Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

06 Control and System-Compressor System

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 19

Atlas Copco Drilling Solutions

CDM30 Drill Operator Training


Topic 5 Drill operations
Air system

LP HP
Receiver tank
Minimum pressure valve

Minimum
Pressure Valve

Oil Separator Tank

C
B
A

Lube Pump
Thermostatic valve

Cold oil
Minimum
Pressure Valve

C
B Thermostatic
Valve
A
Hot oil
Hot Oil
Temperature
160º F (71º C)
Minimum
Pressure Valve

C
B
AThermostatic
Valve
Hot oil and cooler clogged

Minumum
Pressure Valve

Safety Valve 50 PSI

C
B Thermostatic
Valve
A
Thermostatic Valve

PORT C
PORT B

Oil from 145°F (63°C)


Oil below 145° F From 160°F (71°C)
to 159°F (70.5°C)
(63°C) and above

Ports:
A – To Compressor
B – From Oil Pump
C – From Oil Cooler
Lube oil system
Lube oil system

0
CDM30 compressor principle

1
CDM30 compressor principle

2
Tank

oil return tube

1/4’’~ 1/8’’ ≈3.25~6mm

3
Control valve

4
CDM30LP compressor no-load status

5
Loading

6
Stuck bit condition

7
Questions??

8
Committed to
sustainable productivity.

You might also like