/10/2023 22 4.00 30 - Good response from the team.
Camp Stretcher Drill Crew C 04/10/2023 22 6.00 90 Findings: - Need to improve the response time

HSE Inspections
Company Inspection 17/09/2023
Last Drop Inspection 25/10/2023

Safety Comments:
DRILL TIMING: (UWD LT requirements) - - - List of All Drill types - - - - - - - - - - - - - - - - - - - Target time (min) - - - - - - - - - - - - -Actual
last drill duration (min)
Community/Security/Logistics Issues
Permits of Interest

Operations Summary
24 Hour Summary
-
Update Since Report Time
-
24 Hour Forecast
-

26/10/2023 11:11:01AM Report Version: 4.1.1210 Generated from data in EDM/OpenWells/PROFILE 2


EP WELLS DAILY OPERATIONS REPORT Report 9 26/10/2023
Well MARMUL-1209
Wellbore Hole 01

Time Summary

Start Hours PH OPN WS Drilled NPT Rig Description


OPN Depth (m) level Rate
0:00 5.00 D09 DRT BHA 843.00 0 L Cont. POOH 8 1/2" BHA and L/D from 80m to surface.
O * 2 x 6-3/4'' + 6 1/2" JAR + 3 x 6 3/4" DC + MWD tools+ Stab+6 3/4"
Motor and Smith PDC Bit (QF9250).
* Bit dull grade: 1-2-BT-G-X-I-CT-TD.
- Fill up through annulus with 1.8 m3/min continuously.
5:00 1.00 D09 DES RUP 843.00 0 L - P/U Kelly, soft break kelly bar & R/B kelly.
- R/D 5" Handling gear.
- Fill up through annulus with 1.8 m3/min continuously.

Deepest 5 Surveys - Hole 01


MD Inc. Azi. TVD N/S E/W V.Sec DLeg Tool
(m) (°) (°) (m) (m) (m) (m) (°/30m)
691.00 1.56 51.00 690.89 3.90 -1.10 3.89 0.782 PTW MWD
710.00 2.20 33.60 709.88 4.37 -0.70 4.36 1.343 PTW MWD
739.80 2.01 36.62 739.66 5.26 -0.07 5.26 0.221 PTW MWD
785.30 2.97 54.16 785.11 6.59 1.36 6.60 0.801 PTW MWD
821.20 2.74 140.60 820.98 6.47 2.66 6.50 3.270 PTW MWD

Fluid Details
Mud type WSW/PHB Oil/Water (%) pH/Pm (cc)
MD (m) TS/HGS/LGS (%) Pf/Mf (cc)
Mud Density In (kPa/m) Sand (%) Ca+ (mg/L)
Vis (s/l) Cl- (mg/L)
PV/YP (mPa*s/Pa) MBT (kg/m³)
Gels 10 s/m (Pa) LCM (kg/m³)
API/HTHP WL (ml/30 min) ECD (kPa/m) R600/300 (°)
FC/HTHP FC (mm) H2S (%) R200/100 (°)
KCl (%) R6/3 (°)
Ditch Magnet in Last 24hrs/Cum. (gm)

Bit Details

Bit no. Size Manufacturer Model no. Class IADC Serial Size MD in MD out IADC Dull Grade
(in) code no. (32nd") (m) (m)
2 8.500 Smith bit U 2x13, 3x14 211.00 843.00 1-2-BT-G-X-I-CT-TD

Bit Operations
MD WOB Current Flow rate SPP P bit %@ HHP Hours Footage ROP Hours Footage ROP
(m) Min/Max RPM (m³/min) (kPa) (kPa) Bit (kW) (hr) (m) (m/hr) cum cum. cum.
(kdaN) (rpm) (hr) (m) (m/hr)

Drillstring Details
Date/Time in Date/Time out BHA no. BHA Length (m) Min. ID (in) Purpose
21/10/2023 7:15PM 26/10/2023 5:00AM 8-1/2'' BHA 85.940 Drill 8.5" Section

