HYDER CE
HYDER CE
HYDER CE
QUALIFICATION
• QA/QC NDT Level II, ASNT Level II in VT, PT, UT, RT & MT.
• BOSEIT & H2S (OPITO approved)
▪ CAESAR ii, SP3D, AUTOCAD, SAP, PROE, PRIMAVERA P6, HAP, MICROSOFT
OFFICE, ETC.
Page 1 of 8
PLEASE REFER BELOW THE MORE DETAILS FOR PREVIOUS COMPANIES AND PROJECTS.
EXPERIENCE
Presently working as Construction Engineer At Al Ghallan Island.
Project Detail,
AL GHALLAN ARTIFICIAL ISLAND, UMM LULU COMPLEX PLATFORM, ACPT UZCC, NORTH
ISLAND PLATFORM, SOUTH ISLAND PLATFORM, ASSEFIYA ARTIFICIAL ISLAND, ETOUK
ARTIFICIAL ISLAND
• Supervised and coordinated all aspects of static and piping works, including installation,
testing, and commissioning.
• Ensured compliance with relevant codes and standards (e.g., ASME, API, AWS).
• Developed and maintained detailed project schedules and progress reports.
• Managed and motivated a team of skilled technicians and subcontractors.
• Conducted site inspections and ensured adherence to safety protocols.
• Resolved technical challenges and implemented corrective actions.
• Prepared technical documentation and reports.
• Collaborated effectively with engineers, project managers, and clients.
• Proficient in reading and interpreting P&IDs, isometrics, and other engineering drawings
• Knowledge of static equipment installation and piping fabrication techniques
• Experience with various piping materials (carbon steel, stainless steel, etc.)
• Familiarity with welding processes and procedures
• Knowledge of relevant industry codes and standards (ASME, API, AWS, etc.)
• Proficiency in using AutoCAD or other CAD software (E3D, SP3D, CAESAR II)
• Strong planning, organization, and time management skills
• Ability to manage budgets and resources effectively
• Experience with project scheduling software (e.g., Primavera P6, MS Project)
Project Detail,
Maintenance of SEA WATER lift Pump & Pipe, Fire water PIPEs, AC chiller Pipes
• Reviewing WPS provided in the site and check welding as per WPS.
• Check preheats, Inter pass temperature & PWHT by Thermometer.
• Inspect Weld based on Acceptance Criteria of special category weld –ISO 5817 Level B.
• Each visual inspection in three stages –Before welding, During welding and After welding.
Page 2 of 8
• After completion of each inspection, making proper report for inspection like Fit up report,
Weld visual inspection request (UT & MPI)
• Make sure all activity and inspection as per approved ITP provided.
• Conversant with the inspection of CS, SS piping, steel structures
• ASNT level II with hands on experience on welding inspections and knowledge in various
welding processes like SMAW, GTAW, GMAW, SAW etc.
• Witnessing and review of hydro test, NDE etc.
• Familiar with International Codes ASME II, ASME IX, AWS D1.1, DNVGL-OS-C401.
Responsibilities:
• Reviewing & inspecting non-conforming product and initiating requests for corrective and
preventive action.
• Report inspection findings to all concerned personnel and raise punch list as applicable.
• Taking stringent quality measures including preparation of necessary documents to ensure
compliance with ISO standards & customer requirements.
• Maintaining quality standards for incoming materials ensuring to quality standards, norms &
practice.
• Assisting for preparation of WPS, PQR & WQT
• Preparing material inspection report for all raw materials.
• Coordinate with third party inspectors.
• Making final inspection report for submitting to clients.
• Familiar with ASME V, ASME IX, AWS D1.1.
• Submitting construction issues to Design department for raising RFI.
• Verification of raw material Test Certificates (TC) with reference to codes and standards.
• Performing inspection during fabrication activities as planned on Inspection and Test Plans.
• Before welding process Inspection of Base metal, joint preparation, visual Inspection, bevel
Angle, Root gaps, welding consumables & Welder.
• Monitoring & Review of Preheat/post heat & PWHT of weld joints.
Page 3 of 8
Responsibilities:
6. Company : Freelance
Project : 300TN GANTRY CRANE INSTALLATION PROJECT Saudi
Arabia, TESLA INVERTOR ROOM AC INSTALLATION DUBAI
MALL, AL AHLIA HOSPITAL DUBAI AC REINSTALLATION
PROJECT ETC.
Client : Confidential
Term : July 2022 – Aug 2023
Designation : Consultant
Project Detail,
200 TN lifting capacity Gantry crane (remote Operated) Total weight of 300tn Structural Capacity
Tesla charger invertor room ventilation in Dubai Mall, Al Ahlia women and child care hospital total
air conditioning rework.
Page 4 of 8
Page 5 of 8
Page 6 of 8
Page 7 of 8
Page 8 of 8