Wellhead

Download as pptx, pdf, or txt
Download as pptx, pdf, or txt
You are on page 1of 49

Wellheads

Sumur Produksi
3
Surface Wellheads
9
14
18
19
20
Starter Head s u mmary

22
23
Casing Hangers

24
Casing Hangers

25
Casing Hangers

26
Casing Head Spools

27
Next Section is Installed
Casing Spool

28
Casing Head Spools -
Description
Top connection flanged (standard)
Ring groove

Side outlets
threaded or
studded /
Landing area for flanged
Casing Hanger (threaded not
common)

Bottom connection
compatible with the top
connection on the Test port
previous casing head or
spool Pack Off or Secondary
Seal. Designed to fit
around O D of current
30
casing
What Seals Pressure Between
Flanges ?
Achieved using API ring gaskets

32
What happens after installing the
Casing Spool Housing ?
– Nipple up and test BOPs
– Install wear bushing.
– The next hole section is
– drilled.
The intermediate/Production casing is run in the hole and
– is cemented.
– P/U BOPs
A rough cut is performed to allow retrieving remaining
– casing and removing BOPs.
Casing Hanger is installed

33
Casing Hangers

Landing area

Intermediate

or
Production Casing

34
Casing Pack-offs
• Fits inside the lower
flange of the
casing spool

35
Casing Pack-offs
• Fits inside the lower
flange of the
casing spool

36
Casing Pack-offs
• Fits inside the lower
flange of the
casing spool

37
Casing Spools s u mmary

38
Tubing Head Spools
Third element of the
wellhead

39
Tubing Head Spools -
Functions
• Seals off (packs off) production casing
string
• Provides support and lockdown for tubing hanger

• Provides support for the BOP Stack

40
Tubing Head Spools -
Description TUBING HA N G ER
LOCK D O W N
BOLT
TOP B O WL FOR
TUBING HA N G ER

VALVE REMOVAL
PLUG T H R E A D S

TEST PORT

Pack off designed to fit around


O D of production casing
41
Tubing Hangers
Tubing Hanger

Tubing Bonnet
Tubing Head
Spool

Tubing Hanger

Production
casing
Tubing Head
Tubin g Spool

42
Tubing Hangers

Functions
• Suspends the tubing
• Seals off the annulus
• Provides a seat for a back pressure
valve (BPV) that can be temporally
installed allowing the BOP stack or X-
m a s tree to be removed

43
Dual Tubing Head
• Locator pins to orient
the dual hanger

46
Tubing Hanger

47
Tubing Heads s u mmary

48
Tubing Bonnet
• Seats over the tubing
hanger neck
• X m a s tree on top of
this

49
Tubing Bonnet

50
Tubing Bonnet

51
Dual Tubing Bonnet
• Dual completion
• Two tubing strings
– Long string
– Short string
• Spreader

52
Tubing Bonnet s u mmary

53