Drillstring Components
Component type # Jts Length OD Max OD ID Connection Weight Grade Serial no.
(m) (in) (in) (in) Name (kg/m)
Crossover 1 0.95 4.000 2.000
Drill Collar 2 18.10 4.750 2.000
Hydro-Mechanical Jar 1 5.99 4.750 2.000 4 1/2" IF
PXB
Drill Collar 3 26.88 4.750 2.000
MWD Tool 5 20.79 4.750 2.000
Float Sub 1 0.52 6.750 2.000
Integral Blade Stabilizer 1 1.97 8.000 2.000
Motors 1 10.50 6.750 2.000

26/10/2023 11:11:01AM Report Version: 4.1.1210 Generated from data in EDM/OpenWells/PROFILE 3


EP WELLS DAILY OPERATIONS REPORT Report 9 26/10/2023
Well MARMUL-1209
Wellbore Hole 01

Drillstring Components
Component type # Jts Length OD Max OD ID Connection Weight Grade Serial no.
(m) (in) (in) (in) Name (kg/m)
PDC (Steel) 1 0.24 8.500 8.500 2.000

Personnel
Company Service No. of people Named Staff

DAMAC Catering 11
Gulf Drilling Llc - Rig-138 Drilling 43
(4600006244)
MI Mud Services Mud Engineer & Operatores 3
WEATHERFORD Integrated Drilling DD&MWD 2
Services (4600002663)
WEATHERFORD Integrated Drilling Company Man 2
Services (4600002663)
Total 61

Time Depth Graph (MARMUL-1209)

Plan Vs. Actual Times (days)


Hole Step No Phase Description Planned Actual AFE NAFE AFE+NAF Actual Actual Act.-AFE Ahead NPT
Depth Depth E (Cum) (-)/(+)
(Cum)
Hole 01 005 RD Rig Down 0.10 0.00 0.10 0.54 0.54 +0.44 +0.44
Hole 01 005 RT Rig Move 0.30 0.00 0.40 0.05 0.59 -0.25 +0.19
Hole 01 005 RU Rig Up 0.10 0.00 0.50 0.55 1.15 +0.45 +0.65

26/10/2023 11:11:01AM Report Version: 4.1.1210 Generated from data in EDM/OpenWells/PROFILE 4


EP WELLS DAILY OPERATIONS REPORT Report 9 26/10/2023
Well MARMUL-1209
Wellbore Hole 01

Plan Vs. Actual Times (days)


Hole Step No Phase Description Planned Actual AFE NAFE AFE+NAF Actual Actual Act.-AFE Ahead NPT
Depth Depth E (Cum) (-)/(+)
(Cum)
Hole 01 010 D12 Drill 12-1/4" section 200.00 211.00 0.56 0.00 1.06 0.94 2.08 +0.38 +1.02
Hole 01 015 C12 Run & Cement 9-5/8" casing + NU WH & BOP 0.52 0.00 1.58 0.79 2.88 +0.27 +1.30 0.04
Hole 01 020 D09 Drill 8-1/2" hole section 931.87 843.00 1.42 0.00 3.00 4.46 7.33 +3.04 +4.33 2.32
Hole 01 025 C09 Run & Cement 7" casing 0.84 0.00 3.84 7.33 +4.33
Hole 01 030 D06 Drill 6 1/8" hole 931.87 0.00 0.95 0.00 4.79 7.33 +4.33
Hole 01 035 E06 Open Hole logging 0.23 0.00 5.02 7.33 +4.33
Hole 01 040 C06 RIH 4-1/2" WWS & Stimulate 1.46 0.00 6.48 7.33 +4.33
Hole 01 045 IC RIH Completion String 0.40 0.00 6.88 7.33 +4.33
Hole 01 050 IC N/D BOP & N/U X-tree, Rig release 0.10 0.00 6.98 7.33 +4.33
Total 6.98 7.33

