-
Development of a fast plastic scintillation detector with time resolution of less than 10 ps
Authors:
J. W. Zhao,
B. H. Sun,
I. Tanihata,
S. Terashima,
L. H. Zhu,
A. Enomoto,
D. Nagae,
T. Nishimura,
S. Omika,
A. Ozawa,
Y. Takeuchi,
T. Yamaguchi
Abstract:
Timing-pick up detectors with excellent timing resolutions are essential in many modern nuclear physics experiments. Aiming to develop a Time-Of-Flight system with precision down to about 10 ps, we have made a systematic study of the timing characteristic of TOF detectors, which consist of several combinations of plastic scintillators and photomultiplier tubes. With the conventional electronics, t…
▽ More
Timing-pick up detectors with excellent timing resolutions are essential in many modern nuclear physics experiments. Aiming to develop a Time-Of-Flight system with precision down to about 10 ps, we have made a systematic study of the timing characteristic of TOF detectors, which consist of several combinations of plastic scintillators and photomultiplier tubes. With the conventional electronics, the best timing resolution of about 5.1 ps (σ) has been achieved for detectors with an area size of 3x1 cm2. It is found that for data digitalization a combination of TAC and ADC can achieve a better time resolution than currently available TDC. Simultaneously measurements of both time and pulse height are very valuable for correction of time-walk effect.
△ Less
Submitted 30 January, 2016;
originally announced February 2016.
-
The International Linear Collider Technical Design Report - Volume 3.I: Accelerator R&D in the Technical Design Phase
Authors:
Chris Adolphsen,
Maura Barone,
Barry Barish,
Karsten Buesser,
Philip Burrows,
John Carwardine,
Jeffrey Clark,
Hélène Mainaud Durand,
Gerry Dugan,
Eckhard Elsen,
Atsushi Enomoto,
Brian Foster,
Shigeki Fukuda,
Wei Gai,
Martin Gastal,
Rongli Geng,
Camille Ginsburg,
Susanna Guiducci,
Mike Harrison,
Hitoshi Hayano,
Keith Kershaw,
Kiyoshi Kubo,
Victor Kuchler,
Benno List,
Wanming Liu
, et al. (19 additional authors not shown)
Abstract:
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the…
▽ More
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carried out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.
△ Less
Submitted 26 June, 2013;
originally announced June 2013.
-
The International Linear Collider Technical Design Report - Volume 3.II: Accelerator Baseline Design
Authors:
Chris Adolphsen,
Maura Barone,
Barry Barish,
Karsten Buesser,
Philip Burrows,
John Carwardine,
Jeffrey Clark,
Hélène Mainaud Durand,
Gerry Dugan,
Eckhard Elsen,
Atsushi Enomoto,
Brian Foster,
Shigeki Fukuda,
Wei Gai,
Martin Gastal,
Rongli Geng,
Camille Ginsburg,
Susanna Guiducci,
Mike Harrison,
Hitoshi Hayano,
Keith Kershaw,
Kiyoshi Kubo,
Victor Kuchler,
Benno List,
Wanming Liu
, et al. (19 additional authors not shown)
Abstract:
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the…
▽ More
The International Linear Collider Technical Design Report (TDR) describes in four volumes the physics case and the design of a 500 GeV centre-of-mass energy linear electron-positron collider based on superconducting radio-frequency technology using Niobium cavities as the accelerating structures. The accelerator can be extended to 1 TeV and also run as a Higgs factory at around 250 GeV and on the Z0 pole. A comprehensive value estimate of the accelerator is give, together with associated uncertainties. It is shown that no significant technical issues remain to be solved. Once a site is selected and the necessary site-dependent engineering is carried out, construction can begin immediately. The TDR also gives baseline documentation for two high-performance detectors that can share the ILC luminosity by being moved into and out of the beam line in a "push-pull" configuration. These detectors, ILD and SiD, are described in detail. They form the basis for a world-class experimental programme that promises to increase significantly our understanding of the fundamental processes that govern the evolution of the Universe.
△ Less
Submitted 26 June, 2013;
originally announced June 2013.
-
Belle II Technical Design Report
Authors:
T. Abe,
I. Adachi,
K. Adamczyk,
S. Ahn,
H. Aihara,
K. Akai,
M. Aloi,
L. Andricek,
K. Aoki,
Y. Arai,
A. Arefiev,
K. Arinstein,
Y. Arita,
D. M. Asner,
V. Aulchenko,
T. Aushev,
T. Aziz,
A. M. Bakich,
V. Balagura,
Y. Ban,
E. Barberio,
T. Barvich,
K. Belous,
T. Bergauer,
V. Bhardwaj
, et al. (387 additional authors not shown)
Abstract:
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been pr…
▽ More
The Belle detector at the KEKB electron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-KEKB, an upgrade of KEKB is under construction, to increase the luminosity by two orders of magnitude during a three-year shutdown, with an ultimate goal of 8E35 /cm^2 /s luminosity. To exploit the increased luminosity, an upgrade of the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator upgrade, as well as key improvements of the detector.
△ Less
Submitted 1 November, 2010;
originally announced November 2010.
-
Compensation of the Crossing Angle with Crab Cavities at KEKB
Authors:
T. Abe,
K. Akai,
M. Akemoto,
A. Akiyama,
M. Arinaga,
K. Ebihara,
K. Egawa,
A. Enomoto,
J. Flanagan,
S. Fukuda,
H. Fukuma,
Y. Funakoshi,
K. Furukawa,
T. Furuya,
K. Hara,
T. Higo,
S. Hiramatsu,
H. Hisamatsu,
H. Honma,
T. Honma,
K. Hosoyama,
T. Ieiri,
N. Iida,
H. Ikeda,
M. Ikeda
, et al. (90 additional authors not shown)
Abstract:
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than…
▽ More
Crab cavities have been installed in the KEKB B--Factory rings to compensate the crossing angle at the collision point and thus increase luminosity. The beam operation with crab crossing has been done since February 2007. This is the first experience with such cavities in colliders or storage rings. The crab cavities have been working without serious issues. While higher specific luminosity than the geometrical gain has been achieved, further study is necessary and under way to reach the prediction of simulation.
△ Less
Submitted 21 June, 2007;
originally announced June 2007.
-
Beam Switching and Beam Feedback Systems at KEKB Linac
Authors:
K. Furukawa,
A. Enomoto,
N. Kamikubota,
T. Kamitani,
T. Matsumoto,
Y. Ogawa,
S. Ohsawa,
K. Oide,
T. Suwada
Abstract:
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam feedback systems have been developed and used since its commissioning.
A software panel is used to choose one of four beam modes and a switching sequence is execut…
▽ More
The KEK 8-GeV electron / 3.5-GeV positron linac has been operated with very different beam specifications for downstream rings, KEKB, PF and PF-AR. For the reliable operation among these beam modes intelligent beam switching and beam feedback systems have been developed and used since its commissioning.
A software panel is used to choose one of four beam modes and a switching sequence is executed in about two minutes. Most items in a sequence are simple operations followed by failure recoveries. The magnet standardization part consumes most of the time. The sequence can be re-arranged easily by accelerator operators. Linac beam modes are switched about fifty times a day using this software.
In order to stabilize linac beam energy and orbits, as well as some accelerator equipment, about thirty software beam feedback loops have been installed. They have been utilized routinely in all beam modes, and have improved its beam quality. Since its software interfaces are standardized, it is easy to add new feedback loops simply defining monitors and actuators.
△ Less
Submitted 11 September, 2000; v1 submitted 18 August, 2000;
originally announced August 2000.