Horizontal Works (Edit)
Horizontal Works (Edit)
Horizontal Works (Edit)
2079.94 / 30 = 69.33
say 70.00 gallons
or 280 liters
B. Labor
1 gang 1: 1
Productivity 5 sq.m/day
Number of Coats 3
GI Pipe 1224.9823
wag muna ito
Volume (cu.m)
2.27
2.34
2.40
2.40
2.40
2.40
2.41
2.46
2.41
2.46
2.42
2.40
2.40
2.40
2.40
2.40
2.40
2.40
2.41
2.40
2.40
2.40
2.41
2.42
2.44
2.40
2.40
2.40
2.40
2.40
2.42
2.43
2.41
2.41
2.41
2.41
2.41
2.41
2.41
2.42
2.40
2.40
2.41
2.41
2.40
2.43
2.41
2.40
2.40
2.40
2.45
2.40
2.40
2.40
2.40
2.40
2.44
2.41
2.40
2.40
2.41
2.41
2.40
2.40
2.40
2.40
2.40
161.22
311 (1) Portland Cement Concrete Pavement
Total 22.00
Volume (cu.m)
4.40
4.40
A. Materials
Portland Cement 4.40 x 9.08
say
Sand 4.40 x 0.5 x 1.1
say
Gravel 4.40 x 1 x 1.1
say
RSB 242 ÷ 6
16 mm dia. say
B. Labor
1 gang 1: 2
Productivity 4 cu.m man - day
Number of days 0.367
C. Equipment
1 Concrete Mixer (1 Bagger) 6 cu.m/day
No. of days 1
A. Materials
Portland Cement
Sand 1
Boulder
Weephole
B. Labor
1
Productivity
Number of Days:
rtland Cement 34.64 x 13.86 x 0.3 = 144.02
say 145 bags
34.64 x 0.3 x 1.1 = 11.43
say 12 cu.m
34.64 x 1 = 34.64
say 35 cu.m
34.64 x 0.10 = 3.46
say 4 pcs
gang 1 : 2
0.85 cu.m man - day
mber of Days: 14
500 (1) b RCPC 610 mm dia.
A. Materials
Number of RCPC
Station Quantity Length
0+629.44 2 1.5
0+887.67 2 1.5
1+064.27 2 1.5
1+079.03 2 1.5
1+108.64 2 1.5
1+214.72 2 1.5
Total 12 pcs 9m
Portland Cement
no. of joints 6 x 0.7 = 4.2
say 5 bags
Sand
no. of joints 6 x 0.06 x 1.1 = 0.396
say 1 cu.m
B. Labor
1 gang 1 : 2
Productivity 1.5 ln.m man - day
Number of Days: 2
103 (1) Structure Excavation
Labor
1.5 cu.m/man-day
No. of Days 44