After Action Review


Hole Step No Phase Description AFE+NAFE Actual Actual - AAR - Justification
(AFE+NAFE
)
Hole 01 005 RD Rig Down 0.10 0.54 +0.44
Hole 01 005 RT Rig Move 0.30 0.05 -0.25
Hole 01 005 RU Rig Up 0.10 0.55 +0.45
Hole 01 010 D12 Drill 12-1/4" section 0.56 0.94 +0.38
Hole 01 015 C12 Run & Cement 9-5/8" casing + NU WH & BOP 0.52 0.79 +0.27
Hole 01 020 D09 Drill 8-1/2" hole section 1.42 4.46 +3.04
Hole 01 025 C09 Run & Cement 7" casing 0.84
Hole 01 030 D06 Drill 6 1/8" hole 0.95
Hole 01 035 E06 Open Hole logging 0.23
Hole 01 040 C06 RIH 4-1/2" WWS & Stimulate 1.46
Hole 01 045 IC RIH Completion String 0.40
Hole 01 050 IC N/D BOP & N/U X-tree, Rig release 0.10

ILT
Project Name Well Type Catalog Year Activity Phase BCT (hr) Actual (hr) NPT (hr) ILT (hr)
Marmul MP9423BPAK 2022 RD 1.50 13.00 0.00 11.50
Marmul MP9423BPAK 2022 RT 0.75 1.25 0.00 0.50
Marmul MP9423BPAK 2022 RU 3.75 13.25 0.00 9.50
Marmul MP9423BPAK 2022 D12 9.50 22.50 0.00 13.00
Marmul MP9423BPAK 2022 C12 7.25 19.00 1.00 10.75
Marmul MP9423BPAK 2022 D09 25.25 107.00 55.75 26.00

26/10/2023 11:11:01AM Report Version: 4.1.1210 Generated from data in EDM/OpenWells/PROFILE 5


EP WELLS DAILY OPERATIONS REPORT Report 9 26/10/2023
Well MARMUL-1209
Wellbore Hole 01

Plan Vs. Actual Time (MARMUL-1209)

Heat Map
C12 D09 D12 RD RT RU

MARMUL-1209 0.79 4.46 0.94 0.54 0.05 0.55

NPT Summary
Start date/time End date/time Title Description Gross time Net time Vendor Service
(hr) (hr)
21/10/2023 3:30:00AM 21/10/2023 4:30:00AM Failure on Rig CSG power tong Failure on Rig CSG power tong 1.00 1.00 Weatherford Weatherford Drilling - Rig-157
(4600006548)
22/10/2023 6:15:00PM 25/10/2023 2:00:00AM Suspended operation as per PDO Suspended operation as per PDO 55.75 55.75 PDO PDO Well Engineering
instruction due to weather condition. instruction due to weather condition.
Total NPT Duration (hr) 56.75 56.75

Learning
Phase Category Category Sub Learning

Staircase Initiatives
No Initiative Initiative Description Planned Planned Phase Status Implement Actual Actual Comments
Cost Time Date Cost Time
($) (d) ($) (d)
1 113 Moving tanks in advance load 5,000 0.00 RT 0 0.00
Planned total: 5,000.00 0.00 Actual total: 0 0.00

PIM Incidents
Incident Location Department Site Responsible Incident Description Event Type Actual Incident Incident Date
ID Supervisor Severity Status Occured
Rating

26/10/2023 11:11:01AM Report Version: 4.1.1210 Generated from data in EDM/OpenWells/PROFILE 6


EP WELLS DAILY OPERATIONS REPORT Report 9 26/10/2023
Well MARMUL-1209
Wellbore Hole 01

MOC
MOC Source MOC/Deviation # MOC Title Expiry Date

MOC & EMOC


Type MOC ID MOC No MOC Validity To MOC Title

26/10/2023 11:11:01AM Report Version: 4.1.1210 Generated from data in EDM/OpenWells/PROFILE 7