07/03/2021 1
Passenger trains stabled on platforms, stabling at way
side stations:
A. On arrival of train on to platform.
S.N Activity Responsibility
1 Ensure to clear the fouling mark Train crew (LP/ALP and Guard)
07/03/2021 2
S.N Activity Responsibility
Guard.
i. Hand brakes: Working condition of Hand In case hand brake is defective
brakes of either end SLRs before movement. to be attended by C&W staff
as per the advice of Guard.
Guard to lock.
ii. Guard compartment locking of Working SLR
C&W staff in case universal
3 Front/Non-working SLR to be locked with lock provision is available.
universal key or pad lock. Guard to lock in case no
provision of Universal
lock/defective universal lock .
iii. For LHB rakes availability of latches to pad C&W staff
lock the doors to be ensured.
07/03/2021 5
B. After rake is stabled at way-side station:
S.N Activity Resp..
7 After stabling the rake, the information to be given to Station Master and TI
Security control and Security Personnel if available. coaching
07/03/2021 7
C. Before dispatching from stabling point.
After attaching the loco on to formation:
S.N Activity Resp..
Releasing of hand brakes: i. Working SLR. Guard
ii. Front/non working SLR. Points Man, Guard to
(Slackness of brake blocks to the wheels in supervise & ensure.
conventional rakes and green indication of hand brake
in LHB rakes also to be ensured).
1 After releasing hand brakes of both rear and front
SLR/Power cars, the Guard shall ensure closing of
non-working guard compartment door and lock with
universal key/padlock
07/03/2021 8
S.N Activity Resp..
2 Manual Releasing brakes of formation. Train crew and pointsman
Entry in the “Stabled load Register” filling up all the relevant columns to the
2
above effect should be made.
Once the coaches/rakes are fully locked and secured, security should protect
4
the coaches/rakes till departure from the stabling point.