4000 R.O. Plant
4000 R.O. Plant
4000 R.O. Plant
M/S
KIND ATTN: Mr
Dear Sir,
We thank you very much for kind enquiry given to us for your requirement of 4000 lph
REVERSE OSMOSIS PLANT for production of purified water for your Packaged drinking water project.
Based on the information furnished by you and further to the raw water analysis provided by you, we are
pleased to submit our most competitive Quotation for 4000 LPH Reverse Osmosis Plant with pretreatment.
We design & supply you the complete systems as per the enclosed specifications, price, terms &
conditions.
We hope that it will meet all your needs. Incase you need any clarification, or more details, or discuss
in person, please let us know. We will be happy to call on you at your convenience.
Looking forward to the pleasure of receiving your valued order for which we assure you of our best
equipment, and prompt services at all times.
Yours faithfully,
for SARA WATER SOLUTIONS PVT.LTD.
T.N. RAJU
MANAGING DIRECTOR
Complete
Water
PROPOSAL FOR WATER TREATMENT PLANT Treatment
Solution
PROPOSAL SUBMITTED BY
It is a known fact that untreated drinking water carries disease causing bacteria and viruses. The intake of
such contaminated water makes you and your family a prey to dreadful water borne diseases like diarrhea,
gastro, cholera, jaundice and dysentery.
Drinking water supply to us may be contaminated in number of ways like old unmentioned water supply
pipelines, poor sanitation, unhygienic level of storage tanks and water supply tankers. Also as drinking
water and sewage pipelines run underground, it has been found that in some cases slippage from broken
or leaking sewage pipes contaminates drinking water supply. Thus to protect us from waterborne diseases
throughout the year we must treat our drinking water.
An ordinary candle filter only removes physical and suspended impurities. Boiling on the other hand, is
effective, however, one must keep the water at boiling point for a minimum of 20 minutes. This process is
time consuming and expensive. What one needs is a water purifier which is simple, easy to use by even
unskilled labor and economical, to eliminate disease causing microorganisms, thus protecting one from
waterborne diseases.
RO PROCESS DESCRIPTION
Reverse Osmosis is the reversal of the natural phenomena of Osmosis by the application of external
pressure on the solution that contains the higher concentration of dissolved ions, thus forcing waterthrough
semi-permeable membrane in the opposite direction leaving the dissolved ions and suspended solids.
In the Reverse Osmosis process, the water that passes through the membrane is commonly referred to as
PERMEATE or product water, the water that remains behind the membrane along with dissolved and
suspended solids is referred to as CONCENTRATE or REJECT water.
1. Required area of installation is very less in comparison to the conventional treatment scheme.
2. The operation cost works out lesser than the treatment cost of conventional system.
RO PROCESS DESCRIPTION
Reverse Osmosis is the reversal of the natural phenomena of Osmosis by the application of external pressure
on the solution that contains the higher concentration of dissolved ions, thus forcing water through semi-
permeable membrane in the opposite direction leaving the dissolved ions and suspended solids.
In the Reverse Osmosis process, the water that passes through the membrane is commonly referred to as
PERMEATE or product water, the water that remains behind the membrane along with dissolved and
suspended solids is referred to as CONCENTRATE or REJECT water.
2. The operation cost works out lesser than the treatment cost of
conventional system.
EQUIPMENT DESCRIPTION:
Feed will be made available to the inlet of feed on continuous basis as per suction capacity of pump. It's at
client's discretion to decide upon the storage mode of feed water.
PRE-FILTRATION SECTION:
FEED PUMP:
Feed pump is centrifugal pump having suitable discharge capacity. The feed pump is required for allowing the
water to pass through the installed pre-filtration and deliver required feed flow to the RO pump.
The raw water is filtered through a filter media of multi-grade sand & pebbles (PSF) unit in order to remove
suspended matter, turbidity, and colloidal matter present in the feed water. The PSF is made-up of MS FRP
coated. Internally, it is fitted with inlet distributor and bottom collecting system. Externally it is equipped with
extra strong rigid PVC, or MS frontal pipe work with necessary valves & fittings.
This unit is charged with different grades of filtering sand. Suspended matter gets en-trapped when raw water is
passed in downward direction through layers of different grades of sand bed. The PSF is isolated for backwash
when the pressure drop across the filtering bed is more than specified limit.
