• Materials
• Labor for making formwork
• Labor for erection and dismantling
• Repair of formwork
• Labor for transporting and shifting formwork
materials
• Plant and equipment used for making, erecting,
dismantling, repair, and transport
• Cleaning and storage
Materials
• Direct Materials: Timber, Steel
• Consumables: Nail, shuttering oil
• The allocation of cost of direct materials to a particular item or project
depends on the life, scrap value of the material at the end of the project
• Cost of materials per use = (cost of materials-scrap value) number of
repetitions
• Cost of materials for the item/project = (Cost of material-scrap
value)*period of use for item/project life of materials
• First equation is used for items like timber and plywood while second
one is used for items like steel, metal components, aluminum etc.
Requirement of formwork material depends on
5 --------
Footings/Raft/Pile
caps
Walls
Columns
Beams and
Slabwith floor
height up to 4.5 m
Beams and
Slabwith floor
height more than
4.5 m
Access
scaffolding
Formwork Cost Planning
Type of elements Total Area to Investm Timber Plywood Labor
area be ent in purchas purchas and
catered steel e e plant
cost per
sqm
Footings/Raft/Pile
caps
Walls
Columns
Beams and
Slabwith floor
height up to 4.5 m
Beams and
Slabwith floor
height more than
4.5 m
Access scaffolding
Formwork Planning
Slab area in plan for floor height up to 4.5 m Column Details
STD. STEEL
TIE SYSTEM WALER
H16 - BEAM
12 MM THK PLY.