chen2019
chen2019
chen2019
Abstract—In recent years, cable faults increases year by the power grid, resulting in huge economic losses and
year with the widespread use of power cable lines, among serious social impact [10-16].
whichˈcable joint defects become one of the most important
Many experts at home and abroad have made theoretical
factors affecting the safe and stable operation of transmission
cables. Recently, a switch protection work of the 110kV cable
analysis and experimental research on cable fault related
line 131 tripped, resulting in power cables change and its three issues. Reference [1] describes a method for characterizing
T-connection lines power failure. After the troubleshooting the the degree of insulation degradation for air gap discharge
author found that there are defects in the intermediate of No. 1 defects inside cable joints. Reference [2] analyzed a cable
connector well cable. In this paper, a detailed introduction insulation state evaluation method based on partial
about this accident of cable equipment is made and the cause is discharge study of spiked defects in prefabricated cable
analyzed in-depth. The study found that there are some joints. References [7-15] describe the fault analysis of
problems in the design and installation of the cable joint weld several 110kV cable intermediate joints, and the faults are
joint. Due to many this type of cable lines run in power grid, mostly caused by the problem of cable tip tip discharge.
and at the same time to avoid such equipment defects in new References [16-20] mainly describe cable joint failures
project, the corresponding suggestions based on the cause caused by problems such as line operation and maintenance
analysis and the accident situation was put forward, which is and equipment overhaul. These documents have few
beneficial to eliminate safety hazards in time and ensure the analysis and solutions for cable intermediate joint failures
stable operation of the cable lines. caused by design defects and installation process quality.
Keywords—Power grid; Cable fault; Joint; A design flaw This paper gives a detailed introduction to the trip
accident which is caused by the defect of the intermediate
I. INTRODUCTION joint of the 110kV cable No. 1 joint well. The paper
Due to the concentration of urban buildings and the tight analyzes the cause of the accident. The cause of the cable
resources of corridors, it is difficult to set up overhead failure may be that the cable joint is sealed with lead and the
transmission lines on a large scale. At present, high-voltage copper shell is displaced. Therefore, it is very likely that
cables are widely used in the construction and relocation there is a problem with the quality of the lead seal process
and expansion of urban power grids in China [4]. Compared of this type of joint. The urgent point is that there are still
with overhead lines, power cables have the advantages of more joints of this type in the grid cable joint well. In order
small maintenance workload, space-saving corridor to eliminate the hidden defects of cable joints in time, the
resources and little impact on the surrounding environment. article finally puts forward suggestions and solutions.
High-voltage cables are the incoming and outgoing lines of II. ACCIDENT SITUATION AND ANALYSIS
the main substations in the urban area, and are also
important power supply lines between the electricity The faulty 110kV cable line is an overhead and cable
customer and the substations [7]. The stable operation of hybrid transmission line. The total length of the line is
high-voltage cables is the safety guarantee for the grid to 12.09km, of which the overhead line is 9.7762km long and
provide reliable electricity. However, the structure of the the cable line is 2.572km long. There are 3 joint wells and 3
high-voltage cable system is complicated compared to the T-connection lines. The main wiring diagram is shown in
overhead transmission line, and the maintenance time is Figure 1 below. The red part in the figure is the position of
longer in the event of a failure. In recent years, more and the cable intermediate joint where the defect exists.
more new projects have used cables to replace overhead A. Cable Trip Accident Situation
lines in urban areas [1]. However, problems such as
over-scheduled laying of cables and improper installation of At 20:53 on November 27, 2018, a 110kV line switch
cable joints still exist. This causes cable failures to occur tripped and failed to reclose. After troubleshooting,
frequently. High-voltage cable joints have become a high maintenance personnel confirmed that the fault location is
point of failure. It Seriously affected the safe operation of the B-phase joint of the No. 1 joint well of the line. Short
Authorized licensed use limited to: UNIVERSITY OF BIRMINGHAM. Downloaded on July 25,2020 at 08:10:58 UTC from IEEE Xplore. Restrictions apply.
EI2 2019
November 8-10, 2019. Changsha, China
circuit current is 5.4kA. The remaining sections of the cable Therefore, it is judged that a current flows from the
and the T-connection line are fault free. tin-plated copper braid to the inner wall of the copper shell,
and heat is generated by long-term operation.
Fig.3. Short side of copper shell of cable connector
2343
Authorized licensed use limited to: UNIVERSITY OF BIRMINGHAM. Downloaded on July 25,2020 at 08:10:58 UTC from IEEE Xplore. Restrictions apply.