The Activated carbon filter is used to de-chlorinate the raw water that has been chlorinated and also sometimes
for removal of organic impurities depending on the suspended matter content in the water to be filtered, it is
used after a sand filter.
All the dissolved salts have particular solubility in water and if the concentration of these salts increases beyond
the saturation point then the salts tend to precipitate out. Silicates have very low solubility and they precipitate
out faster at higher recoveries. Anti-scalant increases the solubility of the salts present in the water. This, in turn
reduces the risk of scale formation.
Micron filtration system is provided for pre-filtration of the fine particles that may have escaped from the
Activated carbon filter. It is also called polishing filter, as it is the final filtration before the water enters the
membranes. This dead end filtration has cartridge housed in imported PP housing. The cartridge rating is 5
micron.
RO SKID:
One high-pressure pump is provided to meet the capacity requirement at given operating pressure. The pump
is of Multi stage centrifugal type in stainless steel construction.
This system reduces the feed TDS by around 95% thus giving superior quality water, which can be recycled
back to process. This system consists of powder coated MS skid for mounting of high pressure tubes (pressure
vessels) assembled with spiral wound membrane elements. Necessary control valves provided with required
instrumentation for safe operation.
CIP SYSTEM:
The Cleaning in Place system is used for chemical cleaning of membranes at fixed interval during normal
operation over a period of time. RO membrane elements are subject to fouling by suspended or sparingly
soluble materials that may be present in the feed water.
The nature and rapidity of fouling depends on the condition of feed water. Regular cleaning of membranes shall
be done for effective performance of membranes. Cleaning tank with pump & motor is provided in the system.
Client needs to procure intermediate storage tank of desired capacity depending upon the operating hours of
plant
TREATMENT PHILOSOPHY
PLANT CAPACITY
The RO plant is designed to produce 4000 LPH of treated permeate water. The pre-treatment plant is designed for a
flow rate of 15000LPH., which includes hypo dosing system, Pressure sand filtration and Activated carbon filtration
systems.
TREATMENT SCHEME
NOTE
The treated water quality is subject to the following conditions:
1. The raw water quality being not worse than the quality indicated in the offer.
2. The plant is being operated and maintained strictly in accordance with our operational procedures.
Note: The proposed water treatment system based on RO Technology can even work continuously .
2. MOC of the RO Membrane housing, which houses the RO Membranes inside them. The heart of the
system becomes very much critical criteria when the chemical cleaning is done
3. The proposed Water Treatment System is SEMI – AUTOMATIC system, not the conventional Manual
system, which will be operated through control panel.
Product water quality The control panel will give the continuous display of the before it enters into the RO to
Product water storage tank.
The proposed water treatment system will also trip in the eventuality if Low Suction Pressure and High
Level.
5. Multi-port valve mechanism is provide for each of the Filter system instead of conventional Six-valve
mechanism to facilitate the smooth operation and less maintenance requirement.
``
6. All inter connecting as well as frontal pipe-work for the entire system will be made of conventional of SS
piping.
7. Disciplinary Monthly back wash services and Monthly regular services of the system.
TECHNICAL SPECIFICATIONS & SCOPE
Type Centrifugal
Max.Flow 6 m3 /hr
Working pressure 2.5 Kg/cm2
M.O.C. C.I.
Power 1.5 HP
Make Kirloskar or equalant
Quantity offerd One
RO MODULE
RO CLEANING SYSTEM
U.V SYSTEM
OZONE GENERATOR
WET PANEL
DRY PANEL
Indicator 5Nos.
INSTRUMENTATION
2. Flow Indicator (Rota Each MGF inlet,RO Inlet, RO Reject, 5 Nos. Flowmax/ Eureka/IEPL
meter) RO Outlet,MB outlet
3. Ph Indicator RO outlet 1 No. Hanna/Emersone/
Digital instruments
4. Conductivity Indicator RO outlet 1 No. Hanna/Emersone/
Digital instruments
5. Pressure Switches Each HPP inlet & outlet. 2 Nos. Indfoss
Schedule of Exclusions
1. All civil works (Including Design), such as plant building, shed, foundation of equipments, pipe
supports, supporting structures, platforms and mass concreting.
2. Construction of drain sump and drain channels and any special lining.
3. Plant area, building illumination, lighting, ventilation and Earthing.
4. Earthing, Lighting arrangements, lighting fixtures, lamps, poles, cables required for lighting, ACDB,
DCDB, MLDB or any lighting distribution board.
