Fire Fighting System Ashish
Fire Fighting System Ashish
Fire Fighting System Ashish
SOURCE: https://4.imimg.com/data4/DN/OM/ANDROID-18250253/product
500x500.jpeg
Fire Exits: ASSEMBY POINT
• A fire assembly point is a location where staff and visitors can gather in the event of a fire to
ensure everyone is in a designated safe area. Fire assembly point signs help you make sure
that people will know where to gather following an emergency evacuation.
REFUGE FLOOR
SOURCE:https://d3i71xaburhd42.cloudfront.net/5f275bef21fe7308
4d06dbc62b018340de2f51bd/3-Figure1-1.png
VEHICULAR MOVEMENT OF FIRE TENDER
12 12
• Width of the road m m
The road which joins a High rise building to be
constructed shall be more then 12 meter wide. The NOT TO
BE CONSIDER.
road should be hard surfaced to carry a minimum
weight of 18,000 Kgs, the maximum weight of a Fire
Engine. 12 12
m m
• Entrance hight And Clearance Width
Every High rise building should have at least 2 means
of access, one remote to the other, of minimum width
4.5m. with height clearance of 5m. This minimum width
is essential to facilitate free movement of fire units.
• Setback Or Open Spaces
Sufficient open space (setbacks) around residential
buildings, as indicated, is essential to facilitate free
movement and operation of Fire Service vehicles.
VEHICULAR MOVEMENT OF FIRE TENDER
Sr.No Height of Exterior open
building in spaces/setbacks to be left
Meters on all sides. Minimum in
For other Occupancies the setbacks shall have to be allowed meters
as follows: 1. Above 9.5 up to 12 4.5
• Educational buildings - Except for nursery schools, the 2. Above 12 up to 15 5.0
open space shall not be less than 6 meters. 3. Above 15 up to 18 6.0
• Institutional buildings - open space shall not be less 4. Above 18 up to 21 7.0
than 6 meters.
5. Above 21 up to 24 8.0
• Assembly building - Except in front, open space shall 6. Above 24 up to 27 9.0
not be less than 6 meter and front open space shall not be
less than 12 meters. 7. Above 27 up to 30 10.0