Ground Floor Plan: ICAD-2 MOSG-1 Icad-1 Mosg-2

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

400kV SWITCHGEAR

CURRENT SCOPE

CURRENT SCOPE
E=249097.47
E=248874.2904 2 N=2689790.8095
1 N=2689991.1926
GATE GATE

FIRE PUMP ROOM


400kV GANTRY BY OTHERS

FUTURE

FUTURE
FIRE WATER TANK-1 FIRE WATER TANK-2

ICAD-2 ICAD-1 MOSG-2 MOSG-1 FUTURE-2 FUTURE-1


BECH-02 BECH-01

C16 C09 C14 C04

COVERED PARKING
(FOR TRANSCO)
FUTURE FUTURE

ICAD-2 ICAD-1 MOSG-2


SHUNT REACTOR SHUNT REACTOR SHUNT REACTOR SHUNT REACTOR

MOSG-1 PROPOSED ROAD


CABLE TRENCH

CABLE TRENCH

CABLE TRENCH
CO2 / IG ROOM
STAIR-3

400kV SWITCHGEAR ROOM


OFF LOADING
PLATFORM-3
CABLE TRENCH FUTURE

STAIR-4
CABLE TRENCH FUTURE
PROPOSED ROAD

STAIR-1

OFF LOADING
PLATFORM-2
OFF LOADING
PLATFORM-1
C18 C17 C16 C15 C14 C13 C12 C11 C10 C09 C08 C07 C06 C05 C04 C03 C02 C01

RELAY ROOM SCMS ROOM TELECOM ROOM


220kV FUTURE 400kV STAIR-2
RELAY ROOM 400 & 220kV

STAIR-1

STAIR-2 CABLE TRENCH

CABLE TRENCH
COORIDOR
CABLE TRENCH

OFF LOADING PLATFORM-1


TOILET

COORIDOR
DC ROOM (FUTURE)

OFF LOADING
PLATFORM-3
11kV SWITCH GEAR ROOM LVAC ROOM DC ROOM 110V/48V BATTERY ROOM BATTERY ROOM
(400kV ,11kV) (400kV ,11kV) (FUTURE 22OkV)
C02 / IG ROOM

11kV CABLE TRENCH


500MVA TRF-3 500MVA TRF-2 500MVA TRF-1
(FUTURE) (FUTURE) (FUTURE)

FUTURE ROAD
OFF LOADING PLATFORM-2
STAIR-3
SPACE FOR 500MVA TRF
(FUTURE)

DELUGE STATION
ENCLOSURE
AUX-TRF-1 AUX-TRF-2

BECH-01

CABLE TRENCH FUTURE


CABLE TRENCH

CABLE TRENCH FUTURE

CABLE TRENCH FUTURE

CABLE TRENCH FUTURE


SPACE FOR 33KV GIS
(FUTURE)

SPACE 220kV SWITCHGEAR BUILDING

FUTURE
TRF-3
FUTURE ROAD

CABLE TRENCH
BECH-02
CABLE TRENCH FUTURE

FULL BASEMENT
STEEL FIRE
WATER
TANK-2
6.97m DIA

220kV GANTRY FUTURE

(FUTURE)
FIRE PUMP ROOM

OFF LOADING
FUTURE
MV SWGR.

PLATFORM
ROOM

TRF-2
STEEL FIRE
STAIR -3
WATER
TANK-2
6.97m DIA

STATCOM POWER
TRANSFORMER

TRAFO-1
1

AUX.
2
CABLE TRENCH FUTURE

3
4

LVAC & DC CHARGER ROOM


5
6

TRAFO-2
7

AUX.
8
REACTOR ROOM

9
10
11
FOTP MDF

12
ALARM
PANEL

TELECOM
13
PSE

ROOM
OLTE/
MUX-2
OLTE/
MUX-1

CORRIDOR

CABLE TRENCH FUTURE

FUTURE
BATTERY ROOM

OFF LOADING
TRF-1

PLATFORM
CORRIDOR

VALVE ROOM

RAM SPARE STORAGE RACK


CONTROL &
RELAY ROOM

PANTRY TOILET

RACK
FACP
IP-1
CABLE TRENCH FUTURE

33 CONTROL BUILDING

KA.1-2
CABLE TRENCH FUTURE
CO2 ROOM

SOM.1
FULL BASEMENT

KB.1-2
RP3
VCU ROOM

+KC.1
PUMP ROOM

RP.2
FUTURE

RP.1
STAIR -1

BEC BIE
FMS/
PQR
STAIR CASE-2

E=248707.3045
VCU.1

HEAT EXCHANGER
COOLING SYSTEM
3 N=2689805.2095 33 SWGR
FUTURE
SPACE FOR STATCOM (FUTURE)

CABLE TRENCH FUTURE KEYPLAN 4 N=2689604.7877


E=248930.4494

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
NOTES:-

CO2 / IG ROOM
OFF LOADING
STAIR-3 PLATFORM-3 STAIR-4

400kV SWITCHGEAR ROOM

STAIR-1

LEGEND:-

OFF LOADING
PLATFORM-2
OFF LOADING
PLATFORM-1

CABLE TRENCH

A STAIR-2

CABLE TRENCH
E1
CABLE TRENCH

CABLE TRENCH

500MVA TRF-1 500MVA TRF-2 500MVA TRF-3 X X

(FUTURE) (FUTURE) (FUTURE)

FOR TENDER PURPOSE


CABLE TRENCH

CABLE TRENCH

CABLE TRENCH
B

GROUND FLOOR PLAN

LOT – 1: NEW 400KV ICAD 5 SWITCHING


STATION AND REMOTE-END MODIFICATION WORKS

400kV SWITCHGEAR BUILDING


EQUIPMENT LAYOUT PLAN
GROUND FLOOR PLAN

N19532/ LOT-1/N002/A A