3 ALNG Marine Operation
3 ALNG Marine Operation
3 ALNG Marine Operation
2
ALNG PILOTS
Highly experienced expatriate team consisting of 8 pilots working on a B2B system ensuring 4
pilots are in Soyo at any given time.
All are Master Mariners with oil and gas experience and endorsements.
Conducted the simulator studies and developed the ‘Standard Operating Procedures’ for the
arrival, loading and departure of vessels from the Angola LNG terminal.
3
SVITZER
Contracted to provide dedicated towage and line handling service to Angola LNG
4
TOWAGE
5
PATROL and PILOT BOAT
6
Svitzer Conda approaching LNGc
Soyo
7
Svitzer Conda departing LNGc Soyo
8
Anti Pollution Vessel
9
Questions
Any Questions ?
10