Adoption of energy efficient building

services installation in Data Centre and


Introduction on Energy Efficiency
Registration Scheme for Buildings

Ir Chris LO CEng, MHKIE, MIMechE, BEAM Pro, RCx Pro


Energy Efficiency Office
Electrical and Mechanical Services Department
The Government of the HKSAR
Part 1: EMSD Pilot Project -
Server Immersion Cooling
By EMSD

2
Background
Energy Consumption in Data Centres

Others, 2% Vertical
Lighting, 2% Transport, 1%
Office
Equipment, 2%

Air
conditioning, Server Room IT
38% Equipment,
55%

Average Power Usage Effectives (PUE) ~ 1.6

Source: Global Data Center Survey 2020, Uptime Institute Source: Hong Kong Energy End-use Data 2020, EMSD

3
Global Trend in IT infrastructure

➢Low rack densities (<10kW/rack) remain most common

➢The trend is challenging traditional practices in data centre cooling

Source: Global Data Center Survey 2020, Uptime Institute

4
Cooling Technologies

Conventional air cooled system Air-cooled system equipped with Immersion cooling system
Hot/ Cold aisle containment

5
Technology Overview

Condenser

Condensation
Evaporated liquid

Top Boiling liquid level Outdoor


Condenser radiator
Servers

Condensation

Evaporated liquid

Top Boiling liquid level

Servers

6
Technology Overview

Condenser

Condensation
Evaporated liquid

Top Boiling liquid level Outdoor


radiator
Servers

Outdoor
radiator

7
Pilot Project at EMSD

8
System Configuration in Data Centre

• System Configuration in Data Centre


• Continuous Test
• From July 2020 to June 2021
• Modes of Operation
• Partial load, Full load, Extreme light mode
Extreme Light mode Partial Load Full Load
Real server 0.15 kW 0.15 kW --
Heater load -- 1 x 10.5 kW 2 x 10.5 kW
Total simulated IT load 0.15 kW 10.65 kW 21 kW

9
System Configuration in Data Centre

• Annual energy performance


Overall power inputs
PUE =
Power input for IT equipment

Cooling provided
COPsystem=
System electrical power usage

Extreme Light mode Partial Load Full Load


(0.15kW) (10.65kW) (21kW)
COP 0.5 26 25
PUE 3.5 1.037 1.039

10
Part 2: Hong Kong Energy Efficiency
Registration Scheme for Buildings
(HKEERSB 2018)

11
Striving for Carbon Neutrality before 2050

12
Policy Instruments on Energy Efficiency Development
PULL PUSH
LEAD
Mandatory Legislation &
Lead by Examples & Voluntary Economic Incentives Enforcement
Carbon Neutrality Partnership EERSB BEEO (Cap. 610)
Energy Efficiency Registration Buildings Energy
Scheme for Buildings Efficiency Ordinance
- - Tax deduction - Building Energy Code
HKEERSB
FiT - Energy Audit Code
Feed-in-Tariff. Partner with
local utility company
Energy Smart EE(LP)O (Cap. 598)
VEELs Subsidy Schools* to replace VSAC, Energy Efficiency
Voluntary Energy Efficiency LED & RTEMS. (Labelling of Products)
Labelling Scheme Solar Harvest Ordinance
Source: Subsidy Schools* and NGOs in
(1) https://re.emsd.gov.hk/english/gen/4S/4S.html
installing small scale solar energy
Remark:
* Except Government and profit-making schools generation systems
13 13
Hong Kong Energy Efficiency Registration
Scheme for Buildings (HKEERSB 2018)

>95 registrations

14
Hong Kong Energy Efficiency Registration Scheme for
Buildings (HKEERSB 2018)
➢ The HKEERSB is applicable to all types of new and existing
buildings/premises equipped with energy efficient building installations
outperformed the statutory requirements.

➢ Compliance shall be proved with attaining BEAM Plus Assessment System


(“BEAM Plus”) # or any of the internationally recognized BEAS for buildings and
interiors

➢ Enhanced tax concessions for capital expenditure incurred by enterprises in procuring


eligible energy efficient building installations and renewable energy devises by
allowing tax deduction to be claimed in 100% in one year.

IRD FAQ on Completion of Form S4 – EEBI Expenditure ------->


# Overall final assessment rating at the “Bronze” level or above or individual aspect scoring (final assessment stage)
at the “Bronze/Satisfactory” level or above
15
How to apply HKEERSB 2018

EERSB website, download brochure and fill Web-Based Registration Services with iAM
Smart select form "HKEERSB" under Online
Electronics Submission

16
Application Submissions

✓ Application Form or Web-Based Registration Services with iAM Smart

✓ Copy of Certification (BEAM Plus / other recognized BEAS)

✓ Softcopies of final assessment report / energy aspect submission

✓ Application shall be made within 24 months after the issuance of the


BEAS certificate

✓ May include the logo in their documents concerning the registered


building/premises and display the logo inside the building/premises.

17
Thank You