Design of The Sewage Treatment Plant, Shimoga: Internship Presentation On
Design of The Sewage Treatment Plant, Shimoga: Internship Presentation On
Design of The Sewage Treatment Plant, Shimoga: Internship Presentation On
CIVIL ENGINEERING
PROF. MADHUKARAN
ASSISTANT PROFESSOR
CIVIL ENGINEERING DEPARTMENT
OUTLINE:
Introduction
5
TREATMENT PROCESS :
Description of Process
The wastewater treatment is a process which includes receiving of sewage, removal of
inorganic floating material and segregation of waste, biological treatment, disinfection
and then its final disposal. Below outlined steps are carried out during treatment process.
A) Raw Sewage
B) Inlet chamber
C) Screen unit
D) Grit chamber
E) Parshall flume
F) Sedimentation tank
G)Aerated lagoon
6
H)Polishing pond
Process Diagram :
Raw Sewage
Screens
Girt Chamber
Parshall Flume
PST
Aerated Lagoon
Polishing Pond
Final Disposal
1971 102079
Total 220571
55142
8
CALCULATION OF DESIGN POPULATION
The expected population at the end of year 2019
Pn = P 0 +
Pn = 2019
P0 = 322650
55142
P2019 = 322650 +0.8(55142) .
= 366764
Therefore the population at the end of 2019 = 366764.
The expected population at the end of year 2049
Pn = P 0 +
Pn = 2049 P0 = 366764
55142
P2049 = 322650 +3(55142) .
= 532192 9
Therefore the population at the end of 2019 = 532192.
CALCULATION OF SEWAGE GENERATION
Ultimate design period = 30 years
Forecast population = 532192
Per capita water supply =135 LPCD
B= 7.4m
Hence provide breadth of inlet chamber
B=7.4m
Now, length L = 2 × B
L = 2 × 7.4 = 14.8m
Therefore provide length of chamber L =
14.8 m.
Provide 0.5m free board and 0.5 m provision
m3/sec.
Velocity through the bar screen (V) = 0.8 m/s.
The net area for screen opening required will be,
A = Q/V
net
A
net =
A
net = 0.92 m
2
14
Using rectangular bars in the screen having 2cm
1.48 m3/sec
No. of chambers = 2
Maximum daily flow of sewage of each chamber
=1.48/2
= 0.74
Cross sectional area of the tank
=27.69 m
Provide breadth B = 28m
Depth of the tank required
Depth
= 3.29 m
Provide depth d = 3.3 m.
23
DESIGN OF SEDIMENTATION TANK
Assuming free board of 0.5m and since the
tank is mechanically cleaning no extra
bottom space is required for sludge
accumulation, however provide 0.2m for
sludge zone.
25
Fig 3.5: Diagrammatic Representation of Primary Sedimentation tank
DESIGN OF AERATED LAGOON
Assumption:- 1. Detention period =5 day
28
DESIGN OF AERATED LAGOON
32