5. Supply of water for trial runs & commissioning.
6. Laboratory testing facilities, instruments and reagents.
7. Civil units like Raw water storage tank, DM water storage tank, All pipe work beyond our
termination points/battery limits.
8. Loading, unloading of material at your site. Material to be unloaded within 20 mts of location.
9. Shifting of equipments, materials upto location from beyond 20 mts of the location is not
considered, if required shall be at extra cost.
10. Layout of the equipments, piping, cabling and erection has been considered as per our standard
layout drawing or as per the client approved drawing as freezed at the time of order. All piping,
cabling, erection etc. required extra due to client’s specific requirement subsequent to order
finalisation shall be at extra cost.
11. Design codes standards, features, specifications and Supply of all item, quantity, make etc. shall
be as per our standard indicated in the proposal OR as per the scope & specifications finalized at
the time of order. Any changes in design codes, standards, features, specifications, quantity,
makes, addition of items other than specified in the order shall be at extra cost which shall be
finalized before the same are supplied. The client shall not alter / delay the works progress and the
schedule of payments related to the original order.
12. Transit Insurance matters shall be client responsibility and any claims for loss, damage shall be
lodged by the client with the Insurance Company even when the transit Insurance has been
arranged by us on behalf of the clients for their convenience. Repairs, replacements for the
damage, loss shall be made good at extra cost and not linked to receipt of claim by client from
Insurance.
13. All equipments, work and services not specifically mentioned as forming part of our offer.
14. Foundation Bolts and Nuts
15. The backwash water generated from MGF shall be put back into the collection tank by client.
16. The chemical dosing that has been suggested is only tentative, the exact quantity of chemicals
required will be arrived based on Jar test only.
17. Commissioning Spares
COMPLETION
Erection, Commissioning and handing over of the plant shall be considered to have been completed as
described below:
ERECTION
The plant shall be considered erected once the equipments, media, interconnecting piping, instruments and
accessories essential to the plant operation are in place. Minor job completion, not affecting commissioning,
shall not be reason to consider it not completed.
The Pre-commissioned tests at site will be carried out, which could be for maximum one cycle. The plant shall
be considered as commissioned on attaining the required water output and quality for maximum 1 runs or
cycles after Pre Commissioning. May be jointly witnessed / demonstrated. Minor corrections, modifications like
leakages, component rectification, etc. not affecting commissioning shall be completed later.
TERMINATION POINTS
For SARA WATER SOLUTIONS PVT.LTD. I have accepted Terms & Conditions of the Sale
T.N. RAJU
(CHIEF EXECUTIVE)
General Terms & Conditions
These are other terms and conditions which will be applicable in the event of the same are not specified above or
agreed during final techno commercial negotiations.
1. PRICES
The Basic Price quoted are valid only for three months from the date of quotation, unless otherwise
confirmed or agreed upon. Our Net quoted prices exclude all statutory levies such as Sales Tax, General
Sales Tax, Purchase Tax, Excise, Octroi etc. at the prevailing rates. If we are called upon to pay an
increased amount due to an enhancement of such statutory levies, imposition of new / additional levies, our
prices will be suitably enhanced and shall be payable by buyer at actual.
2. SALES TAX
The Basic Prices quoted are exclusive of Sales Tax which, will be charged extra at the rate prevailing at the
time of supply. The buyer should mention in his order on us his registration numbers and dates for Central
and / or State sales tax, the concession forms he will supply for the purchase. In the absence of such
information sales tax will be charged as applicable.
3. DELIVERY
A The delivery period indicated in the quotation shall be reckoned from the date of receipt and our acceptance
of technically and commercially clear purchase order or from the date of receipt of the agreed advance
payment whichever is later. The delivery period refers to the period within which the equipment ordered will
be dispatched from our factory. We shall not be held responsible for any losses, direct or indirect caused by
delays due to circumstances beyond our control.
B We reserve the right to dispatch the materials under order in more than one lot as and when each lot gets
ready. When doing so, the approximate value of each lot will be claimed at that time.
4. TRANSPORTATION
All equipments will be dispatched by us against orders to the buyers by road on lorries, on a “freight to pay”
basis. Despatch will be made through bank approved transporters selected by us. Materials will be ordinarily
be consigned to “self” where buyers require “door delivery” will be charged extra and with the following
options.