EI2 2019
November 8-10, 2019. Changsha, China
III. PROBLEMS AND SUGGESTIONS FOR ACCIDENTS And it is advised to compare the grounding current
The main cause of this cable accident discussed in this change of the sheath with the common grounding
paper is aluminum sheath seal breakage and cable insulation grid.
damage. The main problems of this cable defect are as
follows:
• Construction design is not considered to add fixing
clips at both ends of the joint. Insufficient length of
joint platform and no stress relief measures.
• No serpentine laying design for cable thermal
expansion to eliminate electrodynamic force.
• Failure to consider the joint shrinkage of the EPDM
rubber support strip after long-term operation,
resulting in poor contact between the copper mesh
and the inner wall of the copper shell. Joint design
needs to be improved.
• Wrapping a fixed copper mesh with a glass cloth Fig.5. Reinforcement of aluminum sheath connection of well no.2
fireproof tape (insulation tape) can not exclude the joint
formation of a capacitance between the copper mesh
and the inner wall of the copper shell. It is also IV. CONCLUSION
impossible to exclude the cable from bending and
forming a capacitive breakdown discharge. This paper gives a detailed introduction to the tripping
accident process and the degree of site damage of 110kV
Based on the above analysis results, the following high voltage cable. The accident cable was inspected and
measures are proposed: the cause of the failure was analyzed in depth. After the
accident cable was inspected, the cause of the failure was
• The intermediate joint of other cables which is in
analyzed in depth. We found problems with the design and
the same installation environment as the faulty cable
installation process of the cable joint well joint:
line is checked. the fire box of the intermediate
joint is removed. Infrared temperature measurement Large section cable is not laid in a serpentine laying. The
on the copper seal of the cable joint is performed. design of the aluminum sheath fracture is not perfect. The
the joint seal parts of other cables are inspected and intermediate joint long-side copper shell (large side) seal
the reinforcement of the copper mesh is carried out has a weak weld condition. There are no fixing fixtures at
both ends of the cable joint. Cable joint design does not take
• Improving the quality control of lead sealing into account the adverse effects of construction quality,
process: In the new construction phase, the cable operating environment and material aging.
attachment installation personnel must be tested for
lead sealing process. Supervisors need to take This paper proposes the following suggestions for the
photos and supervise the lead sealing process. The problems with this type of cable intermediate joint:
operating personnel need to check the seal. In the
operation phase, the cable sheath circulation • Inspection and maintenance of the same cable as the
monitoring should be done, and the change of the faulty cable joint installation environment is
lead seal can be analyzed through the change of the strengthened, and the retaining clip is reinstalled.
electric current in sheath circulation. • The quality control of lead sealing process is
• For large-section cables, it is recommended that the enhanced.
new cable project be serpentinely laid on both sides • Cable sheath circulation is detected.
of the joint to eliminate thermal expansion,
contraction stress, electric power and mechanical • For large-section cables, serpentining laying on both
force during cable operation. sides of the joint to eliminate stress.
• The cable without fixing fixture at both ends of the • Pilot application independent grid design to reduce
intermediate joint is checked and the retaining clip sheath current.
is reinstalled. If the cable dropped, the operational At present, cable joints with hidden troubles are still
risk of the cable drop on the joint need to be running in the wells of other transmission line cable joints.
identified. These cable joints are installed in the same environment as
• In view of the large current of the four-circuit the failed joints, and the same type of defects may occur.
common trench cable sheath of the accident cable This paper analyzes the causes of the accident cable joints
line, the feasibility of transforming the joint well and the corresponding targeted recommendations, which can
ground network into an independent ground net to guide the special operation or replacement of the currently
reduce the sheath current is studied. In addition, it is operating cable joints. At the same time, it is important for
recommended to use the independent grounding the relocation and renovation projects and new construction
grid design for the grounding network of the projects to prevent joint defects, which is of great
multi-circuit common trench cable cross-connect significance for the stable operation of power transmission
system in the pilot project of the relocation project. lines.
2344
Authorized licensed use limited to: UNIVERSITY OF BIRMINGHAM. Downloaded on July 25,2020 at 08:10:58 UTC from IEEE Xplore. Restrictions apply.
EI2 2019
November 8-10, 2019. Changsha, China
2345
Authorized licensed use limited to: UNIVERSITY OF BIRMINGHAM. Downloaded on July 25,2020 at 08:10:58 UTC from IEEE Xplore. Restrictions apply.