Final PPT NTPC Dadri by Vikas
Final PPT NTPC Dadri by Vikas
Final PPT NTPC Dadri by Vikas
ON
NTPC DADRI
5/1/2012
INDEX Introduction. Availability of Coal in India. Transportation of Coal. Analysis of Coal. General Layout of CHP. CHP Auxiliary And Equipments
INTRODUCTION
What is CHP? CHP (C- Coal, H- Handling, P- Plant) Which properly handles the coal from its receipt to transferring it to bunkers. Objective of CHP : To
supply the quanta of processed coal to bunkers of Coal mills for Boiler operation. To Stack the coal to coal yard.
Grade
C.V. ( K Cal / Kg. ) > 6200 5601-6200 4941-5600 4201-5940 3361-4200 2401-3360
% Ash + Moisture
A B C D E F
40.14 - 47.10
TRANSPORTATION OF COAL
5 ways of Transportation.
Fear of thief
waterway may not be possible till TPS and Problem of recalling arises if coal dip in water Have to build Runway near TPS which is very costly.
Daily on an average around 30,000 Tone of Coal is required for a typical 2000 MW Station. The required coal is supplied through Rail wagon. If the power station is away from coal mines then it is fed through Indian Railway system other wise for pit head station it is done through Merry Go Round railway system
A sampling unit suitable size coal is provided at the feed point of the loading silo to collect samples for quality analysis
The loading operation of the coal rake takes place while it is moving under the silo at a speed of 0.8 k.m. per hr.
Wagons are provided with bottom discharge hoppers fitted with pneumatically operated automatic door actuating mechanism. Line side equipment is installed by the track hopper for initiating the opening of doors in groups of 10-14 wagons. The unloading operation of 60 tonne per load wagon takes about 20/30 seconds.
ANALYSIS OF COAL
Chemical
Analysis of Coal:-
Sample of coal is randomly collected from each rake and detailed chemical analysis, calculation of calorific value is carried out and is confirmed whether it is as per agreement with the coal mines or not.
11
LOADING
1 May 2012
PMI Revision 00
13
COAL UN LOADING
At NTPC end, Coal is unloaded in the Track hoppers. Track Hopper, normally of 200-250m length.
After placing the wagons on the hopper, electrical pulse is given to the pneumatic device for opening the bottom doors.
Coal rushes down due to its own weight. When the track hopper is empty, it takes only 20 seconds for unloading one wagon i.e. 60 Tons.
This coal falls on a T table, over which a paddle feeder runs and pushes the coal on to a conveyor.
TRACK HOPPER
15
COAL-HANDLING SYSTEM:
Coal handling system is the arrangement for transferring of coal from coal-wagons to coal-bunker or coal stock yard. It also provide arrangement for separation of material impurities, crushing of coals, Coal sampling etc. In the coal handling system of NTPC stations, three coal paths are normally available Path A - direct conveying of coal from track hopper to boiler bunkers. Path B - from track hopper to stockyard 16 Path C - from stockyard to boiler bunkers. The storage facilities at the stockyards have been provided only for crushed coal.
17
PMI Revision 00
COAL HANDLING
The coal handling system is designed to provide 100% standby for all the equipment and conveyors. The capacity of the coal handling system for super thermal stations varies from 1200 to 2000 t/h, normally, for a stage of 1000 MW,
Crusher House
Surge Hopper
Vibrating Screens
Crushers
Tripper Trolley
Bunkers
CHP Auxiliaries
OPERATIONAL CYCLE
Bunkering Cycle
Stacking Cycle
Reclaiming Cycle
BUNKERING CYCLE
From W/T Crusher House
Surge Hopper
Vibrating Feeder
Crusher
Bunkering Belts
Bunkers
STACKING CYCLE
From W/T Crusher House
Coal Is not required if bunker is full or Due any maintenance
By-Passed Coal
Bunkering Belts
Stacking Belts
Bunkers
Crushed Yard
RECLAIMING CYCLE
From W/T
If Outer Supply of coal Is Not Present
Bunkering Belts
Bunkers
Crushed Yard
26
Stacker Reclaimer
STACKER-CUM- RECLAIMER
.
Capacity ---200T/hr
Maximum---400T/hr
Bucket wheel Boom conveyor
WAGON TIPPLER
These are used to unload the coal wagons into coal hoppers in very less time (e.g. 20 wagons/hr. or more).
Weighing of coal is carried out at wagon tippler. Normally 55-60 metric ton of coal come in each wagon.
TRIPPERS
1 May 2012
To stack material at desired bunker Provided with wheels which moves on rails parallel to conveyor.
Three types motorized tripper
31
Thruster Brake
G/B
Hopper
Vibrating Feeder
Conveyor Belt
33
To crusher House
Net
Motor
G/B
Fluid Coupling
Tail End Pulley Belt Speed oSpeed before crusher 2.4 m/sec oSpeed After Crusher 2.7 m/sec
CONVEYOR BELTS
Made of diff. Layers or piles of fabric duck with rubber protected by a rubber cover on both sides & edges. Fabric duck are designed to withstand tension created in carrying the load . Nylon rubber cover protect the fabric duck. Material =fire resistant grade. Belt Width=1600 mm. Strength= 1000/1250 kN. Belt speed=3.2-3 m/s. Belt length=20km.
38
IDLERS
Carry Side
Return Side
Self Alignment
Impact
Return Roller
35
ANGLE OF IDLERS
Angle 20
35
PROTECTION SYSTEM
Interlocking is used for safety purpose. If any belt fails all other belts stop working which are interconnected.
Magnetic Separator is used to remove metal particle from coal conveyed through conveyor belt for improving boiler efficiency.
W / T No.4
600 mm
DRCR
250 mm Stage 1
RBCR
80 mm Stage 2
Impact
Stage 3
20-25 mm
Roller
Teeth
300 mm
250 mm
Stone shell
80 mm
IMPACT CRUSHER
5/1/2012
Coal Hammer
30 mm
Rotor
46
CRUSHERS
To crush the coal from 200mmto 20mm size received from vibrating screen Crusher hammer are made of MAGNEESE STEEL . Hammer row -4(stage 1) (a)Row-1 & 2 =18 hammer each (b)Row-3&4=20 hammers each
No of hammer in each Crusherstage-1 = 76 hammers stage-2 = 92 hammers Weight of each hammer=18.5kg Crushing motor rating -740kw/3.3kv Life of hammer =4 lac MT of coal Normal capacity=600 tons/hr