5 WARRANTY
A Our liability in respect of any defect or failure of any equipment supplied by us or any loss, injury or damage
attributable thereof is limited to making good by way of replacement or rectification, defects which show up
under proper use therein provide the equipment is operated and maintained strictly in accordance with our
instructions and arise entirely from proven faulty design, material or work ship within a period of 12 months
which from date of commissioning of equipment or 18 months from date of last supply whichever is earlier.
At the end of the period all our liabilities will cease under this warranty.
B We shall have the right to make any replacement or repairs that is required either at site or one our factories.
In case of a replacement buyer shall return the replaced part / component to us within 7 (seven) days.
C The warranty period for the entire plant including the replaced part will be limited to the remaining unexpired
portion of the total warranty period Electrical components such as motors, contractors, PLCs, relays,
solenoid valves, pressure switches & flow meters, rubber components and instruments such as pressure
gauges, thermometers and rota meters are not covered under this warranty.
D No other party or agency may carry out replacements or repairs unless authorized by us in writing.
E If a part / component is to be replaced or repaired under this warranty, there will be no charge for the
replacement however the travel and conveyance as well as boarding & lodging expenses incurred by our
representative deputed for this work will be charged to the buyer at actuals.
F This warranty does not cover replacements / repairs required as a result of normal wear & tear, accidents of
damages / defects caused by misuse / mal operation of the equipment by the buyer.
6 GENERAL
a All data as to price, size, type and design, drawings and technical documents whether submitted with or
without cost, are on the clear understanding that the same are for the buyer’s own confidential use and are
not to be given or shown to outsiders under any circumstances.
b The buyer agrees to release / clear dispatch documents presented by Bank or our nearest office immediately
on presentation. In the event the buyer fails to do so we shall have the right to recover fro the buyer, interest
at the bank rate prevailing at that time, from the date of presentation to the date they are released by the
buyer. Any demurrage charged by the transporter on the consignment due to such delays shall be to buyer’s
account.
c As water purification, ion exchange and membrane separation processes are essentially chemical, the
proposals submitted are based on the analytical and other information made available to us and where
complete information has been lacking on the assumptions which we have had to make in formulating these
proposals we have taken great care in studying the buyer’s treatment problem and the basic data furnished
to us. It is clearly understood that the final responsibility for assessing the capability of the equipment offered
and its suitability for his use rests with the buyer.
d The quantities of reagents / chemicals required for the treatment process have been on the specific
information furnished by the buyer or the assumptions stated in our proposals. The results stated are those
that would normally be expected by the use of the correct quantities and the best quality reagents
(conforming to latest Bureau if Indian Standards specifications) and subject to the influent water to liquid /
solution proposed to be treated being of the same nature and analytical characteristics as those on which
these proposals have been based and to the plant being installed and operated strictly in accordance with
our instructions.
e Bought out component makes specified in our proposals were selected after exhaustive evaluation and use.
The delivery period and price quoted in our proposal take into account the special prices and preferential
deliveries we get for these makes. Buyers who specify alternate makes do so on the clear understanding
that both price and delivery / quoted in our proposal will have to be modified accordingly.
F SARA has carefully tested and standardized with selected world renowned products and components for its
system manufacturing. Although DOSHION provides a test certificate for complete system offered by us. In
case if any special test certificate for individual product/component is required, by the client, it will be
charged extra by us.
A The daily charges quoted / or lump sum charges quoted in this proposal for deputing our Engineer /
representative to supervise the commissioning of the plant and assume that buyer will provide labour, tools
and undertake to do the job under supervision.
B The charges apply per day of our Engineer’s / Representative’s absence from his base, including time taken
to travel from base to buyer’s site or as quoted lump sum.
C The daily charges quoted apply for a man-day of 8 hours, over times the normal charge will apply on working
days. For work done on Sunday and holidays, the charges will be twice the normal charges.
D Boarding, lodging, Local conveyance charges as well as return first class rail free between base and buyer’s
at actual over and above daily charges.
E Before the buyer asks to send our Engineer, he shall ensure that his scope of work, supply of consumables
required to start up and run the plant, supply of raw water and power are all available.
F Our responsibility for commissioning the plant supplied to buyer is subject to there having been no loss or
damage thereto since its dispatch in good condition and there having been no deterioration of material due
to bad handling, conditions of storage or prolonged storage.