Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content
Hadi Ghodrat

    Hadi Ghodrat

    In clayey lands, swelling problem causes vertical displacements on road subbase, and finally, failure in pavement occurs due to lack of appropriate drainage systems. One popular and inexpensive method of soil stabilization is using lime.... more
    In clayey lands, swelling problem causes vertical displacements on road subbase, and finally, failure in pavement occurs due to lack of appropriate drainage systems. One popular and inexpensive method of soil stabilization is using lime. Investigations indicate that based on environmental and atmospheric conditions, the chemical reaction of lime and clayey soil is not accomplished well, owning to low temperature
    It is clear that geotechnical data gathering is one of the basic and important issues of subway tunnels and stations design. Proper and sufficient data collection from underground circumstance makes the designers stronger in order that... more
    It is clear that geotechnical data gathering is one of the basic and important issues of subway tunnels and stations design. Proper and sufficient data collection from underground circumstance makes the designers stronger in order that they can decrease the design and construction risks. As there are several constraints in geotechnical investigations in urban areas especially for drilling and sampling or in-situ tests, organizing a geotechnical investigation plan will play an important role. Also, economical limitations of the projects should be considered in the mentioned planning but with no defects in technical issues. On the other hand, proper definition of investigation stages will influence the quality of the investigation and results accuracy. Since, subway projects are the combination of linear and concentrated projects from geotechnical studies point of view, therefore, an optimal planning is required to prevent extra costs. Geotechnical investigation planning, especially f...
    Research Interests:
    Research Interests:
    The world of underground engineering and construction has acquired a wide‐ranging and high‐level experience on tunnel construction with Tunnel Boring Machines (TBM) and nowadays remarkable progresses are traceable in the number of tunnels... more
    The world of underground engineering and construction has acquired a wide‐ranging and high‐level experience on tunnel construction with Tunnel Boring Machines (TBM) and nowadays remarkable progresses are traceable in the number of tunnels that are becoming longer, going deeper, and growing larger in diameter and in other words becoming more difficult to realize. Tabriz‐one of the big cities in northern west of Iran has four subway lines which are under construction or investigation. The phase1 design of Tabriz urban railway line 2 (TURL2) has completely been done. Method statement of this line in the length of about 20 km and much interference due to tunneling in urban area dictates the application of TBM. Two kinds of TBM such as EPB (earth pressure balance) and SS (slurry shield) are usually used for urban areas. In this paper, the process of choosing TBM for TURL2 using MCA method (Multi Criteria Analysis) is expressed. Generally in this method some technical, economical and environmental parameters affected the TBM type are identified and taken into account by assigned weights related to the case study. Finally the results show that EPB‐TBM will be more appropriate choice for TURL2 excavation.Potemine intinerija ir statyba labai išplito bei igijo aukšto lygmens patirti tuneliu statyboje emus naudoti tuneliu gretimo mašinas (TGM). Šis statybos būdas taikytas statant daug tuneliu, kurie vis ilgeja, gileja ir plateja pagal skersmeni, t. y. statyba realizuojama sunkiau. Tabrize – viename iš didtiausiu šiaures vakaru Irano miestu – yra keturios statomos arba planuojamos statyti metro linijos. Tabrizo miesto geletinkelio 2‐os linijos (TMG2L) pirmoji projektavimo faze yra baigta. Jos ilgis – 20 km, daug jos atkarpu eina po teme. Poteminems atkarpoms pastatyti gali būti naudojamos dvieju tipu TGM. Tai temes slegines pusiausvyros mašina (TSPM) arba suspensijos skydo mašinos (SSM). Šiame straipsnyje nagrinejamas TGM pasirinkimas tarp TSPM ir SSM taikant daugiatiksli sprendimu priemimo metoda (DSPM). Šiam metodui pritaikyti apibretiami tam tikri techniniai, ekonominiai ir aplinkos rodikliai, darantys itaka TGM tipui. Rodikliams priskiriami svoriai. DSPM taikymo rezultatai parode, kad TSPM yra tinkamesne TMG2L kasti.
    Research Interests: