Types of Layout
The layout of the FMS is established
by the material handling system
Five basic types of FMS layouts
In-line
Loop
Ladder
Open field
Robot-centered cell

Inline Layout

Loop Layout

One direction flow, but variations in processing


sequence possible for different part types
Secondary handling system at each
workstation

Rectangular Layout

Rectangular
layout
allows
recirculation of pallets back to the first
station
in
the
sequence
after
unloading at the final station

FMS Ladder Layout


Loop with rungs to allow greater
variation in processing sequence

FMS Open Field Layout

FMS Computer Functions


Workstation control
Individual stations require controls, usually
computerized

Distribution of control instructions to


workstations
Central intelligence required to coordinate
processing at individual stations

Production control
Product mix, machine scheduling, and other
planning functions

FMS Computer Functions


Traffic control
Management of the primary handling
system to move parts between workstations

Shuttle control
Coordination of secondary handling system
with primary handling system

Workpiece monitoring
Monitoring the status of each part in the
system

FMS Computer Functions


Tool control
Tool location
Keeping track of each tool in the system
Tool life monitoring
Monitoring usage of each cutting tool and
determining when to replace worn tools

Performance monitoring and reporting


Availability, utilization, production piece counts, etc.

Diagnostics
Diagnose malfunction causes and recommend
repairs

Duties Performed by Human


Labor
Loading and unloading parts from the
system
Changing and setting cutting tools
Maintenance and repair of equipment
NC part programming
Programming and operating the
computer system
Overall management of the system

FMS Applications
Machining most common
application of FMS technology
Assembly
Inspection
Sheet metal processing (punching,
shearing, bending, and forming)
Forging

FMS at Chance-Vought
Aircraft

FMS for Sheet Metal


Fabrication

FMS Benefits
Increased machine utilization
Reasons:

24 hour operation likely to justify investment


Automatic tool changing
Automatic pallet changing at stations
Queues of parts at stations to maximize utilization
Dynamic scheduling of production to account for
changes in demand

Fewer machines required


Reduction in factory floor space required

FMS Benefits
Greater responsiveness to change
Reduced inventory requirements
Different parts produced continuously rather
than in batches

Lower manufacturing lead times


Reduced labor requirements
Higher productivity
Opportunity for unattended production
Machines run overnight ("lights out operation")

FMS Planning and Design


Issues
Part family considerations
Defining the part family of families to be
processed
Based on part similarity
Based on product commonality

Processing requirements
Determine types of processing equipment
required

Physical characteristics of workparts


Size and weight determine size of processing
equipment and material handling equipment

FMS Planning and Design


Issues
Production volume
Annual quantities determined number of
machines required

Types of workstations
Variations in process routings
Work-in-process and storage capacity
Tooling
Pallet fixtures

FMS Operational Issues


Scheduling and dispatching
Launching parts into the system at
appropriate times

Machine loading
Deciding what operations and
associated tooling at each workstation

Part routing
Selecting routes to be followed by each
part

FMS Operational Issues


Part grouping
Which parts should be on the system at
one time

Tool management
When to change tools

Pallet and fixture allocation


Limits on fixture types may limit part
types that can be processed

FMS Reports
Availability uptime proportion of
station
Utilization utilization of station
Production daily and weekly
quantities of
different parts
produced
Tooling aspects of tools, control, life
status
Status present condition of FMS,
Trouble