Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Skip to main content

Showing 1–3 of 3 results for author: Ieiri, T

.
  1. arXiv:1001.1194  [pdf, ps, other

    physics.ins-det hep-ex

    KEKB Beam Collision Stability at the Picosecond Timing and Micron Position Resolution as observed with the Belle Detector

    Authors: H. Kichimi, K. Trabelsi, S. Uehara, M. Nakao, K. Akai, T. Ieiri, M. Tobiyama, M. D. Jones, M. W. Peters, G. S. Varner, T. E. Browder

    Abstract: Using the Belle detector we study the characteristics of beam collisions at the KEKB 3.5 GeV $e^+$ on 8 GeV $e^-$ asymmetric energy collider. We investigate the collision timing {\tip} and its $z$-coordinate along the beam axis {\zip} as a function of the position of the colliding bunch in a beam train. The various {\tip} and {\zip} behaviors observed by Belle are attributed to beam loading effe… ▽ More

    Submitted 20 March, 2010; v1 submitted 7 January, 2010; originally announced January 2010.

    Comments: 18pages,12figures

    Report number: Belle Preprint 2009-1, KEK Preprint 2008-47

    Journal ref: JINST 5:P03011,2010

  2. arXiv:0706.3248  [pdf, other

    physics.ins-det

    Compensation of the Crossing Angle with Crab Cavities at KEKB

    Authors: T. Abe, K. Akai, M. Akemoto, A. Akiyama, M. Arinaga, K. Ebihara, K. Egawa, A. Enomoto, J. Flanagan, S. Fukuda, H. Fukuma, Y. Funakoshi, K. Furukawa, T. Furuya, K. Hara, T. Higo, S. Hiramatsu, H. Hisamatsu, H. Honma, T. Honma, K. Hosoyama, T. Ieiri, N. Iida, H. Ikeda, M. Ikeda , et al. (90 additional authors not shown)

    Abstract: Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than… ▽ More

    Submitted 21 June, 2007; originally announced June 2007.

    Comments: Submitted to Particle Accelerator Conference 2007, MOZAKI01, Albuquerque

    Journal ref: Conf.Proc.C070625:27,2007

  3. arXiv:physics/0401155  [pdf

    physics.acc-ph

    Negative Momentum Compaction at KEKB

    Authors: H. Ikeda, J. W. Flanagan, H. Fukuma, S. Hiramatsu, T. Ieiri, H. Koiso, T. Mimashi, T. Mitsuhashi

    Abstract: KEKB is a high luminosity e+e- collider for studying B mesons and has achieved the design luminosity of 1034cm-2s-1 in 2003. In order to get higher luminosity, we tested negative momentum compaction optics in the summer of 2003. We measured the bunch length using three methods at 0.7mA to 1.17mA bunch current and confirmed the length was shortened with the negative momentum compaction optics.

    Submitted 28 January, 2004; originally announced January 2004.

    Comments: Invited talk at the Workshop on e+e- in the 1-2 GeV range, Alghero, Italy, September 2003 (eConf C0309101)